Loading…
Loading…
563 results • Latest
Handling, Transport and Other Mining Services - Percentage quote based - Cleaning of tail ends, loading points of belts conveyor in UG of Jhilimili Mine
Reverse Osmosisbased Water Treatment Systemabove50 LPH Capacity (V2) (Q2)
Mid Back Chair with fixed armrest, Wooden Modular with Glass tabletop, Single seater sofa
Construction of Vicharpur to Dhobghatti Approach Road Length 2.00 Km. & D-1 Nahar to Dhobghatti Via Lalpurkala Road Length 3.30 Km. Total Length 5.30 Km. .
Construction of Koni Forest Rest House Via Patrakar Colony Ashoknagar Aashaband Link Road Length 3.70 km.
Provision of Auto Signalling with Electronic Interlocking (OFC Based) between Tenganmada(TGQ)-Khongsara(KGS)-Bhanwartonk(BHTK)-Khodri(KOI)- Sarbahara(SBRA)-Pendra Road(PND) section with alteration in existing Panel interlocking, Electronic Interlocking & Supply, Installation, Testing, Commissioning of new Electronic Interlocking, MSDAC & IPS etc., execution of all indoor & outdoor works & construction and Electrification of the huts etc. in Tenganmada-Pendra Road section of Bilaspur Division of S.E.C. Railway.
Construction of CH Building 50 bedded Hospital at Sh Naina Devi ji
"Repairing of 06 nos. Orione make Huck Bolting machine at WRS/R" through Open Tender.