Loading…
Loading…
7,348 results • Latest
Different type of pumping works related to shifting of pump-motor set, fitting of tanker post and its pipe line diversion and extension associated with Jamunia Patch of ABOCP Mine.
Re-Assembling of Pipe Lines 6inch dia 8inch dia delivery range near high wall side and other miscellaneous work at Jamunia patch of ABOCP mine.
Work at electrical OH Line 6.6 KV, SAG Conductor re-tenting, damaged conductor changing, dismantling and erection pipe poles and other work in Kessugarh Weigh bridge ABOCP mine under Block - II Area.
Work Erection of 440V LT O.H line at Regional store and magazine for providing power supply to high most tower light under Matigarh Township Block-II Area.
A)Dismantling, Erection, repairing of 6.6KV SF No.I 6.6KV Benidih feeder 6.6KV D.L feeder power supply DM-3.522 D.L M.C, 4000 GPM, 3200 GPM pump Jocp patch e (B) Dismantle and repair of 440V,220V LT O.H line clear the area and locations of ABOCP mine
A. Diversion of 440V L.T. O.H line 14 nos Clear the area Dumper yard Power supply 14 No ATT. office MAX Tower and dismantling of 6.6KV O.H line of Coal face clear the OB Dumping Area B. Break down repairing of 6.6KV Dragline feeder near Shiv Mandir
Work of electrical BD in haul road Andha more to CISF check post and damaged pole and overhead line in work is lighting line 18 No dump DL face etc ABOCP Mine under Block II Area.
Two-wheeler Motion Platform
Complete Repairing of 6UP3 Pump Kirloskar make of Filter Plant Moonidih, WJ Area. SL.No. MND/6UP3/FP/01
Repair and Maint. GM Bunglow inside portion at jorapokhar under Sijua Area (under Shifting case).
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - MUV; Hiring of one AC operation Diesel driven Ambulance( TATA Sumo ambulance/TATA winger ambulance/Mahindra Bolero Ambulance or equivalent) prevailing present pollution norms for DVC, CSR Wo..
Procurement of spares for RO Membrane Housing installed
Procurement of spares for Antico Make pumps installed in
Procurement of Cartridge assembly and spares for C02
Repairing and maint. Of O/H line 440V, 3phase 4 wire circuit at VTC colony, CISF colony and 35 no for domestic power supply (BPH) under EJ Area
Repairing and maint. Of 3.3 KV 3 phase O/H line from BPH to Sub OC feeder through Area Office, WB, Bhowra Club and 29/30incline under EJ Area
erection of 11kv feeder from 5no Jahajtand to crusher point for operation of both crusher simultaneously with shifting and commissioning of transformer 11kv/440v 500KVA with electrical under ABNS colliery
diversion of 3.3kv 3 phase 3pit feeder under ABNS colliery
erection of 3.3kv 3 phase O/H from substation to pump site for operation of hired pump under ABNS colliery
Custom Bid for Services - Rehabilitation of the High Voltage Power Frequency Withstand Test Setup at CTC, DVC, Maithon Similar Category Repair and Overhauling Service Repair, Maintenance and Installation of Plant Systems/Equipments
Annual Contract for Special repair, civil renovation and minor construction works of Hostel Zone buildings in IIT ISM Dhanbad Main Campus
Annual Civil Maintenance Contract of Academic Zone buildings in IIT (ISM) Dhanbad Main Campus Zone B
REPAIRING OF FLOWMETER INSTALLED AT DIFFERENT LOCATIONS UNDER GOVINDPUR AREA
Custom Bid for Services - Statutory testing of Electric hoist Chain pulley blocks Compressed air receivers and Governor pressure oil Tanks etc. at PHPS DVC Panchet Similar Category Support Services
Procurement of Feeder Protection Relay (REF 615) for Panchet Hydel Station, Panchet
Dismantling, Lowering and shifting of one motor at Loading section and one motor of EOT Crane at Receiving Pit of Madhuban Coal Washery under Block-II Area, BCCL
Replacement, repairing of worn out intermediate frames, deck plates and liner plate for fix chute and erection of idler frame with rollers, return rollers, fabrication and erection of same at unit no. 506 belt conveyor of ROM section at Madhuban Coal
Repairing and replacement of feeding chutes liner plates of unit no. 701-2 and bypass chute of unit no. 501-3 of ROM section at Madhban Coal Washery under Block-II Area, BCCL.
Dismantling, shifting, erection and fabrication of same Grizzly at PS-1 Hopper, ROM section of Madhuban Coal Washery under Block-II Area, BCCL.
Removal of coal, boulders from Gyratory crusher hopper which is obstructing the flow of coal for crushing thereby hmpering the plant production of Madhuban Coal Washery under Block-II Area, BCCL.
POJ Composite Office Tables confirming to IS 8126 Three-drawer unit Brand: POJ (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687715946741 dt.23/08/2026)
XLPE Cable, Working Voltage from 3.3 kV up to and including 33 kV (V2) ISI Marked to IS 7098 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Construction of a culvert and drain near the house of Nandu Chauhan under Nagarikala South Panchayat (2) Installation of a solar-based water tower at the hand pump near Mohalidih Chowk under Mohalidih Panchayat.
Installation of a solar-based water tower at Pathuria High School under Pathuria Panchayat (2)Installation of a hand pump beside the cemetery under Jangalpur Panchayat (3)Installation of a hand pump near the Anganwadi Centre under Karmatand Panchayat
Digital Tunable Band Pass filter
Supply of Battery Chargers suitable for Plante type Lead
Palubeda under Ukma Panchayat (5) near the house of Baghghutumangal Murmu under Rupan Panchayat (6) near the house of Binad Mahto at Jamdiha under Rupan Panchayat (7) near the house of Mangal Hembram at Duma under Mairanwatand Panchayat and others
(5) at Kanadih Tola under Tilabani Panchayat (6) near the Anganwadi Centre at Gop Tola under Murgabani Panchayat (7) at Rampur Mauza under Sahraj Panchayat (8) at Baddohi Mohli Tola Colony under Tilabani Panchayat (9) at Lipidih Tola under Tilabani
Alumino - Ferric (V2) Conforming to IS 299 (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
Motorized Analogue cum Digital Charpy Pendulum Impact Tester
Construction of a PCC road from Jiml Dhaura School towards Hanuman Temple up to the houses of Suman Singh and Krishna Das under Tetulia Panchayat (2) Construction of a 30/25 tin shed at Prem Nagar under Sinidih Panchayat.
Dual-Channel Infusion and Withdrawal Modular Syringe pump
Construction of a 350 ft PCC road from the house of Nathumahato towards Ambona Road under Moranga Panchayat.
Installation of a solar-based water tower at the old hand pump at Tetultand under Badadaha Panchayat (2) Installation of a solar-based water tower at the old hand pump at Kamar Tola, Raghunathpur under Badadaha Panchayat.
Construction of a 50 ft bathing ghat at Bhola Turi pond at Barkey under Bagda Panchayat (2) Construction of a 50 ft bathing ghat at the big pond in Bhawardaha Village under Bagda Panchayat (3) Construction of a 50 ft bathing ghat at the Bara Talab
Installation of a water tower at the hand pump at Karam Dhaura under Malkera North Panchayat (2) Construction of a bathing ghat at Tarabandh under Malkera North Panchayat (3) Construction of a bathing ghat at Hanuman Nagar under Sinidih Panchayat.
Construction of a 50 ft bathing ghat at Chainpur Gedwa Bandh under Jamdih Panchayat (2) Construction of a 50 ft bathing ghat at Shyam Gedia, Dhuwatand under Kanchanpur Panchayat (3) Construction of a 50 ft bathing ghat at Kanchanpur Sundi Bandh under
(5) near Bajrangbali Temple at Ganduwa under Sijua Panchayat (6) in front of Sonbad Aman Mosque under Sonbad Panchayat (7) at Jitpur Jaherthan under Belkupa Panchayat (8) at Belkupa Gorai Tola under Belkupa Panchayat (9) in front of the Jio Tower