Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
788 results • Latest
Annual Maintenance of State Highway - 24 Tarikere to Dharamapura road via Hosadurga, V.V.Pura, Hiriyur road from Km 79.94 to 81.44, 83.47 to 98.53 and 100.88 to 137.85 in Hiriyur Taluk
Annual Maintenance of A) Lakshmipura to Kasturirangappanahalli road via Boranakunte, Gorladaku road from Km 0.00 to 11.80 Km in Hiriyur taluk, B) Kasturirangappanahalli to Pitlali road from 0.00 to 0.30, 4.00 to to 5.40 and 6.70 to 7.96 Km in Hiriyur taluk
Annual Maintenance of A) Myaklurahalli to Challakere road via Myaklurahalli, Gannayanakanahalli, Kariobanahalli, Mallappanahalli, Salabommanahalli, Vaddikere, M.D.Kote road from km 0.00 to 4.25, 7.17 to 7.95, 8.15 to 13.75, 14.00 to 16.00, 16.40 to 16.80, 17.20 to 17.87, 18.35 to 19.40, 19.90 to 21.60, 23.22 to 23.60 and 24.47 to 25.67 km in Hiriyur taluk, B) Doddasiddavvanahalli to Sanikere road via Doddasiddavvanahalli, J.N.Kote, Kalliroppa, Sondekere road from Km 16.36 to 17.21 km in Hiriyur taluk
Annual Maintenance of Selected Reaches of Highway connecting Tarikere with Dharmapura via Hosadurga, V.V Pura and Hiriyur from ch 49.69 km to 50.80 km, ch 51.54 km to 69.69 km, ch 74.69 to 79.94 km in Hosadurga taluk ( S H -24)
Annual Maintenance of Selected Reaches of State Highway-220 Connecting Shivaganga (on NH369) to Ammanahatti (on SH150A) via Madderu, Talya, Kumminagatta, Janakal,Hosadurga (on SH-24), Hagalkere (on SH47), Mathodu, Vaddarahatti, Kittadahal, Chikkabyaladakere from ch 15.49 km to 23.80 km, 28.20 km to 32.56 km, 43.56 km to 59.30 km and 60.94 km to 62.27 km, and ch 66.63 to 72.60 km in Hosadurga taluk
Annual Maintenance of Selected Reaches of Road from Goravigondanahalli (on SH47) connecting Rangavanahalli Bhovihatti (on SH24) via Attighatta, Jogammanahalli, Kappagere, Hunasekatte, Koracharahatti from ch 0.00 to 0.60 km, 5.60 to 10.60 and ch 12.40 to 16.10, ch 16.56 to 19.60 km in Hosadurga taluk
Annual Maintenance of Selected Reaches of Road from Ahmadnagara (on NH173) to BV Nagara Cross (on SH220) via Sanehalli, Shettihalli, Baguru, Iyalapura, Mantenahalli, Lakkenahalli, Madhure, Bramhavidya Nagara from ch 0.00 km to 10.80, ch 11.480 to 25.11 km in Hosadurga taluk
Annual Maintenance of Selected Reaches of Road from Kellodu (on SH47) connecting Koratikere via Mettilahole, Kyadigere, Kadadinakere from ch 0.00 to 14.94 km And Link Road to Machenahalli 0.00 to 0.15 km in Hosadurga taluk
A)Annual Maintenance of Selected Reaches of Road from Guttikatte cross (on NH173) to Road connecting Hosadurga Railway station from ch 4.35 km to 11.12 in Hosadurga taluk . B) Annual Maintenance of Selected Reaches of Road from Bagur connecting Hosadurga Railway station from ch 0.00 km to 16.31 km, in Hosadurga taluk
Annual Maintenance of Selected Reaches of Mandya Hadagali Highway via Melukote, Shravanabelagula, Tiptur, Huliyar, Hosadurga, Holalkere, Anagodu and Harapanahalli from ch 176.45 km to 177.80 km, 179.20 km to 179.90 km, 181.05 km to 191.45 km and 194.75 km to 195.94 km in Hosadurga taluk (SH-47)
Annual Maintenance of Selected Reaches of Highway connecting NH-206 Kadur- Maravanje-Belgur from ch 35.85 km to 52.31 km in Hosadurga taluk (SH-152)
Annual Maintenance of Selected Reaches of Road from Bokikere Gate (on NH173) connecting Bagasettihalli (Ajjampura Taluk Border) via Bokikere, MG Dibba, Adavi Sangenahalli, Kangavalli from ch 0.00 km to 13.04 in Hosadurga taluk
Annual maintenance of SH-218 Hirehally to Gundluru via Rudrammanahally, Obanahally, Kondlahally, Netranahally Road From Ch km 8.57 to 19.02 in Molakalmuru taluk
Annual maintenance of Hampi Kamalapura to Hagari Bommanahalli Road (SH-131) From km 72.56 to 73.47, 74.27 to 76.06, 84.09 to 85.50, 85.76 to 87.14, 87.45 to 88.07 and 94.91 to 97.03 in Molakalmur Taluk
Annual maintenance of Road from Chikkobanahalli to Yerrehalli via Tumkurlahalli and road from Tumakurlahally to Udevu (upto Karnataka/AP border) via Nerlahalli, Konsagara Road From 0.00 to 0.45, 1.405 to 8.10, 11.20 to 16.70, 19.17 to 19.54, 20.13 to 22.96 and 23.03 to 27.05 Km in Molalkalmuru Taluk
Annual Maintenance of Selected Reaches of Road from Mavinakatte Cross (on NH173) to Ranagavvanahalli Gate (on SH24) via Mavinakatte, Mallapura, Doddagatta, Banasihalli, Kantapura, Bochenahalli, Hullukatte, Ranagavvanahalli from ch 0.00 km to 6.30, ch 6.90 to 7.10 km, ch 7.70 km to 11.61 km and ch 11.65km to 20.14 km in Hosadurga taluk
Annual Maintenance of Selected Reaches of Road from Peelapura connecting Aladahalli via Malali, Kondajji from ch 0.00 km to 7.81 km, in Hosadurga taluk
Annual Maintenance of Selected Reaches of Road from Malappanahalli Gate (on SH47) connecting Kittadal (on SH220) via Doddathekalavatti, Bukkasagara, Kanchipura from ch 0.00 km to 2.00 km, and ch 3.20 to 15.66 km in Hosadurga taluk .
Annual Maintenance of Selected Reaches of Road from Garaga (on SH152) connecting Handanakere (on SH251) via Tandaga, Kurubarahalli, Somenahalli, Gavirangapura, Chargondanahalli, Doddayennegere (NH69) Chikkayennegere, Gungavabagi from ch 0.00 km to 10.125 km, and ch 10.225 to ch 11.580 in Hosadurga taluk
A) Annual Maintenance of Selected Reaches of Road from Hagalakere Handpost (on SH47) connecting Belagur (on SH152) via Kalkere, Kabbala from ch 0.00 km to 7.04 km, in Hosadurga taluk .B) Annual Maintenance of Selected Reaches of Road from Panchanahalli Cross (on NH69) connecting Belagur via Panchanahalli, Niduvalli, Uppinahalli from ch 8.54 km to 12.46 km, in Hosadurga taluk
Annual Maintenance of State Highway-153 Connecting NH-206 Via Kadur, Hirenallur, Ajjampura, yaraganahalli from Km 20.11 to 29.50, Km 30.505 to 31.00 and Km 33.50 to 37.51 in Holalkere Taluk
Annual Maintenance of Dandigenahalli to Kagalagere Connecting Road via Andanuru, Gyarehalli, Udogere, Kagalagere from Km 0.00 to 3.00, Km 4.215 to 11.41 in Holalkere Taluk.
Annual Maintenance of SH-222 Chitradurga to Machenahalli joining road (A.P Border ) Gonuru- Belagatta -Hayakal via Manneboranahatti -Bosedevarahatti -Manumainahatti (SH-45)- Nayakanahatti (SH-45)- Mallurahalli -Mustalagummi (SH-65)- Surammanahalli (SH-65)- Harvinadoddi - Chikkobanahalli- Chikkumathi- Siddayyanakote- Yarrenahalli - Rayapura- Sulenahalli- Molakalmuru (NH544DD)- Haralayya- Hanagal (NH 150A) -Katanayakanahalli -Byrapura- Nagasamudra- Siddapura road from Ch 2.20 to 23.14 KM in Chitradurga taluk
Annual maintenance of Highway SH-65 connecting Malpe with Molakalmur via Udupi, Hebri,Agumbe, Begar, Koppa, Narasimharajapura,Sulageri, Bhadravathi, Chennagiri, Shanthisagar,Davanagere, Jagalur, Mustur and B.G .Kere (SH-65) from 279.77 to 305.27 and 309.32 to 309.50km in Molakalmuru Taluk
Annual Maintenance of A) Sirigere to Alagavadi Join road (SH-235) via Hosarangapura Ch 0.07 to 4.84 Km in Chitradurga Taluk B) Hampanuru Cross (NH-48) via Hampanuru to Pandarahalli via Halavudara Halerangapura Sirigere Chikkenahalli Konanuru Kadleguddu Bommenahalli Bheemasamudra Bettadanagenahalli Pandrahalli Ch 0.00 to 9.80 Km, 9.90 to 11.50, Km, 25.94 to 29.09 and 36.70 to 37.82 Km in Chitradurga Taluk
Annual Maintenance of Bacchaboranahatti cross to Mucchagunte joining road from Ch 7.07 to 11.41 Km in Chitradurga Taluk
Annual Maintenance of road from Chitradurga (NH-48) to Hunsekatte (SH-224) via Papenahalli- Rayanahalli- Chikkappanahalli- Madanayakanahalli Ch 0.00 to 19.00, 19.24 to 25.15 Km in Chitradurga Taluk
Annual maintenance of Road from Surammanahalli connecting Chikkumthi Cross via Harvinadoddi Roadm km 2.130 to 5.88 and 7.80 to 10.19 2)Road from Siddayyanakote connecting Chikkumti via Tumkurlahalli, Donetammenahalli Road km 1.52 to 3.90 and 7.20 to 9.36 3)Tuppadakkanahalli cross to Matadjogihally via Tuppadakkanahally, Yarenahally , Inalli. From Km 0.00 to 6.50 and 7.557 to 9.00 in Molalkalmuru Taluk
Annual maintenance of Road from veerapura conneting Somalapura (upto Karnataka/AP border) via Ramasagara, Devasamudra,Thimmalapura Road 0.60 to 4.20, 5.77 to 6.12, 6.26 to 9.00 and km 9.19 to 13.97 Km in Molalkalmuru Taluk.
Annual maintenance of road from Rampura to Malleharavu via Pakkurthi from Km 1.70 to 2.22, 3.82 to 4.22 and 5.62 to 10.89 2) Road from Veerapura Cross connecting Ashoka Siddapura via Veerapura Machenahalli connecting Karnataka AP borde Road From Km 0.00 to 4.72 in Molalkalmuru Taluk
Annual maintenance of Road from Devasamudra Cross to Urthal KarnatakaAP border Road Via Devasamudra, Vithalapura, Venkatapura From Km 0.00 to 0.10, 1.45 to 1.657, 1.875 to 2.556 and 6.1 to 7.70 2 Murudi cross to Somalapura road (karnataka to Andra Border road via Shirekola,Karadihally Road From Km 5.08 to 5.475 3 Bandravi cross to Hanumanagudda cross via Bandravi and Hanumanagudda from Km 0.00 to 8.40 in Molalkalmuru Taluk
Annual maintenance of Road from Vaderahalli connecting Pennamahalli (upto Karnataka/AP Border) via J B Halli,Pakkurthy, Rampura, K K pura, Thimmalapura Road From 0.00 to 5.90, 6.25 to 6.50, 6.6 to7.1 ,8.50 to 11.28, 11.70 to 12.10, 13.20 to 14.05 ,15.95 to 16.70 and 17.65 to 21.19 Km in Molalkalmuru Taluk.
Annual maintenance of Highway SH-222 Connecting Chitradurga to Machenahalli (AP Border) via Gonur, Belaghatta, Haikal, Manneborana hatty, Bosedevarahatty, Manumaihnahatty (on SH45), Nayakanahatty (on SH45), Mallurahally, Mustalagummi (on SH65), Surammanahalli (on SH65), Harvinadoddi, Chikkobanahalli, Chikkumthi, Siddayyanakote, Yerrenahalli,Rayapura, Sulenahalli, Molakalmuru (on NH544DD), Haralayya, Hanagal (on NH150A), Katanaykanahalli, Byrapura, Nagasamudra, Siddapura km 57.20 to 58.67, 60.14 to 62.34, 63.81 to 70.40,71.43 to 71.56, 71.67 to 72.50,73.38 to 74.00,74.45 to 79.90, 81.80 to 85.78, 87.05 to 91.60, 92.39 to 94.02 and 97.18 to 108.73 in Molakalmuru taluk.
Annual Maintenance of road SH-307 Kyadigere (NH-48) to Seebara (NH-48) Ch 0.00 to 18.67 Km in Chitradurga Taluk
Annual Maintenance of Road from Janukonda (on NH369) connecting Burujanaroppa Cross (on NH48) via Godabanahal-Mahadevanakatte-Kennehadlu-Chikkasiddavvanahalli-Burujanaroppa from Ch 4.60 to 20.69 Km in Chitradurga Taluk
Annual Maintenance of A) Bharamasagara to Donnehalli (SH-45) via Issamudra- Isssamudra Hosahatti- Nallikatte- Bidarakere- Nibaguru- Toranagatte -Honnamaradi Ch Ch 0.00 to 0.25 Km and 4.00 to 10.25 Km in Chitradurga Taluk B) Old NH Km 227.20 to 228.90 (Bharamasagara village limit) in Chitradurga Taluk C) Bharamasagara to (Old NH-48) Hosadurga road (SH-225) via Nandihalli- Yammaghatta- Bhahaddurghata- Muchanuru- Bilichodu- Asagodu Ch 0.00 to 9.08 Km in Chitradurga Taluk
Annual Maintenance of Yalagodu to Gangayyanahatti (SH-45) road via Chikkagondanahalli - Turuvanuru - Doddagatta Ch 0.00 to 4.40 Km, 5.90 to 8.03 Km and 19.50 to 23.52 Km in Chitradurga Taluk
Annual Maintenance of State Highway -243 Challakere (N.H.150A) to Vishwanathahalli (S.H.48) road via Parashuramadevarakote, Dharamapura, Sakkara, Dwaranakunte, Kodihalli, Ikkanuru, Pitlali, Adivala, Hiriyur, Lakkavvanahalli, Doddaghatta, Kurubarahalli, Bharamagiri connecting road Km 101.88 to 109.72, 116.46 to 142.64, 154.50 to 155.55, 158.00 to 159.60, 163.50 to 167.34 and 169.79 to 173.53 km in Hiriyur taluk
Annual Maintenance of Dharamapura to Doddabeerenahalli road via Khanajanahalli, Betur, Betur Palya road from Km 0.00 to 10.20 km in Hiriyur taluk
Annual Maintenance of Eshwaragere to Thimmalapura cross road via Hoovinahole, Myadanahole road from Km 0.00 to 9.07 and 9.12 to 11.00 Km in Hiriyur taluk
Annual Maintenance of Kumuta Kadamadagi road (SH-48) via Siddapura -Soraba- Shikaripura -Honnalli -Basavapattana- Chitradurga- Challakere and Pavagada road from Ch 244.89 to 245.39, 250.19 to 254.00, 257.03 to 260.00, 260.75 to 263.71, 270.85 to 273.30, 274.30 to 276.00 and 276.60 to 284.57 Km in Chitradurga Taluk
Annual Maintenance of A) Maradihalli to Maddihalli road via M.D.Kote, Maddanakunte, Kandikere, Rangenahalli, Shidlayyanakote, Gulya, Hosahalli, Suguru, Khanajanahalli, Betur, Hosakere, Khandenahalli road from 0.00 to 7.70, 7.90 to 15.39, 17.78 to 18.28, 20.28 to 23.46, 26.54 to 41.70 and 43.15 to 57.44 Km in Hiriyur taluk, B) Imangala to Maradihalli road via Maradihalli, Gollarahatti, Maradihalli road from km 0.00 to 6.08 Km in Hiriyur taluk
Annual maintenance of Road from Nagasamudra Cross to Huchangiduraga Road ( Karnataka/AP border) Via Nagasamudra From Km 0.00 to 3.29 and 3.95 to 7.46 in Molakalmuru taluk
Water supply pipe line work at w.no.33 stadium road, jogimatti road and national hotel back side road PD sir house back side in Chitradurga city.
Railings, Water proffing and other works to thyagaraj market in Chitradurga City.
Construction of Sluice Gate to Arasanakere Tank at Matadakurubarahatti in Chitradurga
Construction of Pure Drinking water plant (1000 Ltr) at 1.Sakkara 2.Maddihalli 3.Kalavebagi 4.ArLikere Palya 5.VK gudda 6.Hindasakatte 7.Haleyalanadu Lambanihatti village in Hiriyur Taluk.
Construction of Pure Drinking water plant (1000 Ltr) at 1.Surappanahatti Lambanihatti Tanda-2 2.Kurubarahalli Lambani Tanda 3.Vasanthanagara Lambani Tanda 4.M.G. colony Lambani tanda 5.K.R.Halli Manjunatha nagara 6.Bhutaiahnahatti 7.Sondekere 8. Rangenahalli Hosuru S.C. colony villages in Hiriyur Taluk
SUPPLY OF PACKING MATERIAL HDPE WOVEN SACKS
Facility Management Services - LumpSum Based - COMMUNITY HEALTH CENTRE, BELAGURU; SUPPLY OF DRUGS AND DISPOSABLE ITEMS; Consumables to be provided by service provider (inclusive in contract cost)