Loading…
Loading…
7,365 results • Latest
REPAIRING OF DIESEL TANK, FIP PUMP AND INJECTOR OF FIRE TENDER JH10BY 9072 OF AAWS, KATRAS AREA
ENGINE OVERHAULING, REPAIRING AND INSTALLATION JOB OF HYVA REG.NO JH10AD 4357 UNDER AAWS, KATRAS AREA
(1).MAINTENANCE OVER HEAD LINE OF 3 PHASE 3.3KV, SECONDARY PUMPING FEEDER FEEDER NO.-1 FROM KANTAPAHARI SUB STATION TO AKWMC OCP (2).DISMANTLING ERECTION JOBS
REPLACEMENT OF EXISTING DAMAGED TRANSFORMER AND INSTALLATION OF HTAND SWITCHGEARS KATRAS LT AT NEW TOWNSHIP SUBSTATION BEHIND KATRA
1.HAULING OF HP MOTOR WITH BASE PLATE, 20 NOS. MISCELLANEOUS ITEMS FROM 33 PILLER TO 27 PILLER AT U/G -2 SEAM OF WMC SUCTION OF AKWMC (2). INSTALLATION OF PV-3 PUMP MOTOR SET COMPLETE WITH ELCETRI
Repairing of 9 no. transformer room loyabad under Sijua Area
Repairing maintenance to the qtr. Of Md Alam Khan, Gen. mazdoor at chandmari bastacolla colliery under Bastacolla Area
Repairing and Maintenance of Community Centre (Shiva Mandir) at Sonar Basti, Bastacolla under Bastacolla Area.
plasmaaircuttingmachine (Q2)
SECONDARY CRUSHER DRUM REPAIRING AND MODIFICATION JOB AT SIJUA SIDING, CHP, KATRAS AREA
(1).INSTALLATION OF 3000GPM (PUMP NO.2)PUMP MOTOR SET WITH ELECTRICALS AND LAYING OF SUCTION DELIVERY PIPE LINE 8DIA APPROX 360M LENGTH AT ASGKCC OCP KATRAS AREA
SHIFTING AND LOWERING OF TWO NO 2000GPM,(B)4000GP M (C) 2000GPM PUMP MOTOR SET COMPLRTE MECHNICAL WITH ELECTRICAL FROM OCP WEST SIDE OF OCP SUMP AT WMC UNDER KATRAS ARE
Cleaning of river bed and jungle are required for smooth flow of water of Pussai river during rainy season at Chapapur-II Colliery.
Maintenance of main feeder from 132 KV 11KV O/H line and G.T feeder from G.T Gopalichak 11KV O/H line to avoid frequent break down under HMP Colliery of P.B Area.
Maintenance and rectification of 11KV O/H Line to avoid frequent break down under Bararee Coke Colliery.
Maintenance of Kenduadih main G.T feeder, E.B section 11KV and Ganshadih 11 KV O/H line to avoid frequent break down under Kenduadih Colliery of P.B Area.
Cleaning of 01 No ROCP 60 Tone and Bastacolla OCP 60 Tone Road Weighbridge of Bastacolla Area and Queterly Testing of 02 No Weighbridge Rajapur OCP and Bastacolla OCP 60 Tonne WB
Re Verification of 01 No Weighbridge i.e. Kuya OCP and Shifting of 02 Times Additionally Required 5 Tonne Test Weights i.e. 5 Tonne Test Weights from Different weighbridge to Different weighbridge respectively
1. Track chain of dozer out by proper jacking. 2. Link cutting of old track chain 14 pc.
1. The damage structure of the all four side of the cabin strengthening rusted portion of structure cutting and new M.S. sheet changing by welding. 2. The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
Construction of 10 Ten nos. Sectionalisation stoppings in 2 and 7 incline at Shampur-B Colliery.
Cleaning of pucca and kachcha drain for Monsoon preparation at Shampur-B Colliery.
Construction of 4 Nos of pump seating 3 nos. in 5/6 Incline and 1 no. in 2/7 Incline at Shampur-B Colliery.
POJ Floor Standing Storage Unit With door With Mild Steel Brand: POJ (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687790091737 dt.15/09/2026)
Decowindow Stainless Steel 304 Curtain Pipe, Sider and mounting bracket, Length 3 Meter Brand: Decowindow (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-51168771544354
E N M SPARES
1 Construction of 8 ACR in UHS SINDRIBASTI 2 Construction of 8 ACR in UPG H S KAMARDIH in Dhanbad District of North Chotanagpur Division of Jharkhand.
1 Construction of 11 ACR in PANDRA H SPODDARDIH 2 Construction of 11 ACR in SHIVAJEE plus 2 H S BENAGORIA in Dhanbad District of North Chotanagpur Division of Jharkhand.
Construction of Road from Bagdigi Hatti Talab to Aluminium Quarter via Karbala Road (L-1.850 Km.)
Construction of Road from Motiya patti Rajkumar Ram house to Samudaik Bhawan Road (L-1.400 Km.)
Repairing and Maintenance of Qtr No D1 Officer Colony Bera Under Bastacolla Area
Monthly Basis Cab & Taxi Hiring Services - MUV; 1800 Km Per Months; Local 24*7
Construction of fencing along the mine boundary at different location of mines under Kusunda Area
Work of repairing of platform structure of Benidih Road weighbridge running under Block-ll Area.
Providing and Laying of PVC pipeline from Shashi Paswan house to Goshala Bastacolla under Bastacolla Area
Leakage repair in 12 inch dia pipeline from Jamunia water treatment plant to Luti Pahari Ambedkar Chok, Modian Dukan and miscellaneous etc under JWTP Block Area.
Leakage repair in 16 inch dia pipeline supplying water from Harina Boosintng to Jagdish petrol pump Jamua Tand to Barora Matha Bandh and 10 dia pipe line supplying water from Harina Boosting to barora area and mescellinious work under JWTP Block Area
complete Overhauling and repairing of 3.3KV, 600Amps. VCB, SL.NOVCB/5197, MakeAndrew-Yule of ABNS colliery
Complete Repairing/Maint of HT (6,6 KV 400 A OCB, MakeECE, Sl. No. WS-3 for Main Colony Sudamdih under ASP (Shaft) Colliery
complete rewinding / repairing of 250KVA Transformer 6.6KV / 440V, SLNO - B-13937 Alumnminium Core, Make- GEC for Tower Power Supply Sudamdih River side under ASP Colliery
Complete Repairing of One 400 Amps. 550- Volta, G.E.C. Make - OCB, of ABNS Colliery. Sl. No.30/1397
Complete Repairing and Overhauling of One 400 Amps, 3.3 KV, Prabhu Make FLP Switch of ABNS Colliery
Procurement of Stationery items for day to day office use for
Making 4 no. dustbin at RHN colony in NPTS under Sijua area
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Procurement of spares for Seal flush pumps of H P Ammonia
WASHERY SPARES CONTACT ASSY AND OTHERS
REPLACEMENT OF LOAD CELLS AND DIGITIZER CARD COMPATIBLE WITH D IGITIZER MAKE PRAGATI, MODEL Q 6500 AT GASLITAND 60T ROAD WEIGHBRIDGE -6500 AT GASLITAND 60T ROAD WEIGHBRIDGE. KATRAS AREA
Laying, Jointing and Fitting of MS pipe 6 Inch Dia after Dismantling Damaged Pipe at 0 Seam at Kuya Colliery.