Loading…
Loading…
91 results • Latest
Auto disabled Disposable Blood Lancet
CE/EAP/ADRHARDP/Pkg. 2G Upgradation and 4-year maintenance of Corridor2 Near Jiri 96.500KM to near Longkuk 112KM under ADRHARDP Total Length 15.500 km
CE/EAP/ADRHARDP/Pkg. 1D Upgradation and 4-year maintenance of Corridor1 Kalachand 73.742km to Thaisalinghawer 98km under ADRHARDP Length 24.258 km
CE/EAP/ADRHARDP/Pkg. 1C Upgradation and 4-year maintenance of Corridor1 From Km 57 Purana Hajong to Km 71.738 at Bashabari under ADRHARDP Total Length 14.738 km
SUPPLY AND DELIVERY OF ONE SMART PAD II AT KHPS ( 1 set ), SUPPLY AND DELIVERY OF ONE AED CABINET WITH ALARM AT KHPS ( 1 set )
Construction of Additional Classroom at Fiangpui Higher Secondary School, Harangajao Dist-Dima Hasao
Upgradation of roads MRL09-Longkok to Nobdi Daulagupu including Cross Drainage Works and Routine Maintenance of the works for 5 years under PMGSY-III, batch 1, 2022-23. (Balance Work)
Recovery and Reconstruction of T05 to Hokai HC Road under NDRF(PDNA-2022) for the year 2025-26.
Periodic Renewal of (i) DD road to Tereh village (Constructed under PMGSY Package No.AS1801 ) (ii) DD road to Wasubil (Constructed under PMGSY Package No. AS1812) (iii) DD road to Borowashiling village (Constructed under PMGSY Package No. AS1801) (iv
8 MP intelligent varifocal network camera, 4 MP 32X IR network dome camera, 64 channel network video recorder, Joystick for PTZ camera control, 8 TB surveillance hard drive, 8 port web managed smart POE switch, L3 switch 16 port, 1000 Base LX SFP transceiver module, 75 inch UHD smart display, 15 meters HDMI cable 4K, Outdoor cabinet 12U, Wallmount 12U 600D, Online UPS system 6KVA, MS rack and IRIT link for SMF batteries, SMF battery for 60 minutes 12V 42AH, Online UPS system 2KVA, Cat 6 UTP cable outdoor cable, Cat 6 UTP cable unarmoured, OFC cable 12F SM HDPE, Patch cord LC 3 meter, Optical fibre cable joint closure, Fiber drawer LIU, Patch cord CAT 6 UTP, PVC conduit pipe casing and crapping, MCV 10 Amp with metal box, Industrial 2 point 5 copper cable 90 meter, 2 point 5 mm 2 core copper cable, HDPE pipe 32 mm, GI wire for stinging, SS combine 16 Amp, Round 7m GI Pole Dia 76mm, Optic fibre cable clamp, OFC cable bracket, GI pipe 3 inches, Socketweld Galvanised elbow 3 inches, Installation and commissionig of CCTV system, Laying of OFC cable, Laying of Cat cable, Erection of GI pole, Laying of GI pipe
CE/EAP/ADRHARDP/Corr_2/Pkg.5 Upgradation and 4_year maintenance of Corridor_2 from Km 15.860 near Girijanapur to Km 30.700 Semkhor under ADRHARDP Total Length 14.84 km
CE/EAP/ADRHARDP/Corr2/Pkg.4 Upgradation and 4-year maintenance of Corridor2 Near Maibang_Km. 54/476 to Near Gunjung_Km 82/100_Excluding the section from Km 78.530 to Km 79.960_1.43 km under ADRHARDP
Package No. CE/EAP/ADRHARDP/Corr_I/Pkg.3 Upgradation and 4-year maintenance of Corridor_1 From Km 98.000 (Thaiplungdisa) to Km 122.000_Dikrangso_Excluding the section from Km 100.950 to Km 105.400_4.450 km under ADRHARDP
MCB Volt 500V DC 2 Pole C Curve In 16A, Auxilary Contactor 1CHO, MCB Volt 500V DC 2 Pole C Curve In 4A, MCB Volt 500V DC 2 Pole C Curve In 6A, MCB Volt 500V DC 2 Pole C Curve In 10A, Indication Lamp Blue Color, Contactor Aux Volt 220V DC 4NO, Auxilary Contact AS, Contactor Aux Volt 220V DC 2NO plus 2NC, Illuminated Push button Red Color, Stay put type switch 2 Position, Rectifier Diode Module, Push Button Green, MPCB 52 to 65AMPS TP 415V AC, MPCB Aux Contact Signaling Right, MPCB Auxilary Contact, Main Contactor, Delta Contactor, Star Contactor, Add On Block, Timer, Indication Lamp Amber, Digital Ammeter, Selector Switch, Neutral Link, Terminal Block 2point5 SQMM, Terminal Block 50 SQMM, MPCB, Contactor 230V AC 50HZ, CT Terminal Box, Miniature Circuit Breaker 4P 32A 10kA 1Sec, MCB TRIP, Power Contactor 230V 50Hz, Speed Monitor, Stay Put Type Switch, Spring Return Type Switch, DSF Hall Effect Sensor, Transceiver For Media Module, Enclosure Internal Thermostate, Diode, Signal Horn AUH 2448, MCB C60H C 6A 2Pol, Aux Cont 1CHO, MCB C60H C DC 2A 2Pol, Miniature Circuit Breaker C60H C DC 6A 2Pol, Contactor 3RH21 22 1AP00, Auxilary Contactor 3RH21 22 1BB40, Auxilary Contactor 3RH21 22 1BM40, Varistor 3RT2 916 1JL00, Auxilary Contact 1HA22, Auxilary Contactor 3RH21 40 1BM40, Terminal Relay PLC RSC 24DC 21 21, Double Frequency Meter ELFD 96, Double Scale Voltmeter SIF96, Mushroom Actuator P2AMLKB4, Selector Switch P2AS2 2P 1NO, Selector Switch P2AS2 2P 1NC, Push Button P2AF8, Selector Switch E3PSR 2NO, Selector Switch E3PSR 1NO 1NC, ILPB AMBER 2LHLR, ILPB RED 2LHLR, Door Limit Switch, Electronic ON Delay Timer With 2C, Door Limit Switch SZ, LIGHT SZ 4138POINT140, Fuse 3NWNS2, MCB C60H C DC 16A 2poI, MCB C60H C DC 6A 2poI, MCB C60H C 10A 2poI, Contactor CA3 KN22MD, Indicating Lamp Blue Color 2PLBR6L, Contactor CA3 KN40MD, Auxiliary Contact AS LA1KN40, Illuminated Push Button Red Color, SELECTOR SWITCH GBSS KAY RP21012, Heater, Socket outlet PENTA PC 14616, Enclosure internal thermostat
Transformer Oil Filtration Plant 6000 LPH ultra-high vacuum type, Mobile 20 KL transformer oil storage tank
Recovery and Reconstruction of Natun Gunjung Bagetar Road under NDRF(PDNA-2022) for the year 2025-26.
ORING W98413600189, ORING W96415300245, ORING W98414500161, ORING W98414300910, ORING HW5981786019, ORING HW5984493101, ORING W90414300033, ORING W98414900445, ORING W98413502454, ORING W98413600472, ORING W98415300085
Recovery and Reconstruction of Natun Gunjung North Bagetar New Hospital Road under NDRF(PDNA-2022) for the year 2025-26.
MMPPNA_RIDF_XXXI_25_26_355 Construction of PGHJ Road to Ashrang village under Mukhya Mantrir Paki Path Nirman Achani under RIDF-XXXI of NABARD for the year 2025-26.
Recovery and Reconstruction of road Bagetar New Hospital Road under NDRF(PDNA-2022) for the year 2025-26
Design, Engineering, Manufacture, Supply, Testing and supervision of ETC of 11/132KV 3 Ph28.5 MVA GT
Supplying Providing and Installation of SMC Panel Water Tanks 5 Nos 72000 Ltrs capacity including foundation civil works at Permanent Water Treatment Plant PWTP KHPS
SITC of 24 Nos 400 Ah, 2 Volt TGEL Battery for 5 KWp capacity Off grid Solar Power Pack System at Halflong MDG under Cachar Division, Assam Circle
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; upto 3; PACKAGE-5 : Water purifier and conditioning system maintenance involving basic servicing, ..
Recovery and Reconstruction of Old Kubin to Mongon Road under NDRF (PDNA-2022) for the year 2025-26
Construction of New Building of 100 Secondary Schools under RIDF-XXXI (2025-26) for Langting HS School under Haflong TBD ( Package-79)
Construction of Mini Stadium at Muolhoi, Haflong, DimaHasao District, Assam
Repair and Maintenance of NEEPCO Health Centre KHPS NEEPCO Ltd
Improvement of Avenue Road Main gate to Shiv Mandir Gate and Guest House Road from Junction point of Avenue Road near Administrative Complex at KHPS NEEPCO Ltd
Single Use Sterile Rubber Surgical Gloves Conforming to IS 13422 (Q2), Single Use Medical Examination Gloves Conforming to IS 15354 (Part 1) (Q2) (3 (3 ))
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; BRAND NEW; BRAND NEW; Non A/C; 8
MMPPNA_RIDF_XXXI_25_26_354 Construction of (1) Bypass Road from Sontila Siva Mandir to SS Road (2) Phalaiphadi Village Road under Mukhya Mantrir Paki Path Nirman Achani under RIDF-XXXI of NABARD for the year 2025-26.
Recovery and Reconstruction of Ramnagar Natun Basti Road under NDRF(PDNA-2022) for the year 2025-26.
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin, Manpower Outsourcing Services - Minimum wage - Semi-skilled; High School; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Admin
Monthly Basis Cab & Taxi Hiring Services - SUV; 1200 km x 208 hours; Local 24*7
MMPPNA_RIDF_XXXI_25_26_357 Construction of road from (i) NH-27 to Diblong ME Scholl (ii) NH-27 to Rongphangdisda-II Village (iii) NH-27 to Choto Lalbomg Village under Mukhya Mantrir Paki Path Nirman Achani under RIDF-XXXI of NABARD for the year 2025-
CE/EAP/ARRBP/OCB/Bridge1/Dima Hasao/14 Construction of Bridge in Dima Hasao District i) Br.No. on SS Road to Moti Hojai via Riam Bathari village
AMC/CAMC of Hydro Energy Power Plants - Non- comprehensive; Others; Storage schemes; Monthly
Recovery and Reconstruction of Devisthan Mandir Road under NDRF(PDNA-2022) for the year 2025-26.
Recovery and Reconstruction of Kalibari Muolhoi Road under NDRF(PDNA-2022) for the year 2025-26.
MMPPNA_RIDF_XXXI_25_26_360 Construction of (i) SS Road to Motilongmailai village Road (ii) Diduki-Il to Diduki -1 Road (iii) NH-54 to Thoinagar Road under Mukhya Mantrir Paki Path Nirman Achani under RIDF-XXXI of NABARD for the year 2025-26.