Loading…
Loading…
3,441 results • Best match
Rejuvenation of Gornalli lake includes diversion of secondary treated water from STP to the lake in Bidar City Corporation under Amrut-2.0
Water Quality Analyzer : Supply, Installation, Testing, and Commissioning of Online Continuous Effluent Monitoring System (OCEMS) for Sewage Treatment Plant Self-Surveillance in Compliance with CPCB S...
REPAIR MAINT OF EXTERNAL CI DI GI PIPE LINES MOTOR AND PUMP STES STP CLEANING OF UG OH SUMP AND MISC CONNECTED ITEMS AT A A BANAR UNDER GE BANAR
Supply, testing of water quality upto pertabely adding calcium hypochloride 65%-70% chlorine contebnt (calcium based granular) for drinking water, disifectant for water treatment packed in 45 kg drum complete all as specified and directed,
Matunga Workshop - Comprehensive contract for operation to STP of 40 KLD (Near BTC) for 24 Months at Matunga WOrkshop.
1-Matunga Workshop - Comprehensive contract for operation to STP of
REPAIR/ MAINT OF STP, SWIMMING POOL AND CLEANING OF OHT , UG SUMPS AND CONNECTED ITEMS AF UNDER GE AVADI
Material & labour for replacement of media in Pressure sand filter and Activated carbon filter and replacing with new media suitable for STP plant of capacity 500 LPD ( DC-I & DC-III STP Plant) complete all as specified and as directed.
Removal of sludge from reservoir of sewerage pump house no 1, 3 and DJ Complex STP for 2026-2027.
complete the pending work by getting 11 meter PCC pole from the storage centre in place of STP pole.