Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
788 results • Latest
Annual Maintenance of Holalkere(SH-47) to Hanumali Connecting Road via Avalihatti, Malenahalli, Nulenuru, Rangapura from Km 0.00 to 1.45, Km 5.00 to 6.09, Km 6.41 to 8.40, Km 8.50 to 8.60, km 9.03 to 9.29, Km 11.41 to 12.00 and km 13.00 to 15.11in Holalkere Taluk
Annual Maintenance of Halehalli (NH-369) Chikkajajuru Connecting Road Via Cheeranahalli, Kambadevarahatti, Arenahalli, Dasarahalli, Mekenahatti, Apparasanahalli, Channapattana from Km 0.00 to 2.60, km 7.02 to 10.87, Km 11.92 to 16.78, Km 0.00 to 1.25 and Km 0.00 to 1.82 in Holalkere Taluk
Maintenance of Kasturi Thimmanahalli Cross to Bomberahalli Road via Kasturi ThimmanaHalli, Devara Marikunte from Km 0.00 to 12.55 in Challakere taluk and Maintenance of Nagaramgere to Devara Marikunte via D. Upparahatty, Dasanaikana Hatti, Reddihalli from Km 1.803 to 5.10, Km 5.25 to 8.47, Km 8.57 to 8.812 and Km 11.286 to 15.97 in Challakere taluk.
Annual Maitenance of SH-243 Connecting Challakere (NH-150A) to Vishwanathanahalli(SH-48) from Km 196.80 to 201.6, Km 201.90 to 202.577, Km 203.05 to 207.65, Km 207.90 to 210.66, Km 210.90 to 212.63, Km 212.87 to 229.15 and Km 233.65 to 245.65 in Holalkere Taluk
Annual Maintenance of Vishwanathanahalli (on NH-173) to Arehalli Connecting Road (on NH-369) Via Idehalli, Malenahalli Kaval, Arehalli Kaval from Km 0.00 to 12.56 in Holalkere Taluk.
A) Annual Maintenance of Selected Reaches of Road from Heggere (on SH47) connecting Srirampura (on SH47) via Gavirangapura from ch 0.00 km to 6.93 km, in Hosadurga taluk .B) Annual Maintenance of Selected Reaches of Road from Naigere Cross (on SH47) connecting Kurubarahalli via Naigere, Nagaragere, Mylarapura from ch 0.00 to 5.37 km, in Hosadurga taluk
Providing Piped Water Supply Scheme in Neralagunte Kurubarahatti Habitation of Neralagunte Grama panchayath of Challakere Taluk, Chitradurga District (Category ST Reservation)
Providing Piped Water Supply Scheme in Nelagethanahatti Habitation of Nelagethanahatti Grama panchayath of Challakere Taluk, Chitradurga District (Category ST Reservation)
Providing piped water supply scheme to Kereyagalahalli village in Holalkere taluk Chitradurga dist (SC Reservation)
Providing Piped Water Supply Scheme in Kaledahatti Habitation of N. Devarahalli Grama panchayath of Challakere Taluk, Chitradurga District (Category SC Reservation)
Providing piped water supply scheme H.D.Pura village in Holalakere Taluk (S.T. Reservation)
Providing piped water supply scheme to Kudineerina katte Lambani hatti village in Holalkere taluk Chitradurga dist (CAT-I Reservation)
Providing Piped Water Supply Scheme in Kittadal Habitation of Kanchipura Grama Panchayath of Hosadurga Taluk, Chitradurga District (Additional Pipeline, Bescom work And Rising main to Newly drilled borewell) (Category 2A Reservation)
Providing Installing and Commissiong of WPP MODEL FOR 500 LPH (FRP) at Dhasharameswra vajra(Near G N kere) Village of G N kere Grama Panchayat in Hosadurga Taulk of Chitradurga Dist
FILLING UP WATER BODIES (16 TANKS) OF JAVANAGONDANAHALLI HOBLI AND GAYATHRI RESERVOIR FOR DRINKING WATER PURPOSE AND GROUND WATER DEVELOPMENT IN HIRIYUR TALUK OF CHITRADURGA DISTRICT including Detailed Investigation & Conducting Survey, Design and Construction of Civil Works such as Intake arrangement, Jack well cum Pump house, Watchman room, approach road, chain link fencing & gate for Pump house yard and Design, supply and installation of Electro Mechanical components such as required capacity of Pumps and Motors, installation of 66 KV Switch Yard, 66/6.6 KV Terminal Bay, 66KV Transmission line and Design, supply and laying of MS/HDPE Rising main Pipeline and Pressure Distribution Network canal crossing, road crossing, railway crossing / high way crossing by pipe jacking/horizontal drilling method, road restoration, utility shifting, Surge analysis, Tanks improvement works & Facilitating for land acquisition, Crop compensation, obtaining permissions from concerned Departments and other statutory clearance from the competent authorities for the successful running of Tank filling scheme for Filling of Water to the designated Tanks, & other allied components including operation & maintenance for a period of Five years after successfully commissioning of the scheme on Turnkey basis.
Package 01 1) Repair of remaining potholes in various areas of 31 wards at CHallakere city 2)Asphalt road repair work near Karikal Kere Kodi on Nayakanahatti main road of Challakere city(Continue work).
IMPROVEMENTS TO DHARMAPURA TANK SUGURU TANK MUNGASAVALLI TANK SHRAVANAGERE TANK ABBINAHOLE TANK AND MUNGASAVALLI CHIKKAKERE TANK IN HIRIYUR CHITRADURGA DISTRICT.
Construction of 3KLD Capacity Faecal Sludge Treatment Plant at Rampura Village Rampura GP in Molakalmur Taluk Chitradurga Dist.
Providing and installation drinking water supply pipeline from neharu nagara 2nd cross bhagyamma house to holalkere main road Ward No. 13, where Scheduled Castes mostly live, in Chitradurga.
Load testing and visual inspection of Load bearing Tools and
E Tender for Construction of Staff Quarters at JNV Chitradurga, Karnataka
Molakalmuru bus stand Genaral stall No-03(GM), 95.73 sq.ft
Molakalmuru bus stand Genaral stall No-02(SC), 143.75 sq.ft
Molakalmuru bus stand Genaral stall No-01(PH), 149.73 sq.ft
Scientific cleaning of OHT, GLSR and sump pits for drinking water supply at Challakere CMC limits.
PROVIDING COOKING AND CATERING SERVICES THROUGH OUTSOURCING FOR THE DISTRICT INSTITUTE OF EDUCATION AND TRAINING (DIET) OF CHITRADURGA FOR RESIDENTIAL AND NON-RESIDENTIAL TRAININGS WORK SHOPS AND OTHER PROGRAMS WITHIN THE DISTRICT FOR THE YEAR 2026-27.
IMPROVEMENTS TO KODIRANGAVVANAHALLI GOKATTE TO IMPROVE GROUND WATER IN KODIRANGAVVANAHALLI VILLAGE OF CHITRADURGA TALUK AND DIST
IMPROVEMENTS OF GOKATTE FOR GROUNDWATER RECHARGE IN KOTEHAL VILLAGE IN HOLALKERE TALUK CHITRADURGA DIST
IMPROVEMENTS OF KENCHAPURA GOKATTE TO IMPROVE GROUND WATER IN KENCHAPURA VILLAGE OF HOLALKERE TALUK CHITRADURGA DISTRICT
IMPROVEMENTS OF GOKATTE FOR GROUND WATER IMPROVEMENTS IN KONDAPURA VILLAGE, HOLALKERE TALUK, CHITRADURGA DISTRICT
IMPROVEMENTS OF KODAGAVALLI GOKATTE FOR GROUND WATER IMPROVEMENTS IN HOLALKERE TALUK, CHITRADURGA DISTRICT
Supply of 245 kV RIP RIS Bushing for POWERGRID
CONSTRUCTION OF BRIDGE CUM BARRAGE ACROSS VEDAVATHI RIVER BETWEEN TOREBEERANAHALLI AND BELAGERE VILLAGES OF CHALLAKERE TALUK (CHALLAKERE CONSTITUENCY) CHITRADURGA DISTRICT
CONSTRUCTION OF BRIDGE CUM BARRAGE ACROSS VEDAVATHI RIVER BETWEEN GUDIHALLI AND THAPPAGONDANAHALLI VILLAGES OF CHALLAKERE TALUK (MOLKALMURU CONSTITUENCY) CHITRADURGA DISTRICT
Sinking of Bore wells near water treatment plant at Molakalmuru Town
CONSTRUCTION OF CHECKDAM NEAR TALYA VILLAGE IN HOLALKERE TALUK CHITRADURGA DIST
CONSTRUCTION OF CHECKDAM TO IMPROVE GROUND WATER IN SY NO 15/1 OF HARALAKATTE VILLAGE OF CHITRADURGA TALUK
HIRING CAR VEHICLE ON RENTAL BASIS FOR AEE FOR KRIDL OFFICE CHITRADURGA 2026-27.
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Safety Footwear (V3) ISImarkedto IS15298 (Part2) (Q2)
Annual Maintenance of State Highway-220 Connecting Shivaganga (on NH369) to Ammanahatti (on NH150A) via Madderu, Talya, Kumminagatta, Janakal,Hosadurga (on NH173), Hagalkere (on SH47),Mathodu, Vaddarahatti, Kittadahal, Chikkabyaladakere from Km 0.00 to 0.40, Km1.00 to 1.90, Km 2.40 to 2.65, Km 3.80 to 4.80, Km 6.47 to 6.915, Km 7.555 to 9.56, Km 10.30 to 10.80, Km 12.37 to 15.27 and Km 15.42 to 15.49 in Holalkere Taluk
Annual Maintenance of Aimangala (NH-48) to HDPura Cross Connecting Road via G.Hatti, Tekalavatti, Kereyagalahalli, Upparigenahalli from Km 12.67 to 22.53, Km 24.70 to 26.59 in Holalkere Taluk
A) Maintenance of Nayakanahatti to Thorekolammanahall Road via Guntha Kolammanahalli Km 0.00 to 10.50 in Challakere Taluk. B) Maintenance of Nayakanahatty to Kavalnahalli via Madaihnahatty, Jaganurahatti from Km 0.00 to 6.80 in Challakere Taluk.
Maintenance of Mannekote Cross to Gowrasamudra via Mannekote, Banjigere, Ghatparthi, Bhoganahalli, Devarahalli, Mallasamudra road from Km 0.00 to 2.40, Km 2.52 to 10.74, Km 11.13 to 16.40, Km 18.10 to 23.62, Km 24.18 to 24.40, Km 25.30 to 25.65 and Km 25.75 to 27.22 in Challakere taluk
Annual Maitenance of SH-245 Connecting N G Halli (NH-173) to Pandomatti(SH-76) Via Gollarahalli, Gangasamudra, Ramagiri,Talikatte, Pennasamudra, Goppenahalli from Km 0.00 to 6.12, Km 6.90to 12.59 and Km 13.37 to 19.47 in Holalkere Taluk
Annual Maintenance of Selected Reaches of Road from Kalkere connecting Mallenahalli Cross via Ballalasamudra, Alaghatta, Mallenahalli from ch 0.00 to 15.47 km And Link Road from Alaghatta connecting Vaddarahatti Ch ch 0.00 to 2.55 Km (Kadur Taluk Border) in Hosadurga taluk
Maintenance of Dodderi - Obenahalli Road via Reddihalli, Gopanahalli, Chikkenahalli, Yalagatta, Konigarahalli, Gosikere Kaval, Gosikere, Chikkachelluru from km 1.20 to 1.60, Km 1.90 to 2.60, Km 3.28 to 16.865, Km 16.95 to 16.975 and Km 17.045 to 36.13 in Chalakere taluk
A) Maintenance of Hirehalli to Gundluru Road via Rudramanahalli, Obannahalli, Kondlahalli, Netranahalli (SH 218) from Km 0.00 to 8.57 in Challakere taluk, B)Maintenance of Banavinakallu to Kallahalli Road (SH-226) from Km 40.43 to 41.20 in Challakere Taluk. c)Maintenance of Malpe with Molakalmur via Udupi, Hebri, Agumbe, Begar, Koppa, Narasimharajapura, Sulageri, Bhadravathi, Chennagiri, Shanthisagar, Davanagere, Jagalur, Mustur and B.G.Kere (SH-65) from Km 265.83 to 279.77 in Challakere taluk
Maintenance of Sanikere to Shiddlaiahnakote Road via Kaparahalli, Jadekunte, Hulikunte, Belagere, Narayanapura, Gorlathu, Kalamarahalli from km 0.00 to 3.60, Km 3.98 to 4.60 and Km 4.90 to 29.04 in Challakere taluk