Loading…
Loading…
4,419 results • Latest
Construction of paved road from village Dhanaura Gauri towards the south to Ramnagar Shahabad Road. (Development Block - Majhgawan)
Construction of Bhagwan Shri Maharshi Kashyap Memorial Gate near Aril River in village Paiga. (Development Block - Majhgawan)
Operation and Maintenance Services of Power Generator(DG-Set) - Package 1 - O&M Service with operational and maintenance manpower; 1; Upto 500 hours
Construction of CC road from Gore s house to the primary school in village Urla. (Development Block - A.J.)
Tourism development work of Chitragupta temple located in village Makarandpur Sutiya of district Bareilly Mirganj
Gear Lubricant, Multipurpose (Extreme Pressure Gear Oil to IS: 1118-92/API - GL-4 with 4 ball rig test only) to Grade SAE - 90.
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; upto 3; PACKAGE-3 : Water purifier and conditioning system maintenance involving basic servicing p..
Refined Sunflower Oil
New construction work at Simra Bahor Nagla road to Kuwandanda Ahraula road (5.50 m width) in Distt. Bareilly in F.Y. 2025-26.(With 05 years maintenance)
Straw/Bhusa (Q3)
Facility Management Service- Manpower based (Version 2) - Commercial; Housekeeping; Skilled, Facility Management Service- Manpower based (Version 2) - Commercial; Housekeeping; Semi-skilled, Facility Management Service- Manpower based (Version 2) - Commercial; Housekeeping; Unskilled, Facility Management Service- Manpower based (Version 2) - Commercial; Housekeeping, TEACHER; Skilled
Special Repair Work of Shahi Dhaura to Jamuniakhata link road FY 2025-26
Renewal with General Repair of Barkhan Kyoladia Road to Babura Baburi Road FY 2026-27
Special Repair Work of Tanda Dhanua to Pakhurni link road FY 2025-26
Renewal with General Repair of Officers Hostel Compound with BC By Hot Mix plant in District Bareilly
Navabganj Pilibhit maar ke pass nikat cc office ke samne mahila aur purush shauchalay mantralay bus stop ka karya
Annual Repair work (2025-26) of DM Compound, ADM Compound Residential Building in District Bareilly
Paver tiles work in front of St. Maria School and other places under Cantt area in Bareilly district.
Work of installing view cutter on the overhead bridge at the intersection near Satellite Bus Stand on Bareilly Shahjanpur Road in Bareilly district. FY 2025-26
Work of installing view cutter on three lane overhead two lane bridge at Chopula intersection of Delhi Lucknow road in Bareilly district.
MPR Antenna working model, Antenna Carrier working model, Missile Launching Pad working model
Clobetasol Prop. 0.05 percent plus Miconazole 2 percent Oint
Tricholine Citrate Sorbitol Solution 200ml
Dry powder inhaler having facility to break the rotacap by piercing specn: Device dry powder inhaler -2
Each Tab/ cap Contains- Vinpocetine 5mg Packed in PVC / Silver Foil Strip specn: Tab. Vinpocetine 5mg
Perindopril 4mg plus Amlodipine 5mg Tab
Estradiol Cream 1mg per 1g Cream
Each 5 ml Syp. contains - Roxithromycin 50mg Packed in upto 60 ml bottle
Inj. contains- Nicotinamide 200mg / ml + Folic acid 15mg / ml + Cyanocobalamin-500mg/ml Packing upto 10ml amp/vial
Each 5 ml Syp contains. Ofloxacin 100 mg Packing up to 60 ml
Clindamycin 100mg plus Clotrimazole 200mg Vaginal Tab.
Flucanazole 150mg 1Tab plus Azitromycin 1g 1Tab and Secnidazole 1g 2Tab
Each cartriadge contains- Human Isophane Insulin (NPH) 100 IU / ml Packed as 3 ml Cartridge Note-one pen and ten needle supply with every 50 cartridge
Ear drop contains lignocaine 2%, Para-dichlorobenzene, chlorbutol , turpentine packing upto 10 ml phial specn: packing upto 10 ml phial
Ear drop contains lignocaine 2%, Para-dichlorobenzene, chlorbutol , turpentine packing upto 10 ml phial specn: packing upto 10 ml phial
Each Tab/Cap contains- Telmisartan 40 mg with Amlodipine 5mg and Chlorothalidone 6.25 mg Packed in PVC / Silver Foil Strip. specn: Tab.Telmisartan 40 mg with Amlodipine 5mg and Chlorothalidone 6.25 mg
Each ml contains - Testosterone 250 mg in Aquous Solution. Packing upto 4 ml Amp
ST020200749, ST020200779, ST020200780, ST020200763, ST020200753, ST020200783, ST020200785, ST020200770, ST020200764, ST020200778, ST020200773, ST020200754, ST020200782, ST020200784, ST020200748, ST020200781, ST020200767, ST020200788, ST020200786, ST020200771, ST020200750, ST020200762, ST020200759, ST020200765, ST020200760, ST020200774, ST020200787, ST020200776, ST020200777, ST020200757, ST020200775, ST020200761, ST020200769, ST020200751, ST020200755, ST020200758, ST020200756, ST020200768, ST020200772, ST020200752, ST020200766, ST020322465, ST020322460, ST020322462, ST020322466, ST020322458, ST020322467, ST020322469, ST020322464, ST020322455, ST020322463, ST020322461, ST020322459, ST020322468, ST020322457, ST020322456 PISTON SLEEVE 1 FOR FOLLOW UP PISTON FOR HYD AMP. ASSY-01142324000 PART-11., FOLLOW UP PISTON FOR FOLLOW UP PISTON FOR HYD AMP. ASSY-01142324000 PART-12, CONTROL SLEEVE FOR FOLLOW UP PISTON FOR HYD AMP. ASSY-01142324000 PART-13, PISTON SLEEVE 2 FOR FOLLOW UP PISTON FOR HYD AMP. ASSY-01142324000 PART-56, COMPRESSION SPRING FOR FOLLOW UP PISTON FOR HYD AMP. ASSY01142324000 PART-63, PISTON SPRING ASSY 1 FOR FOLLOW UP PISTON FOR HYD AMP. ASSY01142324000 PART-109, PISTON SPRING ASSY 2 FOR FOLLOW UP PISTON FOR HYD AMP. ASSY01142324000 PART-110, PISTON SLEEVE 1 FOR FOLLOW UP PISTON FOR EHC. ASSY 01142724000 PART-18, PISTON SLEEVE 2 FOR FOLLOW UP PISTON FOR EHC. ASSY 01142724000 PART-19, Bid Number : GEM/2025/B/6933537 Dated : 26-11-2025 Bid Document 1/45
Split Air Conditioner, Floor Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
CT Film for Dry View (''17X14'') Pack of 125 Films), CT Film for Dry View (''10X12'') Pack of 125 Films), Laser Films for Dry View Laser (''10X08'') Pack of 125 Films Trimax), Laser Films for Dry View Laser (''10X12'') Pack of 125 Films Trimax)
DT apparatus with facility for Bolus
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Outsourcing Of Maintenance Of BTS Sites In Bareilly BA; Buyer