Loading…
Loading…
983 results • Latest
Zonal piece work contract - Execution of works for the Period from 01/07/2026 to 30/06/2027 in Zone - Dharmavaram (Excl) to Pakala (Excl) and Horsely Hills under ADEN/MPL Sub-Division
Zonal piece work contract- Execution of works for the Period from 01/07/2026 to 30/06/2027 in Zone- North Colony of Guntakal including (BG) yard, station building and service buildings under ADEN/SW/GTL Sub-Division
Zonal piece work contract - Execution of works for the Period from 01/07/2026 to 30/06/2027 in Zone - Gooty (Incl) to Kondapuram (Incl) and Gooty - Pendekallu (Incl) under SSE/Works/GY of ADEN/GY Sub-Division
Zonal piece work contract - Execution of works for the Period from 01/07/2026 to 30/06/2027 in Zone - South Colony of Guntakal, including New Station building and PFs.1 & 2&3, up to outer signal on Dharmavaram line Under SSE/Works/South of Sr.DEN/Co-ord/GTL"-
Set of Resistances for Relay QOP/QOA as per CLW Specification No. CLW/ES/R-38 ALT-C or latest alteration consisting of 4 types as follows. S.No. 1. RQOP 3200 Ohms 75 Watts, Qty/set 1 No. 2. RPQOA 150 Ohms 75 Watts, Qty/set 1 No. 3. RQOA 680 Ohms 75 Watts. Qty/set 1 No. 4. RHOBA 210 Ohms 75 Watts, Qty/set 1 No.
Repair/ Reconditioning of Auxiliary Motors of 3-Phase electric locomotives
TCT Drill Rod 7 by 8 inch 22 mm overall length 600x35 mm, TCT Drill Rod 7 by 8 inch 22 mm overall length 800x34 mm, TCT Drill Rod 7 by 8 inch 22 mm overall length 1200x34 mm, TCT Drill Rod 7 by 8 inch 22 mm overall length 2000x33 mm, TCT Drill Rod 7 by 8 inch 22 mm overall length 2400x34 mm, TCT Drill Rod 7 by 8 inch 22 mm overall length 3200x31 mm, TCT Drill Rod 7 by 8 inch 22 mm overall length 4000x30 mm, TCT Drill Rod 3600x34 mm, TCT Drill Rod 7 by 8 inch 22 mm overall length 1800x33 mm, TCT Drill Rod 7 by 8 inch 22 mm overall length 1500x32 mm, Extension Rod R32 X R32-3050mm Part No. 90000141, Coupling Adaptor part No. 90515731, Button bit 64mm, Button bit 45mm, Bushing, Jack hammer, Shank adoptor, PN pusher leg, Pusher leg holder, Pneumatic rubber air hose pipe
KYRACS PP 60 Litre Foot Operated Bio-Medical Waste Collection Bin Brand: KYRACS (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687778510734 dt.12/05/2026)
KYRACS PP 60 Litre Foot Operated Bio-Medical Waste Collection Bin Brand: KYRACS (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687740675131 dt.12/05/2026)
KYRACS PP 60 Litre Foot Operated Bio-Medical Waste Collection Bin Brand: KYRACS (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687762744388 dt.12/05/2026)
MAYSONA Metal Shelving Racks (Adjustable Type) confirming to IS 1883 Closed Type (with side and back sheets) Type Brand: MAYSONA (Detailed Description/Specification as per Product # 1 of GeM Contract
KYRACS PP 60 Litre Foot Operated Bio-Medical Waste Collection Bin Brand: KYRACS (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687781196718 dt.12/05/2026)
Reverse Osmosisbased Water Treatment Systemabove50 LPH Capacity (V2) (Q2)
Steel Cloth Lockers (V3) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years of Experience and Turnover No
Custom Bid for Services - Guntakal Divn Maintenance Repairs replacement in respect of petty works in station buildings service buildings and staff Quarters in SSE (Works) GY under ADEN GY Jurisdiction for a period of One Year Schedule A Hiring of Man.., Custom Bid for Services - Guntakal Divn Maintenance Repairs replacement in respect of petty works in station buildings service buildings and staff Quarters in SSE (Works) GY under ADEN GY Jurisdiction for a period of One Year Schedule B ESI EPF Similar Category Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Man-days based
Guntakal Division-Provision of Energy-Efficient Additional HVAC System through VRF Technology for the Operational Control Centre Building in Guntakal.
Guntakal Division:-Comprehensive Maintenance Contract for out-of-warranty smart meters of ElMeasure make for period of 3 years.
Guntakal Division-Augmentation of TRIP SHED-RENIGUNTA, by providing all specified facilities. Also the mandatory requirements like Office room, staffroom, storeroom, sandroom, pit line extension, pathway construction etc. - Electrical arrangements.
Guntakal Division: Dharmavaram: Provision of 2 no. of Lifts to 12m FOB (Lifts Portion).
GTL Div: - OHE Modifications in lieu of Raising of platforms to high level and provision of new 3m FOB at Guntakal (GTL), Bevinahalu (BNL), Shampurahalli (SPHL) & Linganenidoddi (LMD) stations in DHNE-GTL-BAY section
GTL Div: OHE modifications in lieu of Raising of platforms to high level and provision of new 3m FOB at Gooty (GY), Nakkanadoddi (NKDO), Timmanacherla (TIM), Chiksuguru (CK) & Thangundi (TGDE) stations in GY-WADI section
GTL Div: OHE Modifications in lieu of Raising of platforms to high level and provision of new 3m FOB at Imampuram (IMA), Gullapalyamu (GPU), Kurabalakota (KBA), Pulicherla (PCL) & Mangalampeta (MPT) Stations GTL-DMM-PAK Section
GTL Div: OHE Modifications in lieu of Raising of platforms to high level and provision of new 3m FOB at Rayalacheruvu (RLO), Juturu (JUR), Kalamalla (KMH), Obulavaripalli (OBVP), Nandalur (NRE), Pullampet (PMT) & Hastavaram (HAQ) Stations in GY-RU Section
Auxiliary contact assembly complete for E.P.Contactor, as per CLW Drawing No. 3 TWD 112 090, alt.8.or latest, Ref Nos. 1 to 9 of sheet No.3 of 18, and CLW Specification No. 4TES.111.028 Alt-1
Conical Rubber thrust pad for Axle boxes of AC Elec. Locos as per RDSO Specification No. R63-76 and RDSO Drawing No. SKDL-2308, Alt-1.or latest.
GTL div: Replacement of Rusted Cantilevers, Anti-creep, overaged insulators and composite insulators in GTL-WD section
OHE Modifications in lieu of provision of Crossovers for Common loop facilities to UP loop line at Jakkalacheruvu(JKO) station in Gooty(GY)-Renigunta(RU) Section
Design, Printing, Supply of banners of size (8 x 3 feet) for awareness of safety week at various service building over the Guntakal Division at different locations. Safety week date and description should be collected from SSE/E/M/GTL . Warranty period: up to 30 months from the date of supply.
IOH REPLACEMENT KIT FOR NEW 22CB LOCO Sc
Custom Bid for Services - 1 CLEANING ACTIVITIES AT STATION, Custom Bid for Services - 2 SWEEPING OF ROADS AND OPEN AREA AT COLONY, Custom Bid for Services - 3 DESILTING OF DRAINS AT STATION AND COLONY, Custom Bid for Services - 4 COLLECTION AND DISPOSAL OF GARBAGE AT STATION AND COLONY, Custom Bid for Services - 5 PEST CONTROL ACTIVITY (AT STATION AND COLONY) AND RODENT CONTROL ACTIVITY (AT STATION) Similar Category On-Board Housekeeping Service(OBHS) for Railways On-Board Housekeeping Service(OBHS) for Railways On-Board Housekeeping Service(OBHS) for Railways On-Board Housekeeping Service(OBHS) for Railways On-Board Housekeeping Service(OBHS) for Railways
Set of spares for 3/4" Duplex Check Valve (CLW drawing No.0/03//65/103 Alt-2) comprising of 7 items 1) Piston Valve Spring, Qty/set- 4 2) Rubber piston packing, Qty/set 8 3) Piston valve complete, Qty/set -1 4) check valve complete, Qty/set-1 5) Check valve spring bottom, Qty/set- 4 6) Valve rubber seat, Qty/set- 5 7) Check valve seat, Qty/set.- 5
Set of programmed switches of make M/s Siemens consisting of 9 items, as per CLW Specification No. CLW/ES/S-1/ZB for material and requirement as per attached document.
Roti Making Machine (Q3)
We are inviting competitive quotation for providing paramedical services at BPCL,Gooty Depot
BUFFER Class I Design A (Low Shoe) Safety Footwear of Size 6 Brand: BUFFER (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687729266286 dt.09/03/2026)
Monthly Basis Cab & Taxi Hiring Services - Hatchback; 1500 kms per month or cum 18000 kms per year; Outstation 24*7
GTL Div: Provision of Auxiliary Transformer (AT) supply for (i) Proposed Interlocking of mid-section manned LC Gates LC No .19(VKI-YLK) & LC No.21 (CCI-MGB) & LC No.125 (ZPL-PSPY), (ii) Proposed Interlocking of mid-section manned LC gates (4 Nos)[LC-31 (KHT-RCG), LC-34 (RCG-YPD), LC-42 (YPD-RU) & LC-76(TAT-KBA)] and (iii) Proposed interlocking of mid section manned LC gates (3 Nos)[LC-6 (VDD- NDZ), LC-39 (YPD-RU) & LC-31 (MGB-KCM)]
Provision of Retro-reflective Sigma Boards prior to ABS signals and number plates in WD-GTL-MOO-RU section
Set of spares for HRC Fuse unit 6 amps, to use on 25 KV AC Elec Locos
Supply of PTZ camera and accessories for various substations of SR-I, WR-II, NR-III & Odisha Project
GTL div: Replacement of Leaning/critical and less contact wire height OHE structures due to raising of track with new OHE structure in connection with safety in RU-GY-DMM section
GTL div: Upgradation of earthing station, battery sets and PSI equipment to view of reliability and safety over GTL division.
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Running Nipples, Close Taper Nipples and Barrel Nipples confirming to IS 1239 (Part 2) (Q4) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Custom Bid for Services - Schedule A Maintenace and up keeping of TTe rest room, Custom Bid for Services - Schedule B Washing, drying and ironing of Linen, Custom Bid for Services - Schedule C provision of Subsidized meals in TTE rest room, Custom Bid for Services - Schedule D Supply Of Consumables Sanitary, Cleaning Tools Etc, Custom Bid for Services - Scheduleb E Provision of LPG gas for cooking in kitchen, Custom Bid for Services - Scheduleb F Provision of Drinking water facilities through RO Plant Similar Category Facility Management Service - Outcome Based Facility Management Service - Outcome Based Facility Management Service - Outcome Based Facility Management Service - Outcome Based Facility Management Service - Outcome Based Facility Management Service - Outcome Based
GTL Division: SW(i)Proposed improvements to drainage arrangements at Br.No.42- A (LC 143) at km 244.240 in GTL-KLU section. SW(ii): Proposed improvements to drainage arrangements at Br.No.42-B (LC 142) at km.242.238 in GTL-KLU section.
Guntakal division: Proposed improvements to drainage arrangements at Br.No.41B(RUB) (LC 144) at km.245/421 in GTL-KLU section.
Repairs to the bridge and bridge protective works in the TPTY sub-division (RWP 2025-26)
GTL Division: Supplying and stacking of 50 mm gauge Machine crushed hard and durable stone ballast to Railway's specifications (1,20,000cum) and loading the same into Railway's Hoppers/Wagons at Kamalapuram ballast depot under Sr.DEN/South/GTL Jurisdiction for a period of 39months ( 36 months supply and 3 months for mobilization period).(Two Packet)