Loading…
Loading…
3,441 results • Best match
Operation and maintenance of 25 KLD STP at Dist. Park I.P extension and Nehru enclave for Two year(Specialized Work)
COMPREHENSIVE OPERATION & MAINTENANCE Of Existing Prefabricated packaged/Portable Container based WWTP of 25 KLD capacity and all other allied works/structures etc. The O & M includes daily operation of STP including all cost of labour, consumables, chemicals, repair/replacement of E & M parts, Deployment of operators and technicians, Regular cleaning of screens, tanks, channels, pipelines, and dewatering of sludge from sludge holding tanks to sludge drying beds, Refilling and monitoring of MBBR bio-media, logbook maintenance, flow meter maintenance/replacement whenever required, Compliance with environmental norms, including assistance during site visits/inspections etc. as required all complete as per direction of Engineer-In-charge. Payment to agency shall be released on quarterly basis on pro rata bases. No payment shall be made on account of any escalation of prices. Duties during O & M, plant shall be run 24/7. Testing of treated water quality as per CPCB/SPCB norms on quarterly basis or as per direction of Engineer-In-charge. The scope of item includes comprehensive maintenance for the STP including all spared supply and consumables. Non-compliance of O & M requirement shall make the agency liable for recovery from the security deposit/performance guarantee and/or BG with DDA.
REPAIR/ MAINTENANCE OF LIGHTING CONDUCTOR ALONGWITH CONNECTED ITEMS AND REPAIR REPLACEMENT OF STP AT DALHOUSIE CANTT UNDER AGE(I) DALHOUSIE
M & L for cleaning of MBBR Tank -02 Nos , Tube setler Tank -01 Nos, Filter Feed Tank -01 Nos and Treated water Tanks -01 No for STP plant (capacity 200 KLd MAP Banikhet) with complete inlet and outlet MS pipe line connection for tank through proper openeing of nut bolt and washers inlet, outlet and drain out MS pipe line for the tank and washing and cleaning choked mug perticals inside the MS pipe line and Tank with cleaning of MBBR media, tube duct media inside the tank by using of sodium hydroxide with brush and water pressure and reassemble complete inlet outlet and drain out connection with nut, bolt and washer and refilling of Cleaned MBBR media and Tube duct media inside the tank and proper connection complete testing of the plant all as specified and directed by Engineer-in-Charge. Note:- Requirment for new MBBR media and Tube duct media in replacement of broken/ reduce qty in tank will be measured and paid separately.
WORK OF PROVIDING AND COMMISSIONING OF BIOGAS ENGINE AT 60 MLD STP AT CHALLAGHATTA VALLEY COMING UNDER EE(WWM-TV) DIVISION (2nd Call)
Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied ...
Cleaning of silt from CT basin and tit-bit repair and maintenance work at Cooling Tower of unit 6 during upcoming overhauling of Unit 6 of STPS
JOB: Cleaning of silt from CT basin and tit-bit repair & maintenance work at Cooling Tower of unit-6 during upcoming overhauling of Unit#6 of STPS. NOTE: For detail description of works/items, please see 'Schedule of Work' as enclosed alonghwith NIT.
One time Special Repair and Maintenance of sewer line and replacement of existing damaged GI Pipe line of shopping complex in sector 3 to 7 STPS Sarni
QUESTIONNAIRE Tender Specification No. 08-004/STPS/P&W/Civil/Cwt-5089/TID-2026_MPPGC_474897_1
The work of Computerized Flow analysis and Manufacture, Supply and Erection of Diverter plates and Refractory of Boiler of 2x250 MW Unit no. 10, STPS, MPPGCL, Sarni
QUESTIONNAIRE: Tender No. 08-004/STPS/P&W/SE(MM)/BMD-IV/WT-5187/TID-2026_MPPGC__5148291/ 302 Sarni Date:11.06.2026