Loading…
Loading…
20,775 results • Latest
Renovation and repairing of Six (6) number community toilets community toilets at ward no-14, Barasat Municipality, Mouza- Banamalipur, Barasat, North 24 Parganas.
HDR Brachytherapy for IPGME and R and SSKM Hospital(Package K)
Acid Distillation System
Repairing and allied works at Barasat Division office and compound under Barasat Division (PWD) during the year 2024-25
Emergent Road Maintenance work during monsoon at various roads under Habra Highway Sub Division under Barasat Highway Division No II in the District of North 24 Parganas
Operation and Maintenance of water supply system at Silicon Valley and AA-IIE Head work site within Action Area II under New Town Kolkata Water Supply Division-I, P.H.E Dte. for the period from 01.07.2026 to 31.03.2027 (09 Months)
CUSTOMIZATION AND IMPLEMENTATION OF GST MODULE IN EXISTING ERP MICROSOFT DYNAMICS NAV 2009 SP1 OF WBEIDC LTD
Repairing and renovation works of Drugs control under Barasat Division PWD during the year 2024-25
HDR Brachytherapy for Murshidabad MCH(Package I)
Emergent Repair, Painting and Replacement of Sanitary and Plumbing Fittings of 10 nos. Spectators Toilet at 11 Mtr. Level and with necessary allied works at Vivekananda Yuba Bharati Krirangan during the Year 2026-2027.
Patsimulia Boaldah Road Patch repairing work from Ch. 7.00 Kmp to Ch. 10.81 Kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
Entry and Mid Level Desktop Computer (Q2), Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
Construction of outer wall and allied works at newly constructed Gopal Chandra Memorial College under Madhyamgram Municipality in the district of North 24 Parganas
Supplying , Fitting and Fixing of Fire Extinguisher for fire Safety of Ashokenagar State General Hospital at Ashoknagar in the District of North 24 Parganas.
CT Simulator (4D) for IPGME and R and SSKM Hospital(Package H)
Operation Maintenance of Water Supply System at Eco-Tourism Park including Eco-Island within Action Area II under New Town Kolkata W/S.Division -I,PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
Emergent replacement of of damaged HP Culvert at 0.45 KMP of Rafipur Padmalavpur Kankinara Road under Barasat Highway Division No II, P.W.Rds. Dte. in the District of North 24 Parganas.
Restoration estimate for proposed DI pipeline for secondary Rising Main from Chainage 14.600 kmp to 14.900 kmp along the KBMH Road for integrated surface water based piped water supply scheme for Arsenic Affected Block of Baduria under Barasat Divn
NIT for selection of agencies to operate the Bevco-Retail shop(s) under Revenue Sharing Franchisee Model, in the Alipurduar District.
Emergent Repair and Replacement of Rain Water Pipe and with necessary allied works at Vivekananda Yuba Bharati Krirangan during the Year 2026-2027.
Gangrapota Sundarpur Road from Ch. 0.00 Kmp to Ch. 2.00 Kmp, Emergent Patch repairing work in stretches under Barasat Highway Division No II in the district of North 24 Parganas.
Operation Maintenance of Water Supply System at CBD (South) within AA-II under New Town Kolkata W/S. Division -I PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
CT Simulator (4D) for Murshidabad MCH(Package F)
Periodical Cleaning works of office compound and over head tank of Barasat Highway Division II, P.W Roads D in the district of 24 parganas North from 1st October 2026 15th March 2027 during the year 2026 2027
Mallickpur Gobardanga Maslandpur Road Patch repairing work from Ch. 0.325 Km to Ch. 1.905 Km in stretches under Barasat Highway Division No. II in the district of North 24 Parganas.
Operation Maintenance of Water Supply System at AA- II-G , II-F, (Tank No- 18) under New Town Kolkata W/S.Division -I, PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
Barasat Byepass Road from 10.00 km to 11.90 Km Emergent Patch Repairing work under Barasat Highway Division No.II in the District of North 24 Parganas.
High Energy LINAC for IPGME and R and SSKM Hospital(Package D)
Repairing of Bongaon-Bagdah-Boyra Road Ch. From 0.00 kmp to 2.00 kmp under Bongaon Sub-Division, PWD during the year 2024-25
Emergent Repair, Painting and Replacement of Sanitary and Plumbing Fittings of 10 nos. Spectators Toilet at 5 Mtr. Level and with necessary allied works at Vivekananda Yuba Bharati Krirangan during the Year 2026-2027.
Maslandapur Ghoshpur Salua Charghat Road Patch repairing work from Ch. 0.00 Kmp to Ch. 3.00 Kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
MINI HIGH MAST LIGHT PART NO-214, AT GANGAPUR, DUTTAPUKUR-I G.P. Scheme ID APAS-01-102-214-0003.
Repairing of Helencha-Sindrani-Duttafulia Road Ch. From 4.00 kmp to 6.00 kmp under Bongaon Sub-Division, PWD during the year 2024-25
High Energy LINAC for COM and Sagore Dutta Hospital(Package C)
Operation Maintenance of Water Supply System at AA-IIA (Tank-17) under New Town Kolkata W/S.Division -I,PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
Repairing of Bongaon-Bagdah-Boyra Road Ch. From 7.00 kmp to 10.00 kmp under Bongaon Sub-Division, PWD during the year 2024-25
Moyna Madhabpur Road from 1.10 kmp to 2.10 kmp and 2.50 kmp to 3.50 kmp emergent potholes repairing Work under Barasat Highway Division No II, P.W.Rds. Dte. in the District of North 24 Parganas
ASCERTAIN THE RATE PER PCS OF STEEL TRUNK
STREET LIGHT FROM GHOSHPARA HO ANANTA GHOSH TO HO KALLOL CHOWDHURY. PART NO - 212. Scheme ID APAS-01-102-212-0007.
Repairing of Helencha -Sindrani-Duttafulia Road Ch. From 8.00 kmp to 10.00 kmp under Bongaon Sub-Division, PWD during the year 2024-25
Operation Maintenance of Water Supply System at AA-II-B (Part-III) (Tank No-16) under New Town Kolkata W/S.Division -I, PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
Construction of concrete block road from burial ground to kanak Sarkar road, approach road of dumping ground at ward no 05 under Taki Municipality
High Energy LINAC for Murshidabad MCH(Package B)
Madhabpur Kakinara Road from 2.00 kmp to 8.00 kmp emergent potholes repairing Work under Barasat Highway Division No II, P.W.Rds. Dte. in the District of North 24 Parganas
STREET SOLAR LIGHT FROM HO PINTU TARAFDER TO HO GOPAL SAHA. PART NO - 212. Scheme ID APAS-01-102-212-0017.
Beliaghata Prithiba Road from 4.00 kmp to 6.00 kmp emergent potholes repairing Work under Barasat Highway Division No II, P.W. Rds. Dte. in the District of North 24 Parganas
Installation of Water A.T.M at the front of Minto Mondals house, Block- Basirhat-II , Mouza- Nadia, G.P-Dhanyakuria.
STREET SOLAR LIGHT FROM HO PAPAN BISWAS TO HO SUJAY DAS. PART NO - 212. Scheme ID APAS-01-102-212-0018.
Annual maintenance of Street Tap, Tap line, Platform and Surface drain in Ward No. 14 under Borough III of Bidhannagar Municipal Corporation . For One Year (365 Days)
Operation Maintenance of Water Supply System at AA-II-B (Part-II) (Tank No-15) under New Town Kolkata W/S. Division -I, PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)