Loading…
Loading…
126 results • Latest
Felt Packing for TM blower duct as per S.C.Rly Drg No.A4/EL/WAM4/1756, Alt-2
Terminal block assembly complete for Auxiliary motors (MCP/MVSL/MVSI) as per S.C. Rly drawing No. A3/CONV/2682.
Spring for E.M.Contactor as per CLW specification No.4TTS.291.001 ALT.8 or latest, and CLW drawing No.4TWD.291.038 Alt-1 confirming to CLW drawing No. ITWD.291.033 Alt 9 or latest.
Set of Sand pipe arrangement for 3Ph.locos consisting of 2 items
Guntakal Division -Guntakal: 1. Electrical Arrangements for Upgradation/Modification of Loco body washing Cum Rain water leakage testing plant as per RDSO Guidelines at Locomotive Shed, Guntakal and 2. Provision of Electrical Arrangements for the Upgradation of Infrastructure facilities for homing of electrical locomotives in existing link bay at Diesel Shed Guntakal.
Guntakal Division-Provision of Solar Pumps, Solar Street Lights and Solar Geysers across the Division
Guntakal Division: Provision of APFC Panels in AD, HX, NRE, RC and RU Sections for Improving the Power Quality.
Lamp 25W/120 V as per CLW Specification No. CLW/ES/L-2/I or latest and Confirming to S.C. Rly drawing No.A4/EL/WAM4/1475.
Guntakal Division : Sr.DEN/South Jurisdiction : RU-GY Section (UP/DN/SL):- ProposedMiscellaneous Track Related Works excluding safety Related Track Maintenance works Such As Transportation of P.Way Casual renewal Materials, Reconditioning of Inserts, Felling Tree cutting on Formation and Slopes, Pre and Post Tamping Works and other petty works in SSE/P.Way/HX,YA & JMDG section of ADEN/HX Sub-Division.