Loading…
Loading…
17,861 results • Best match
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; The service provider should be OEM/OEM Authorized Service Provider (ASP)/specialized agency (having experience as per bid conditions); Under AMC and functional
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; The service provider should be OEM/OEM Authorized Service Provider (ASP)/specialized agency (having experience as per bid conditions); Under AMC and functional
Construction regarding and raising of boundary wall with security gates at DTC Terminal plot and sewage treatment plant in A-block, SRS Colony Bawana AC-07 (PID-18450)
PERIODICAL SERVICE MAINT REPAIR OF SEWAGE TREATMENT PLANT OF CAPACITY 0.5 MLD, FIRE FIGHTINING SYSTEMS OTHER MISC WORKS AT DOMESTIC ANDTECHNICAL AREA AND SEWAGE TREATMENT PLANT OF CAPACITY 1 MLD, FIRE FIGHTINING SYSTEM AND OTHER MISC E/M WORKS
Supply Installation Testing and Commissioning of necessary machinery along with execution of allied civil works for the required improvements at the Sewage Treatment Plants located at Akurdi Ravet Chinchwad Bhatnagar Bhosari 5 MLD Keshav Nagar Walhek
Supply installiation testing and commissioning of necessary maachinery along with executiion of allied civil works for the required improvements at the sewage treatment plants located at akurdi ravet chinchwad bhatnagar bhosari 5 mld keshavnagar walhekarwadi and pimple nilakh under the jal hi amrut initiative
Supply, installation and commissioning of various special analysers for measuring (BOD, COD, TSS and PH) and Online monitoring software for Sewage Treatment Plants with data connectivity at Dubrayapet, and Lawspet, Puducherry
Spectrometry Sensor for Detection of BOD/COD/TSS etc. • Measurement Principle: Measurement of full wave lengths spectra • (UV-VIS Spectrometry) from 200-720 nm, • Multi parameter probe ideal for monitoring of BOD/COD/TSS in Waste water • Direct in-situ measurement in inlet/outlet of waste water treatment plant • The sensor with efficient integrated ultrasonic cleaning facility. If the ultrasonic cleaning can't be provided then the bidder should include the air-pressure cleaning system to ensure long maintenance intervals for this sensor. • The Material of construction is Titanium or equivalent. • The sensor is completely reagent free for operation. Measurement Principle: Uv Vis Spectrometry (200-720 nm) Light Source: Xenon Flash Lamp Accuracy in Standard Solutions: +_3% of the measured value or +_2.5 mg/l Ambient Conditions: Operating temperature: 0 deg * C to 45 deg * C Storage temperature: - 10 deg * Cto + 50 deg * C Carbon parameters To measure the organic load of water, the parameters COD or BOD are used. The differences in these parameters (marginal column) show that these measurements are not identical and that the measured values therefore cannot be equal. In-situ measurement Continuous measurement => fast response time, suitable for control strategies CarboVis® 705 IQ TS
Providing Sewage Treatment Plant STP 100 KLD and Effluent Treatment Plant ETP 10KLD for the work of Construction of 50 bedded Critical Care block and MCH wing in Government Hospital at Sivakasi in Virudhunagar District