Annual maintenance and repairing of 3 Phase Automatic Float Boost Battery Charger for 110 Volt including 150 AH Lead Acetate Battery Bank at Bagjola Pumping Station during the year 202627
Day to day repairing and maintenance work at Barasat District Hospital at Barasat under Barasat Division (PWD), North 24 Parganas during the year 2024-25
Internal Combustion Engine Crankcase Oils for Automotive Application (V2) Conforming to IS 13656 (Q3) (3 (3 ))
Supply and Commissioning of 3-Channel Ambulatory ECG - Holter Monitoring System for the Dept. of Cardiology at Calcutta National Medical College and Hospital
Construction of Shed at Rajbari Hospital within Hatgachhi GP under Sandeshkhali I Panchayat Samity North 24 Parganas 15th FC Untied 2025 26
Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the (a) O.H.R. site including D.P.S. of AA- IIC (Tank No. 13) (Stack Yard 4), (b) IIC STP and (c) O.H.R. site at AA-IIB (Tank No. 14 )
construction of Cover drain from Samui house to Ananta Mondal house via Sukumar Singha Roy house at bilkanda-I G.P under barackpore-II BLOCK.
Supply of chemical and other consumable for operation and maintenance of Sridharkati w/s scheme (Zone-XXIV), Hingalganj block. Capacity of the plant 3 cum/hr for the period 1 year.
Servicing repairing maintenance of one number 66KV KW HP 467 626 HT motors vide MC No VFHM47842 make Crompton Greaves for 250 Cusec VT pumps at Uttarbhag Pumping Station under MDMD at PS Baruipur Distric South 24 Parganas during the year 202627
Day to day repairing and maintenance work of District Judges Court and POCSO Court building at Barasat under Barasat Division (P.W.Dte.), North 24 Parganas during the year 2024-2025.
Construction of Cover drain from Grapara Unis house to Khalil house via masjid at Bilkanda I G.P under barackpore-II block.
Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the (a)O.H.R. site at AA-IID (Tank No. 11), (b) O.H.R. site including S.L.S./ D.P.S. of AA- IID (Tank No.12), under New Town Kolkata Wa
Day to day repairing and maintenance work of District Judge Bungalow, CJM Bungalow, JM-1 and 2 Bungalow at Barasat under Barasat Division (P.W.Dte.), North 24 Parganas during the year 2024-2025.
Dermascope, Schedule - II
Sreepally Bajitpur Road from Ch. 0.00 Kmp to Ch. 11.00 Km, Traffic calming measures at different locations under Barasat Highway Division No. II, Govt. of West Bengal in the District of North 24 Parganas
Day to day repairing and maintenance work of District Magistrate Bungalow, ADM (G), ADM (T), ADM (LR) and SDO (Barasat Sadar) Bungalow at Barasat under Barasat Division (P.W.Dte.), North 24 Parganas during the year 2024-2025.
Chandpara Bus Stand to Palla Road Patch repairing work from Ch. 0.50 Kmp to Ch. 0.9 Kmp, 1.80 kmp to 3.00 kmp and 3.70 kmp to 6.40 kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
Removal of existing mat, dismantling of wood work EVA cushion installation and re- installation of old mat in badminton court Taruner Swapno Indoor Sports Complex in Bhairab Ganguly College, under Kolkata North Division PWD. during the year 2026-27
Construction of Pucca Drain with Cover Slab Soak Pit from HO Sagotam Sarkar to HO Ramesh Patra at Mirhati Sansad No XVII Mouza Mirhati JL No 66 under Bodai GP of Amdanga Block
11 KV 400 A TPGO Isolator with Polymer Post Insulator.
Supply and Commissioning of 1 (one) units of TMT Machine for the dept of Cardiology, RG Kar MCH, Kolkata
Chandpara Jhawdanga Road Patch repairing work from Ch. 0.00 Kmp to Ch. 6.00 Kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
Day to day repairing and maintenance work of New Administrative Building at Barasat under Barasat Division (P.W.Dte.), North 24 Parganas during the year 2024-2025.
Construction of Boundary wall from HO Saharul Sekh to HO Nazmul Sekh within Hatgachhi G.P. under Sandeshkhali I Panchayat Samity, North 24 Parganas, 5th SFC (Tied), FY 2023 2024
Supply of chemical and other consumable for operation and maintenance of Sridharkati w/s scheme (Zone-XXIII), Hingalganj block. Capacity of the plant 4 cum/hr for the period 1 year.
Chandpara Nahata Akaipur Road Patch repairing work from Ch. 5.30 Kmp to Ch. 8.00 Kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
Restoration work of pipe line laying at Basirhat- Hasnabad road adjacent of left side shoulder near Dandirhat Bazar more (Chainage 6.00 kmp) to Gulaichandi (Chainage 7.30 kmp) high school.
Thakurnagar Crossing to Ramchandrapur Road Patch repairing work from Ch. 1.75 Kmp to Ch. 3.75 and 4.70 Kmp to 5.20 kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
Gobardanga to Gopalpurhat Road Patch repairing work from Ch. 8.20 Kmp to Ch. 11.20 Kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
Gobrapur Mamudpur via Murighata Road Patch repairing work from Ch. 0.00 Kmp to Ch. 3.50 Kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
Operation Maintenance of Water Supply System at Tank No-22 Tank No 23 at AA-IIIG under New Town Kolkata W/S. Division -I, PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
12 KV Outdoor SF6 insulated 3 way RMU consisting of switchgear with Vacuum Interrupter and Metering unit
Repairing Works of Administrative Building of Ichhamati Milk Union at Hatipukur Road, Barasat under Barasat Division (P.W.Dte.)
Operation Maintenance of Water Supply System at Tank No- 21 at AA-III C under New Town Kolkata W/S. Division -I, PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
Procurement of LT Power Cables
Operation Maintenance of Water Supply System at Tank No. 20 at AA-IIIA , IIIB under New Town Kolkata W/S. Division -I, PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)
Installation of Arsenic free water treatment plant near Kalinagar Bazar within Kalinagar GP under Sandeshkhali I Panchayat Samity North 24 Parganas 15th FC Tied 2025 26
Repair and Renovation of ARD office Building at Barasat North 24 Parganas under Barasat Division PWD
for Engagement of an Agency for Providing Security and Housekeeping Services at Bengal Rifle Shooting Academy and Bengal Badminton Academy located at Surer Math Dum Dum
Thakurnagar Ramchandrapur via Sosadanga Road Patch repairing work from Ch. 0.35 Kmp to Ch. 1.90, 2.05 kmp to 2.40 kmp and 3.30 kmp to 4.07 Kmp in stretches under Barasat Highway Division No II in the district of North 24 Parganas
New Temporary Construction of General Toilet Block (Sulav Sauchalay) at Barasat Government Medical College and Hospital, North 24 Parganas
Improvement of IEP, Repairing and renovation of Compressor Room and other related allied works at Bongaon Municipal (Z-II) Water Supply Scheme, Bongaon Block within the jurisdiction of Bongaon Sub-Division under Barasat Division, P.H.E. Dte.
Restoration and Protection work of Road from Sankardah to Khas Sakdah upto Debitala Minakahan
NIT for selection of agencies to operate the Bevco-Retail shop(s) under Revenue Sharing Franchisee Model, in the Alipurduar District
Nilgunj Santoshpur Road from 0.00 kmp to 3.00 kmp emergent potholes repairing Work under Barasat Highway Division No II, P.W.Rds. Dte. in the District of North 24 Parganas.
Procurement of Current Transformers 2nd Call
Operation Maintenance of Water Supply System at Tank No-19 at AA-IIIA ,IIIB under New Town Kolkata W/S. Division -I, PHE Dte. for the period of 01.07.2026 to 31.03.2027 (09 Months)