Loading…
Loading…
1,188 results • Latest
Strengthening of existing earthen embankment by way of laying of Gabion toe wall on left side of Sukhnag Nallah at RD 27000m to RD 29000m Length 178m
Construction of Flood Protection works on Rantsi Nallah from RD 2600m.
Development of Green Space on right embankment of Flood Spill Channel at Solina.
Flood Protection and River Training works by way of construction of crate Gabion Protection wall on Gogaldara Nallah from RD 12500m to RD 17600m.
Construction of Damaged R Wall on Nowhar Tubewell road
Macadamisation of Inner links of Gohlar (Machine Mix laid with paver)
Macadamization of Inner Links of Sitharan (Machine Mix laid with Paver).
Upgradation of Browsing Centre with IT Infrastructure
Custom Bid for Services - REPAIRING CHANGING OF DOORS AND WINDOWS OF TOWNSHIP OFFICERS COLONY AND INSIDE PLANT PREMISES Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)