Loading…
Loading…
1,615 results • Latest
Post Paid Data and Voice Service
Supplies of Essential Commodities for Flood area In District Basti (Rahat Kit)
3M Non Rigid - Straight Joint - Heat Shrink Cable Joint Kit For 4 Core Cable Brand: 3M (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687728962651 dt.22/06/2026)
As per Tender Document
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Local 24*7
Janpad Santkabir Nagar Police Line mein Transit Hostal G 8 ke 02 Tower nirman karya
2 Increasing Capacity of 33 11 Ss Politechnic Basti From 1x5 MVA to 2x5 MVA and Increasing Capacity of 33 11 KV Ss Vikramjot Basti From 2x5 MVA to 5 plus 10 MVA
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2)
Vikas Khand Kudraha Parisar mein Library ka nirman karya
Construction of a Record Room within the office building of the Basti Municipal Council.
Construction of 02 toilets near the gate in Ward No. 07, Surtihatta, Nirmali Kund.
Construction of 02 toilets and 02 urinals near the South Gate Police Outpost in Ward No. 03, Murlijot.
AC 1.5 TON PIPE 5 MTR WITH STABLIZER INSTALLATION AND SUPPLY WORK
Paitch Repair work of SH/MDR/ODR in Juridiction of JE-IV
Construction of Community Hall work at Gram Parsa Khal me Block Saltauwa Gopalpur Distt Basti
Construction of Community Hall work at Gram Banrahi Jangal me Block Saltauwa Gopalpur Distt Basti
Widening and strengthening work of Sugarmill Ghatramha to Raurapar road via Vandevi Mandir (Other District Road) (Length 5.100 Km) in Sant Kabir Nagar district.
CONSTRUCTION OF SAMAY MATA STHAN MADHWA NAGAR BAIRIHAWA LINK ROAD
Capacity enhancement work of transformers under Business Plan 2026-27 in the working area of EDD RUDHAULI Basti
Capacity enhancement work of transformers under Business Plan 2026-27 in the working area of EDD Sadar and Grameen Basti
Construction work of 11 KV line under Business Plan 2026-27 in the working area of EDD Sadar Basti
Work of installing additional transformers under Business Plan 2026-27 in the working area of EDD Sadar Rudhauli and GRAMEEN Basti.
Carriage and replacement of TF under EDD-GRAMEEN Basti
Quick repair work of fault/damage caused due to excessive heat at all 33/11 KV substations under EDD SADAR Basti
Lot-08
CONSTRUCTION OF HARRIYA SIRPATPUR ROAD KM-5 MALKAINIYA TO CHAUDHARY PURWA ROAD
NEW CONSTRUCTION WORK FROM MATHIYA ATRAULIA TO BHAINSAHIYA REMAINING PART ROAD
12 Watt White-LED Based Solar Street Lighting System As
Replacement of HT LT Line and Poles under EDD GRAMEEN Basti
Various work under Deposit Head 2025 26 under EDD RUDHAULI Basti
RENEWAL OF BASTI TANDA ROAD TO KANAILA ROAD
RENEWAL OF KUDRAHA LALGANJ TO JIBHIYAYE ANUSHUCHIT BASTI TAK ROAD
Lot-2
GPS Survey, Consultancy Services and Preparation and Submission of detailed drawings for augmentation and bay modification works at 220 KV Substation - Basti under Electricity Transmission Division-I, Basti.
SR OF SONAHTI SEMUADEEH (SARYU NAHAR DAK BANGLA ) CHAPPANDIHWA KANCHANPUR CHAURAHE TO BANGAWA LINK ROAD
Renewal of Pakari Udaipur Link Road
NEW CONSTRUCTION WORK FROM RAJEDIHA BAURVYAS ROAD KM 4 TO NAHAR PATARE VIA GOVERNMENT WOMEN DEGREE COLLEGE PATNA KHAS ROAD
Janpad Siddharthnagar me hasudi aausan pwd road se sulehwa ke beech missing link marg per sthit parasi nale per 5x4x4 mtr span ke box culvert ka nirman karya
PulleyGear-L_SB4270001_SEW_EP2, CrossRoller_SB6488001_SEW-EP2, InsideCover_R- Assy_SB5072001_SEW_EP2, InsideCover_L- Assy_SB5073001_SEW_EP2, BearingHolderSpacer_SB4364101_SEW_EP2, ThreadBreakageDetector_SB6587001_SEW_EP2, ThreadRetainer_SB2636001_SEW_EP2, ThreadTrimmerSolenoid_SB6577001_SEW_EP2, MovableKnife-H-Assy_SB7053001_SEW_EP2, FixedKnife_FL_SB7055001_SEW_EP2, NeedleHolePlate, M- KnifeSpacer_T0.25_SB3049001_SEW_EP2, M- KnifeSpacer_T0.35_SB0955001_SEW_EP2, PlungerRubber_SA9853101_SEW_EP2, X-FeedBracket-S- Assy_SB4344101_SEW_EP2, WorkClampAssy_311H_AIR_SB4454001_SEW_EP2, WorkClampLifterLever_R_AIR_SB4371001_EP2, WorkClampLifterLever_L_AIR_SB4370001_EP2, Driver_SA6448301_SEW_EPP_P.67, SA2173301 Shuttle Hook Assy, Work Clamp Pressure Foot, S42843001, BallBearingBush_SA3206001_SEW_EPP, Joint- G_SA4608101_SEW_EPP, BELLOW PRESSURE F_SB4361001_SEW_EP2, WorkClampLifterLever_AIR_SB4369001_EP2, WorkClampSliderAssy-L_SA4714001_NSEW_EPP, WorkClampLifterLever_4738001_SEW_EP2, D- TensionAssy_SB6468002_SEW_EP2, ThreadTakeUpSpring_6193001_SEW_EP2, S25279101 Set Screw CP, MovableKnifeCollar_S00705001_NSEW_EPP, MovKnifeShoulderScrew_SA4518001_NSEW_EPP, ThrustWasher_SA4519001_NSEW_EPP, Arm Thread Guide B, SA4333001, ArmThreadGuide-C_SA6391001_SEW_EPP, Arm Thread Guide D, SB1086001, disc-Tension-145446001, ThreadGuideArm_SA8691001_SEW_EPP, N- Bid Number : GEM/2026/B/7112502 Dated : 23-01-2026 Bid Document 1/54 Item Category BarBushThreadGuide, D, SA3258001_SEW_EPP, AdjustingStud_SA3238401_SEW_EPP, ScrewPan_M4X8_062400816_SEW_EPP, SPRING- COMPRESSION_SA3313101_SEW_EPP, SPRING, EXTENSION_SA3321001_SEW_EPP, EPP_SCREW, _SM3.57-_40X6_L_145465001_SEW, EPP_SLIDE_BLOCK_GUIDE_SA3528001_SEW, EPP_SETSCREWSOCKETFT_M6X6_12060636_SEW, EPP_BALL_BEARING_6904DDUNR_SA4179001_SEW, EPP_BALL_BEARING_6904DDU_SA4180001_SEW, EPP_BALL_BEARING_6204DDUNR_SA4178001_SEW, EPP_BoltSocket SPwsr M5X12_S55485001_SEW, EPP_WorkClamp_Guide_A_ASSY_SA4863001_SEW, EPP_NUTFT, _M_6_SA3227001_SEW, EPP_SCREW_M3X4_SA4199001_SEW, EPP_LOWER_SHAFT_ASSY_SA4783101_SEW, EPP_COLLAR_TR_-TRIMMER_SA3310001_SEW, EPP_SET_SCREW, _M4X5_S46903001_SEW, EPP_CUSHION_154596000_SEW, EPP_TENSION_RELEASE_ASSY_SB4467001_SEW, EPP_SCREW_PAN_M5X8_62500816_SEW, EPP_WorkClamp_Guide_B_Assy_SA4864001_SEW, EPP_WorkClamp_RetainerAssy_SA4706101_SEW, EPP_CollarPresserBarSpring_SA5301001_SEW, TIMING PULLEY_SB4406001_SEW_EPP, EPP_BearingHousingAssy_SA6451101_SEW, EPP_PRESSURE BAR CLAMP_SA4778001_SEW, Shoulder Screw, 6-1.8 SA4354001, SET screw collar UNO S25454021, SPRING_SA2287001_SEW_EPP, SA5219001 Thread Wiper Rod, Washer UNO 110735022, S03677001 Washer, EPP_Brother Grease Unit_SEW, Y- FeedBase_SB4185301_SEW_EPP, Tension_Nut_S31032002_SEW_EPP, SA3254001 Tension Bracket, SA3255001 Tension stud, Set screw, SM3.57 100402004, Washer_S20681000_SEW_EPP
In Ward No. 13 Abdul Kalam Nagar, construction of CC road from State Bank Pitch Road (NH27 Pitch Road from the city) to Suresh Jaiswal house.
Construction of CC road from in front of Shiv temple to Shiv Pujan house in ward number 12 Mangal Pandey Nagar (Patkhauli Babu).
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Supply of Stone Grit 10.00mm, 20.0mm and Coarse Sand on Bridge Over River Manorama at Tighra Ghat in District Basti
RENEWAL OF SRI RAM JANKI KM-21 TO CHAUPEDWA HOTE HUE EKDENGWA VIDYALAYA TAK ROAD
RENEWAL OF KAITHOLIYA GHAT ATRIKT PAHUCH ROAD
Drinking Water Coolers (V4) ISI Marked To IS 1475 (Q2) (3 (3 ))
Facility Management Services - LumpSum Based - Supply of materials for pipeline repair; Supply of materials for pipeline repair; Consumables to be provided by service provider (inclusive in contract cost)
Multilayered Cross Laminated Sheets/Tarpaulins/Covers/Agricultural Filmsconformingto14611 (Q3)