Loading…
Loading…
3,441 results • Best match
CONSTRUCTION OF STP MPS AND IPS LAYING OF SEWERAGE NETWORK AND CONSTRUCTION OF MANHOLES AT VILLAGE KAIMRI. CONSTRUCTION OF R/W PUMPING STATION, 3rd WATER WORKS, PROP. BOOSTING STATION, UPGRADATION OF 2nd WATER WORKS AND LAYING THE PIPE LINE
1. STP (SEWAGE TREATMENT PLANT): 2.00 MLD: Design, construction, erection, testing and commissioning of 2.00 MLD capacity Sewage Treatment Plant based on Sequential Batch Reactor (SBR) including Electrical, Mechanical, Piping and Instrumentation work with PLC and SCADA arrangement for STP integrated with MPS including furniture and laboratory equipments as per detail and specifications mentioned in attached additional documents along with following provisions: 1.1 1 High Mast of 9 mtr GI Octagonal pole of 4 mm thickness (T=100 mm, B=200mm, Base Plate = 320 x 320 x 20 mm), Window at 500 mm from Base Plate with 4 No. LED suitable size, outdoor type energy efficient lamps on each pole , 2 LED outdoor light with 6 m. high GI pole along road / path including all accessories complete in all respect. 1.2 Supply and fixing of 1 No. 3.65 m wide SS 304 main Gate along with1.25 m. wide wicket gate at STP to the entire satisfaction of Engineer-in-charge. (Total weight not less than 500 kg). 1.3 CC TV CAMERAS: Providing and Installing 6 CCTV Cameras (4 Cameras for STP and 2 Camera at MPS-1) within 96 hours of signing the agreement along with 120 days recording (DVR), 48 inch LED Screen, 16 Channel DVR at STP and MPS Site with connectors, cables, poles and power supply with online real-time output facility. The cameras at MPS and STP shall be synchronized at STP site complete in all respect. PTZ speed dome 360 degree 50X zoom camera, CP Plus Internet Protocol minimum 5 MP WDR, Night vision color mode, IR range up to 150 m. CCTV Cameras should be installed and commissioned before starting of the work.Make: Sony / Canon / Panasonic / Samsung 1.4 EWQMS (Effluent water quality monitoring system): Supply, Installation, Testing, Commissioning, Operation and Comprehensive Annual Maintenance of effluent quality monitoring system at 2.00 MLD capacity STP for online (continuous) measurement of PH, Total Suspended Solids (TSS), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD) by single analyzer with various sensors (spectral measurement in the UV-VIS range 200-720 mm) performing reagent and chemical free analysis with automatic cleaning of censor, signal cables and power cables, local data acquisition and display of data on continuous basis for up linking the data to CPCB, HSPCB and PHED, TUV approved complete in all respect as per Central Pollution Control Board (CPCB) guidelines for online continuous monitoring system for effluents. 1.4.1 Multi-parameter measuring converter, for connecting up to 18 intelligent sensors Scope including 8 analog inputs / outputs (4 inputs and 4 outputs) (0/4-20Ma), wide- range power supply Optical COD/BOD and TSS probe with spectral processing of the UV-VIS range, for measurement in the outlet / effluent of 2.00 MLD capacity STP with integrated with automatic cleaning complete in all respect. 1.4.2 Robust digital pH/ORP sensor for pH/ORP electrodes, with built-in pre-amplifier and temperature sensor with Automatic Temperature Compensation (ATC) Cable length 100 Meter (minimum) complete in all respect. 1.4.3 Sensor adapter cable for all intelligent sensors, with IP68 water proof connection to the intelligent Sensor Net system. Cable length 100 meter (minimum) complete in all respect. 1.4.4 Data transfer to CPCB, HSPCB and PHED servers complete in all respect. 1.4.5 Providing GSM 3G, 4G modem with mobile network connectivity including network including complete in all respect. 1.5 Conveyance of treated effluent from cholorine contact tank to effluent collection tank through suitable size DI K9 pipe along with cost of pipe, sluice valves, specials, material and labour complete in all respect.
Comprehensive Operation & Maintenance with Repairing of all Electrical & Mechanical Equipments & Instruments of 12 Nos Sewage Pumping Station of East Zone STP Department for Three Years
Sewage Treatment Plant Department
Periodic Overhauling (POH) of different types of Auxiliary Transformer (AT) between Section LJN-GKC & BUW-STP of Lucknow Division N.E. Railway.
Manpower Supply Work For Operation And Maintenance Of 200 KLD And 450 KLD STP Constructed Near Kaliyasot River For 01 Year
Manpower Supply Work For Operation And Maintenance Of 200 KLD And 450 KLD STP Constructed Near Kaliyasot River For 01 Year
Up gradation of 100mm to 150mm dia DI sewer pipe line from existing chamber to Corner House to STP Snowdon Network.
Stone soling properly hand packed filling interstices with kharanja stone and chamber including spreading watering and rolling of biding material moorum or earth etc.
Providing Services of operation and maintenance of 300 KLD capacity STP at Dadar Pumping Station for the period of 1 year.
Providing services of operation & maintenance of 300 KLD capacity STP at Dadar Pumping Station for the period of 1 year.