Construction of desilting basin at outlet of plant drain and Gate inplant boundary near coal gate Township at North Karanpura STP
3.4 Water Complete Testing as per IS:456-2000 Burette, conical flask, pipette etc. B Testing Once for each source and thereafter yearly in case of borewell. If water is used from open source like river, stream, canal etc., then water testing is to be done quarterly. IS:456-2000/ Tech. spec. TR Ö
Enquiry of Work for Conducting UPV and Rebound Hammer Test on TG Bearing Pedestal No. 04 of Unit No. 11 of PH-IV, STPS, MPPGCL, Sarni.
Construction of Bituminous Road from Ash Gate of STPS to Poradih Intersection and repairing and maintenance of existing Plant Peripheral Road up to Railway Level Crossing
JOB: Construction of Bituminous Road from Ash Gate of STPS to Poradih Intersection and repairing & maintenance of exipsting Plant Peripheral Road up to Railway Level Crossing. NOTE: For detail description of works/items, please see 'Schedule of Work' as enclosed alonghwith NIT.
Biennial Rate contract 2026 to 2028 for Topographical survey and computation of Volume of coal stockpiles and other material Stockpiles using drone at NTPC Khargone STPS.
Remodelling of existing pump house for sludge drain and construction of STP for supplying treated water to various parks in Sunder Nagri and adjoining areas.
SITC of mechanical grit unit suitable for removal of grit and heavy inorganic particles from raw sewage during preliminary treatment, complete with grit removal mechanism, drive arrangement, frame, supports, anchor bolts, fasteners, and all necessary accessories, Application: Preliminary Treatment – Grit Removal Unit Size: 0.8 m (L) × 0.8 m (W) × 0.6 m LD Grit Contact & Wetted Parts: SS-304 / SS-316 Power Consumption: 2.2 KW Each Frame & Supporting Structure: SS / MS epoxy coated, suitable for sewage envionment
Estimate for the tests to be carried out monthly and quaterly to inlet and outlet samples of Vidyaranyapuram STP Mysore