Loading…
Loading…
20,850 results • Latest
Erection of temporary kitchen Shed cum Dinning Hall with allied works for the use of CAPF to be installed at different 10 (ten) locations under Bidhannagar North PS, South PS and East PS within Bidhannagar Police commissionrate, Salt Lake
Construction of 50 NOS Leach pit with silt chamber Soak pit and others at different sansad of Sarberia Agarhati GP under sandeshkhali I Development block.
Manufacture, testing, supply and delivery of 33 KV Grade Armoured XLPE Cable of size 3CX400 sq. mm.
PADS FOR SUPPORTING GUIDE FOR RADIAL FORGING MACHINEAS PER MSF DRG. NO. RFS/3000/55/R1.
Modification work for installation of MRL Lifts in the office of the West Bengal Board of Primary Education, DK-7/1, Sector-II, Salt Lake City, Kolkata-91 during the year 2024-2025.
CONSTRUCTION OF 6 NOS MASONARY CULVERT AT (1) TAKI ROAD NEAR MONIRUDDIN GAZI AT SANSAD - VII (2) NEAR ANCHAR ALI MONDAL HOUSE AT SANSAD - VIII (3) NEAR AJAMILI SARDAR HOUSE AT SANSAD - X (4) NEAR MATNIA FOOTBALL MATH AT SANSAD - XVI (5) NEAR ARSAD
Paper-based Printing Services - Printing with Material; Book/Booklet; Offset
Paper-based Printing Services - Printing with Material; Book/Booklet; Digital
Engagement of Agency for procurement and supply of quality raw milk to Banglar Dairy Limited , LB 2, Sector III, Salt Lake, Kolkata 700106
Selection of Cost/Chartered Accountant Firm, for closure and compilation of Accounts for the Financial Year 2026-2027
Restoration of embankment from 5.50 Km to 5.60 Km Tentultala along Left bank of river Nonagong at Mouza Chak Kulia Block Deganga in the District of North 24 Parganas
Supplying and laying of interlocking paver block along with some other minor maintenance and repairing works at Saishali Complex in Salt Lake City during the year 2024-2025.
33 KV Grade Armoured XLPE HDPE sheathed Cable of size 1CX1000 sq. mm
INSTALLATION OF SOLER LIGHT FOR DIFFERENT INSTITUTION, MASJID, MADRASHA ETC UNDER GOTRA GRAM PANCHAYET ( 6 NOS )
Construction of 30 NOS Leach pit with silt chamber Soak pit and others at different sansad of Boyermari I GP under sandeshkhali I Development block.
Clearing and removal of water hyacinth under AMC for a period of 12 months from 0.000 Km to 3.000 Km over Panshila Naksha Khal in Block Barasat I Dist. North 24 Pgs.
ASCERTAIN THE RATE CONTRACT PER SHEET OF SELF ADHESIVE STICKER LABEL
TERM CONTRACT FOR ARTIFICERS WORK TO CERTAIN PLACES AT 2 SIKH REGT, CWE (S) AND GE BKP, MES QTR, 49 COY ASC, MAP ACCN, STN HOUSE, AGE B/R AND AGE E/M OFFICE, FURNITURE YARD AT BARRACKPORE CANTT UNDER GE BARRACKPORE
ASCERTAIN THE RATE PER ROLL FOR RATE CONTRACT OF 48 MM B O P P TAPE ROLL, 43MICRON, LENGTH 50 MTR, SINGLE COLOUR LOGO PRINTING
TERM CONTRACT FOR ARTIFICERS WORK TO CERTAIN PLACES AT HQ 122 INF BDE, 122 SIGNAL CENTRE, APS/APPS, STN HQ, TCP, FPO, 52 AALC, LAO OFFICE, ECHS, BH B BLOCK, BI LINE, ETC AT BARRACKPORE CANTT UNDER GE BARRACKPORE
Clearing and removing water hyacinth under AMC for the period of 365 days including thick and thorny jungles of Padma River from ch 0.0 km to 5.0 km within Block and PS Swarupnagar and Baduria Dist North 24 Pgs
Re-construction of damaged sewerage line at the along the periphery of B2 Block within the premises Bidhan Sishu, P.H.E. during the year 2024-2025.
Re-construction of damaged sewerage line at the along the periphery of B1 Block within the premises Bidhan Sishu, P.H.E. during the year 2024-2025.
REPAIR/REPLACEMENT AND MAINTENANCE OF ELECTRICAL WIRING, SUB MAIN WIRING, DISTRIBUTION BOARDS AND MCBs, LIGHT FITTING/FIXTURES INCLUDING MISC ELECTRICAL WORKS AT CERTAIN JCOs and ORs MD ACCN OF MIL STN KANCHRAPARA UNDER GE BARRACKPORE
Infrastructure Development at Village Level for Milk Procurement System in Hooghly, Nadia and Purba Bardhaman under Banglar Dairy Limited, LB 2 , Sector III, Salt lake ,Kolkata 700106
Clearing and removing water hyacinth under AMC for a period of 12 months from Guma Rail Bridge 0.000 Km to Shantinagar 1.500 Km over Shantinagar Khal at Block Habra II in the District of North 24 Parganas
Engagement of Laboratory personnel at 4 (Four) nos. Sub-District Water Testing Laboratory .(Haroa, Basirhat, Gokna and Chandpara) for 1 (one) year.
Upgradation of toilets and laboratory for establishment of international centre of excellence for Data Science, AI and Furturistic Technologies in 2nd floor of vacant space of MAKAUT Building at BF Block, Salt Lake City, during the year 2024-2025.
Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the a) Boosting Station III of AA-III under New Town Kolkata Water Supply Division-I, PHE Dte. for the period from 01.04.2026 to 31.03.
Engagement of Agency for manufacturing of different Bakery products for Banglar Dairy Limited, Prani Sampad Bhawan, LB 2, Sector III, Salt Lake, Kolkata 700106
Supplying Stationery and Misc articles , Forms and Printing and Computer articles for the period from Aug 2024 to March 2025
Engagement of Laboratory personnel at 3 (Three) nos. Sub-District Water Testing Laboratory (Bodai SDL, Habra SDL and Bishnupur) and North 24 Parganas District Water Testing Laboratory for 1 (one) Year.
As Per NIeT and SOQ
Clearing and removing water hyacinth under AMC for the period of 365 days including thick and thorny jungles of Parbati Khal in between ch 0.0 km and 10.0 km for a length of 8.50 km within Block and PS Bongaon Dist North 24 Pgs
Hiring of services of HR agency for engagement of four type of mentors for Handholding support to Gram Panchayats in West Bengal
Proposed research facility (R&D laboratory Buildingalongwith Auditorium) for SAMEER at Bengal Silicon Valley, Tech Hub SB-20, AA-II, New Town, Rajarhat. SH Construction of Workshop building (Gplus1) for SAMEER SW Aluminium Partition with glazing in 1st floor work shop building, fixing stainless steel tactile tile and accessible SS handrail at lift lobby and staircase and chequerred tile at water tank platform.
As per NIeT and SOQ
Construction of Concrete block Pavement from Jessore Road to NAGARIK KAYAN SAMITI In Ward no.-07.
Construction of Drain with Cover Slab and C.C Road and Boundary Wall infront of ADARSHA Girls School and at Chasi Para in Ward No-17
Operation and Comprehensive Maintenance of Medical Gas Pipeline System at Sri Balaram Seva Mandir SGH of West Bengal for 3 years
Construction of Drain with cover slab at Ward Office Lane and Netaji statue area in ward no.-14.
Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the (a) Boosting Station-I, (b) O.H.R. site of AA-IIA and Head Work site (opposite Ecospace, beside Allia University) of AA-II-AF (Tank
Operation and Comprehensive Maintenance of Medical Gas Pipeline System at Naihati SGH of West Bengal for 3 years
Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the a) Head Work site including S.L.S./D.P.S.-VII of CBD Area, (b) O.H.R. site at AA-IIB (Tank No. 15), (c) O.H.R. site at AA-IIB (Ta
Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the a)Head Work Site (Tank No- 7) , b)Head Work Site (Tank No- 8), c)Head Work Site (Tank No- 09), d)Head Work Site under Stackyard-3
Supply,delivery and installation of Godrej-make furniture and storage for various sections of the office of the Chief Engineer, Distribustion Testing Department.
As per NIeT and SOQ
Supplying of Security Personnel (without Arms) on purely temporary basis for guarding to the Office Stack yard godown and entire campus of Barrackpur Division and Barrackpur Sub-Division I II III at Gandhi Ghat Barrackpur during the year 25 26