Loading…
Loading…
915 results • Latest
CONSTRUCTION OF SHED WARD NO.-03, KABRISTAAN
Biennial work contract for hiring of one no. Air-conditioned compact sedan car with minimum engine capacity 1150 CC (for petrol version) with 02 No of Air Bags and ABS for official duty of S.E.(HQ) at ATPS, MPPGCL, Chachai.
Truck Mounted Boom Lift Platform (Q2)
Brake Lining 4 Inch X 0.5 Inch
Double Armoured Suction And Delivery Hose 300m
PITCHING WORK WARD NO.-12, POND
CONSTRUCTION OF CULTURAL STAGE WARD NO.-14, NEAR ANKUSH HOUSE
LAYING OF PAVER BLOCK WARD NO.-06, NEAR MASJID
OCTAGONAL POLE FITTINGFROMBESIDE OF CENTRAL BANK OF INDIA TO SARASWATI SCHOOL TIRAHA VIA SBI BANK AT WARD NO10
EXTENSION OF 11KV LINE FROM RAM SINGH HOUSE TO BABBUPAVHOUSEAT WARD NO 13
EXTENSION OF LT LINE NEAR SAMUDAYIKBHAWAN AT KHALE TOLA BASTI WARD NO 01
LT LINE EXTENSION AT GALLAIYA TOLA ANDMOHADADAFAI AT WARD 6
EXTENSIONOF11KV LINE AT SAHU MOHALLAATWARD 15
INSTALLATION OF 100KVTRANSFORMER AT NEW COLONY AND 11KV LINE SHIFTING INFRONT OF TEHSIL AND NAGARPALIKA OFFICE AT WARD NO 12
IMPROVEMENT OF BHAWANIHA TALAB PHASE2 ATWARD 15
CONSTRUCTION OF RCC DRAIN FROM NH43 BALNUKUND HOUSE TO PRABHA DEVI HOUSE AT WARD NO. 05
CONSTRUCTION OF RCC DRAIN FROM CHNADRAPRAKASH HOUSE TO MUNIYA HOUSE AT WARD NO. 04
Watermist and Caf Fire Extinguisher High Pressure Backpack Type (V3) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
CONSTRUCTION OF RCC DRAIN FROM RATTU BAIGA HOUSE TO MUNNA JOGI HOUSE AT WARD NO. 04
Construction Of Cc Road From SHAYAM LAL TO BHAILAL HOUSE At Ward No. 06
Construction Of Cc Road From AASHA CLOTHS TO BAJNATH GOND HOUSE At Ward No. 10
CONSTRUCTION OF CC ROAD WITH PAVER BLOCK TOPPING FROM BHUSAN HOUSE TO GOPAL HOUSE AT WARD NO. 06
PBMC work on Jamuna Latar road Length 1.40 Km, Latar Pador Road Length 3.60 Km and Darsagar Bagdumra road Length 1.40 Km Total Length 6.40 Km
Strengthing of Pondaki Karangra road Total Length 6.00 Km Praposed Length 3.00 Km
Strengthing of Khamroudh to Tankitola Chatua road Length 1.40 Km
CONSTRUCTION OF CC ROAD WITH PAVER BLOCK TOPPING FROM SURAYBHAN HOUSE TO SURAYBALI HOUSE AT WARD NO. 06
Strengthing of Katni Gumla Chandil N.H.-43 to Mairtola road Length 2.00 Km
Strengthing of Patpariyatola Approch, Payari Approch road and Length 2.20 Km
CONSTRUCTION OF RCC DRAIN FROM CHAMPA MAIDAM HOUSE TO LAL BAHADUR SAHU AT WARD NO. 05
STMC work on Anuppur Jaithari Venkatnagar road MDR Length 40.60 Km, Lahsuna Pondi VR road Length 3.40 Km, Beed to Umariya road Length 2.00 Km Lapta Chorbhatti road Length 7.50 Km, Mediyaras aApproach road Length 7.50Km total Length 61.00Km
STMC work on Pasla Approach road Length 1.00 Km, Dhangawan Padariya road Length 1.80 Km, Thoda Approach road Length 1.00 Km,Godaru Nala to Dhumma Devgawan Road Length 2.40 Km,Jamuna Parasi main road to Chouhari Titaripondi Dhurwashin road Length 2.40
Zonal Contract for Maintanace of PWD all roads Under Sub Division Anuppur Division Anuppur (All SOR Item of Road and bridges SOR effected from 11.04.2025 and its Amendment)
Work contract for cleaning/removal, dumping and disposal of sarpats weeds, debris, leaves, vegetaion etc round the clock near raw water pump house of 210 MW ATPS Chachai
Construction of Helipad with approach rod and barricading transporting work for differentLaw and Order, Security arrangement in VVIP,VIP Programme, National Programme and other work. Under Sub Division Anuppur (All SOR Item of Road and bridges SOR
Re-carpeting of main road / colony road in Jamuna Township of Jamuna Kotma Area.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio/Mahindra Scorpio N/Mahindra XUV 700/Tata Harrier/Tata Safari or equivalent vehicle; The age of vehicle shall not be not more than 2 years from the scheduled date..
HT Tape (Q3), Plasticized PVC Tapes with Non- Thermosetting Adhesive for electrical purpose (V2) ISI marked to IS 7809 (Part 3/Sec1) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Filling of crack and pot holes in C-1, C-2 and 37LW/19D Panels existing depillaring at Surface of Bartarai Collery, Amadand UG Sub Area, JK Area.
Supply of fine chemicals and labware for NABL accredition at Chemical laboratory, ATPS, MPPGCL, Chachai.
PBMC work on Payari Tarang Approach road Length 3.00 Km, Antariya Karanpathaar road Length 3.10 Km
Procurement of CMR and Control cable for islanding scheme of 210 MW ATPS MPPGCL Chachai.
Drone as a Service - As per the uploaded detailed document with the bid (SOW)
Hardwood Swan Sleeper, Size 10cm X 10cm X 1.2mtr long as per Specification Document
Supply of spares of Vibration Monitoring System (VMS) for various 6.6 KV auxiliaries of 210 MW, ATPS, MPPGCL, Chachai.
04/2026-27
04/2026-27
STRNTHENING OF CC ROAD AT WARD NO 06 PIPAL CHAURAHA TO MADAN SONI HOUSE
CONSTRUCTION OF GUARD ROOM AND GATE AT WARD NO 07 PUMP HOUSE
Custom Bid for Services - Assistance in Operation of 12 Nos Belt Conveyor 11 Nos Pumps and 5 Nos Haulage in UG for 180 days at Khairaha UG Mine Sohagpur Area Similar Category Facility Management Services - LumpSum Based
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service