Loading…
Loading…
17,487 results • Best match
REPAIR / MAINTENANCE OF RAW SEWAGE TREATMENT PLANT PS-I TO IV ALONGWITH ASSOCIATED TREATED WATER INSTALLATION SYSTEM AT AF-I UNDER GE (AF) JAMNAGAR NO.2
Material and labour for cleaning of, RCC under ground, raw sewage collection sump of size 7.50 metre dia, 5 metre depth & 0.2 metre free board at PS-I, PS-II ans PS-III, by bailing out complete sewage grey water and the accumulated sediments, sludge and foreign particles etc, scrubbing out deposited material, brushing and removing all the dirt / sludge deposited on the walls / floor etc and removing the sewage material from site and deposited at a distance exc 250 metre but not exceeding 500 metre, washing / cleaning of tank with fresh water complete all as specified and directed.
Construction of Compound wall and Other Related Work at Chikhali Sewage Treatment Plant.
eProcurement System Government of Maharashtra Created By: chetan Gujarathi Created Date/Time: 04-Dec-2025 03:47 PM Tender Title: Construction of Compound wall and Other Related Work at Chikhali Sewage Treatment Plant. Tender ID: 2025_PCMCP_1236051_5
(SH Establishment of FSSM Co- Treatment System Capacity 20 KLD Along with Existing Sewage Treatment Plant)
Excavation in foundation, trenches etc. in earth work, in all kinds of soil such as pick work, jumper work, blasting work in hard / soft rocks, chiseling / wedging out of hard / soft rocks including dewatering in saturated soil up to all leads and lifts, staking the excavated soil / materials upto all leads and lifts clear from the edge of excavation and then returning the stacked excavated soil in all layers when required into plinths sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as per direction of Engineer -in-Charge.
Custom Bid for Services - ---- Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Custom Bid for Services - ---- Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Installation of Online Continuous Emission Monitoring System at Sewage Treatment Plant
Supply of COD, BOD, TSS, pH, FC Module with Data Logger & Dashboard The Spectrophotometer System shall be an advanced online water and wastewater monitoring solution designed for continuous, real-time analysis of critical water quality parameters. The system includes an integrated online analyzer capable of measuring Chemical Oxygen Demand (COD), Biological Oxygen Demand (BODc), Total Suspended Solids (TSS), pH, and Free Chlorine (FC) using spectrophotometric and sensor-based measurement techniques The data loggher shall be housed in an MS ecnlosure made of 14/16 SWG cRCA sheet with IP54 proectetion . The panel shall be floor mounted with MS stand. The system should consists of follwong components. a) Spectrophotometer b) Online COD, BOD , TSS analyser + controller c) Cbinet integrated Module . d) pH sensor e) DDG data Logger f) Power supply unit
Interception And Diversion work for tapping nallah and setup sewage treatment plant for Used water management for AMANGANJ Town
Interception & Diversion work for tapping nallah and setup sewage treatment plant for Used water management for AMANGANJ Town