Loading…
Loading…
3,441 results • Best match
Rehabilitation and Repair at 7 MLD STP Sahnewal and all other works contingent thereto Distt Ludhiana Under Jal Hi Amrit
Rehabilitation and Repair at 7 MLD STP Sahnewal Ludhiana, Distt. Ludhiana (Under Jal Hi Amrit).
Sub Head- Operation/maintenance of STP and sewer distribution system, Lab ) Labour Component Zone-III (2.49 MLD) for three years.
Operation and maintenance of all civil works, electro-mechanical equipements relating to sewerage system of Mata Shri Chintpurni Ji which consist of sewerage treatment plant of Zone - III (2.49 MLD) capacity and sewerage net work for a period of 36 Months having existing structures like Inlet chamber, Manual screen channels, manual grit channels, extended aeration tank, settling tank, lime closing tank, sludge well, filter press house, sludge holding tank, chloirine contact tank, bleaching dozer, Administration cum MEP room, septic tank and soak pit , including Online concent Management FEE Per Plant HPPCB Sampling fee as per norms and transpotation charges.Firm should do comply the stringent effluent standards laid down by HP Pollution control board and terms and conditions as per Jal Shakti department. Also Operation and maintenance of Sewerage network with Sewer connections for three years by tracing the embedded inspection chamber/manhole by removing extra earth carefully above the cover , lifting the cover & cleaning of silt, sludge, brick bats, polythene bags, canteen waste, garbage & any kind of other material if any from choked manholes/chambers pipe line under ground level/ at all levels and dewatering with all tools & safety equipments such as buckets, rope safety belt, gas mask pump mechanical cleaning devices oxygen cylinder etc including disposal of silt, sludge, upto desired location/ dumping ground , cleaning of choked sewer lines of all dia and depths with necessary safety precautions should be taken to avoid any of the accidents & injuries to any of the workers & people around the job as per the direction of the Engineer-in-charge within all leads and lifts complete in all respect.
(Sub Head- Operation/maintenance of STP and sewer distribution system, Lab ) Labour Component Zone-I (0.57 MLD) for three years.
Operation and maintenance of all civil works, electro-mechanical equipements relating to sewerage system of Mata Shri Chintpurni Ji which consist of sewerage treatment plant of Zone - I (0.57 MLD) capacity and sewerage net work for a period of 36 Months having existing structures like Inlet chamber, Manual screen channels, manual grit channels, extended aeration tank, settling tank, lime closing tank, sludge well, filter press house, sludge holding tank, chloirine contact tank, bleaching dozer, Administration cum MEP room, septic tank and soak pit , including Online concent Management FEE Per Plant HPPCB Sampling fee as per norms and transpotation charges.Firm should do comply the stringent effluent standards laid down by HP Pollution control board and terms and conditions as per Jal Shakti department. Also Operation and maintenance of Sewerage network with Sewer connections for three years by tracing the embedded inspection chamber/manhole by removing extra earth carefully above the cover , lifting the cover & cleaning of silt, sludge, brick bats, polythene bags, canteen waste, garbage & any kind of other material if any from choked manholes/chambers pipe line under ground level/ at all levels and dewatering with all tools & safety equipments such as buckets, rope safety belt, gas mask pump mechanical cleaning devices oxygen cylinder etc including disposal of silt, sludge, upto desired location/ dumping ground , cleaning of choked sewer lines of all dia and depths with necessary safety precautions should be taken to avoid any of the accidents & injuries to any of the workers & people around the job as per the direction of the Engineer-in-charge within all leads and lifts complete in all respect.
(Sub Head- Operation/maintenance of STP and sewer distribution system, Lab ) Labour Component Zone-II (2.01 MLD) for three years.
Operation and maintenance of all civil works, electro-mechanical equipements relating to sewerage system of Mata Shri Chintpurni Ji which consist of sewerage treatment plant of Zone -II (2.01 MLD) capacity and sewerage net work for a period of 36 Months having existing structures like Inlet chamber, Manual screen channels, manual grit channels, extended aeration tank, settling tank, lime closing tank, sludge well, filter press house, sludge holding tank, chloirine contact tank, bleaching dozer, Administration cum MEP room, septic tank and soak pit , including Online concent Management FEE Per Plant HPPCB Sampling fee as per norms and transpotation charges.Firm should do comply the stringent effluent standards laid down by HP Pollution control board and terms and conditions as per Jal Shakti department. Also Operation and maintenance of Sewerage network with Sewer connections for three years by tracing the embedded inspection chamber/manhole by removing extra earth carefully above the cover , lifting the cover & cleaning of silt, sludge, brick bats, polythene bags, canteen waste, garbage & any kind of other material if any from choked manholes/chambers pipe line under ground level/ at all levels and dewatering with all tools & safety equipments such as buckets, rope safety belt, gas mask pump mechanical cleaning devices oxygen cylinder etc including disposal of silt, sludge, upto desired location/ dumping ground , cleaning of choked sewer lines of all dia and depths with necessary safety precautions should be taken to avoid any of the accidents & injuries to any of the workers & people around the job as per the direction of the Engineer-in-charge within all leads and lifts complete in all respect.
Const of boundary wall 4 MLD STP Samrala and all other works contingent thereto Dist Ldh Under Jal Hi Amrit
Const. of boundary wall at 4 MLD STP Samrala and all other works contingent thereto Distt. Ludhiana (Under Jal Hi Amrit).
REPAIR MAINT OF SEWAGE LINE SEPTIC TANK MANHOLE STP INCL CLEANING WORK OF DRAIN IN NEW CANTT UNDER GE GANGTOK
Returning, filling in, including spreading levelling watering and well ramming in layers not exceeding 25 cms in thick as in soft/loose soils complete all as specified and directed.