Loading…
Loading…
3,479 results • Best match
PROVN OF 02XSTP AT JNE COMPLEX AND 01 NO STP AT OTHER LOCATION UNDER GE (N) UDHAMPUR
Designing (Hydraulically . Structurally and aesthetically), Providing constructing hydraulic testing, commissioning of sewage treatment plant (450 KLD Capacity) consisting of coarse bar screening chamber (RCC) with steel screening (Manual), receiving sump RCC, Submersible pumps in receiving sump, stilling chamber in RCC, fine bar screen chamber ( Manual) RCC with steel screen, oil & grease remover (RCC), Grit separator equalization tank (two tank of 50% capacity each), air grid for equalization tank, feed pumps 02 No's, moving bed Bio reactor (s) with plastic media of appropriate density , size and quality to keep very high MLSS greater than 15000mg / litre). Air blowers for MBBR (02 No's), tube settlers assay, sludge pump screw type 02 No's Sludge dewatering centrifugal, sludge holding tank, Air grid for sludge holding, chlorine dozing system chlorine contact tank, foundation for all E/M equipment's, associated piping work with reqd valves, gates, drains, pathways, electrical control panel with inter connecting cable, spare parts for 2 years of operation, etc. complete as turned key job with all involved civil, electrical, digital and mechanical works as per detail specification for civil, electrical and mechanical components with all duties and taxes complete. Also refer important notes below:-) for Tertiary treatment it also include filter feed tank of RCC, Filter feed pump, Dual media filter, activated carbon filter, treated water tank in RCC. Treated water can also been used for irrigation, horticulture, fire fighting and MT wash. (Contd.../)
upgradation of SCADA system for synchronized operation of all electromechanical equipments along with requisite license software both engineering and operating license for 6 MLD STP alluchibagh 2.21 MLD STP Rajbagh
Providing, installation, testing and commissioning of following :- 1. Ultrasonic Level Transmitter of Range 0-10 Mtr for Main Sump also to be integrated with Existing SCADA as per the plant operational requirement. LU 240 (02 nos) Make (Siemens/Allen Bredley/Equivalent) 2. Hydrostatic Level Transmitter of Range 0-10 Mtr for anoxic chambers also to be integrated with Existing SCADA as per the plant operational requirement.(02 nos ) Make (Siemens/Allen Bredley/Equivalent) 3. DO Sensor Of Range 0-10 MG/L Mtr for Anoxic chambers with controller & Display with sensors and is to be integrated with Existing SCADA as per the plant operational requirement.(02 nos) Make (Siemens/Allen Bredley/Equivalent) 4. Chlorine Leak Detector Sensor for leak detection with Leak Alarm system to be displayed in SCADA and to be integrated with Existing SCADA as per the plant operational requirement (01 nos) Make (Honeywell / Reputed) 5. Butterfly valve for anoxic chamber along with their Feedbacks like open, close feedback to be displayed in SCADA and also to be integrated with Existing SCADA as per the plant operational requirement .The valve should be capable of manual operation to bring the system fail safe (0-1 Bar ) pressure to be sustained by valve.(02 nos)...Contd as per Annexure A.
Routine Civil maintenance of water supply system, STP, UGD, Sanitary system and house keeping at Kargal colony
Providing Alum required in Water Treatment Plant at Kargal colony, inluding all lead and lift, tranportation as per the direction of engineer incharge.
Laying of Atactic Poly Propylene APP membrane at STP-II building roof
Supplying & laying 3mm thick pre-fabricated plastomeric water proofing membrane conforming to EN 12311-1 & ASTMD 5147, manufactured with atactic poly propylene (APP) modified premium grade asphalt , specially reinforced with non-woven polyester core with polyester reinforcement @160 gms per sqm & both faces covered with thermo-fusible polyethylene film /MineraL on top face over a coat of primer @ 0.40 lit/sqm of manufacturer's specification on smooth,clean dry surface prepared wherever required.Lap joint shall be provided of 75 mm in longitudinal & 100 mm in transverse direction and fused using LPG/ Propane torch employing extra care ensuring full bondage, complete removal of entrapped air and sealing edges into grooves in appropriate manner as per direction of Engineer -in-charge all complete including materials,labour and applicable taxes. (Payment shall be made on the basis of finished surface area.). Membrane Property: Softening Point > 150 deg C, Cold Flexibility -6 deg C, Tensile Strength, N/cm : 600 (longitudinal), 450 (transverse), Tearing Strength, N: 300 (longitudinal), 200 (transverse)
Cylinder Maintenance and Handling Service - Statutory testing & Painting(STP); Domestic; 14.2 Kg
Cylinder Maintenance and Handling Service - Statutory testing & Painting(STP); Domestic; 14.2 Kg
COMPREHENSIVE MAINTAINANCE OF STP AND ETP PLANT OF WENLOCK DISTRICT HOSPITAL MANGALORE
MAINTAINANCE OF STP & ETP PLANT