Loading…
Loading…
3,431 results • Latest
Minor Repair at Middle school Dadi Kathawa under PM Shri Samagra shiksha
Major Repair at High school Poneja under Samagra shiksha
Repair of differential and gear case of LBPV marksman veh BA no 24F007192P
Repair of differential and gear case of scorpio rakshak veh BA No 22B137287L
Constt of Fencing of Shiv Mandir W.No 06 Motla Pyt Mallan A Block Bhagwah (DDC Grant) 3rd Call
Constt of P work near Satya Narayan Mandir Upper Malhori Pyt Malhori Block Khellani (CDF)
Constt of R Wall near Shiv Mandir at Kilmil in Pyt Shamthi Block Assar (CDF)
Constt of Toilet and Bathroom near house of Rakesh Kumar at village Bulandpur Pyt Bulandpur Block Assar (CDF)
Constt of Tile work at Upper thakur Mohalla in Pyt Topneel Block Assar (CDF)
Constt of P work NHO Balwant Singh RO Batara Part-II Pyt Batara Block Bhallessa (CDF)
Constt of P work NHO Balwant Singh RO Batara Part-I Pyt Batara Block Bhallessa (CDF)
Laying of Pipeline for Irrigation purpose from Surakh Nallah to Mohalla Nhid Pyt Malhori Block Khellani (CDF)
Constt of Bathroom at Forest Guest House Hanga Pyt Hanga Block Bhaderwah (Untied Grant)
Land Levelling and P/work at Shri Nag Temple Thuba Pyt Thuba Block Bhaderwah (Untied Grant)
Balance of work Mandir Dharamshala Upper Arnora ward 1 Pyt Upper Arnora Block Ghat (DDC Grant)
Construction of Tile Work at proper chill Pyt Chill Block Assar (BDC Grant) 2nd Call
P/path Upper Seri towards Lower Seri Pyt Chill Block Assar (PRIs Grant) 2nd Call
Construction and Maintenance of Road L071-Km 18th of Kahara Bathri road to Hutten Package No. JK04-4528, PMGSY-IV, Batch-I of 2026-27, Block-Kahara, District Doda Length 4.500 Kms
Constt. Of wooden foot Bridge at Keen Nallah Pyt Haddal Block Chilly Pingal (APDP) 2nd Call
Constt of drain from sunny house towards kunda via ho om kumar and p path bishan house towards seel chand w 4 Pyt Southa Block Bhalla (PRIs Grant) 2nd Call
Kitchen shed at Middle School Kholra ward 05 Pyt Nalthi Block Bhaderwah (PRIs Grant) 2nd Call
P/Path from MR to HO shoket naik Narnoo Pyt Kursari Block Bhaderwah (PRIs Grant) 2nd Call
Constt R/wall/tile work Eidgah manoo Pyt Manoo A Block Chilly Pingal (PRIs Grant) 2nd Call
Constt of of P/path Gorsi mohalla graveyard to old path W4 Pyt Bhatoli Block Chilly Pingal (PRIs Grant) 2nd Call
Room for Community Health Center at Bhalwana Pyt Bhalwana Block Gundna (APDP) 2nd Call
BOQ
BOQ
Hiring of vehicle one number Mahindra Scorpio Top Model Bolero Top Model to be used on daily basis
Repair and Periodic Maintenance of Farmtrac Tractor 20156
Telemedicine facility at PHC Chilly
Repair and Periodic Maintenance of Ashok Leyland Guru 3270
Periodic Maintenance of Snow Cat 2013
Repair and Periodic Maintenance of Preet 1486B Tractor
Construction of p/ work NHO Gowari Devi w.no. 07 Pyt. Alnigangota A Block Changa (CD, Pyt)
Construction of R wall/ protection work at Shivnagar wno 08 Pyt Kuthyara Block Assar (CD, Pyt)
MT STORE
Construction and Maintenance of Road L080-Km 19th TKN Road to Sonouth Package No. JK04-4536, PMGSY-IV, Batch-I of 2026-27, Block-Jakyas, District Doda (Using Waste Plastics Length-5.400 Kms) Length 5.400 Kms
DC Bench