Loading…
Loading…
1,155 results • Latest
Construction of covered drain and CC road as per requirement from Jaihind Gupta s house behind Shankarji temple in Sujawalpur of ward no. 14 via Bulbul Yadav s house to the courtyard and square in front of Mohan Gupta s house and till Baba s tomb.
Construction of covered drain and CC road on both sides from Manoj Gupta s house to Girish Jati s house in Peernagar of Ward No. 10.
Construction of covered drain and CC road from Kajal Cosmetic to BBN Public School via Santosh Kushwaha s house to Vinod Maurya s house in Ward No. 07.
Construction of covered drain and CC road on both sides from Munni Devi s house to the railway road in Baba Ji Colony of Jhingurpatti, Ward No. 12.
Construction of covered drain and CC road from Zeeshan Ahmed s house to Meraj Ahmed s house near the water tank of Gorabazar in Ward No. 09.
Covered drain and CC road work on one side from Dharmendra Singh s house to Ravindra Singh s house in Kurtha of Ward No. 01.
Construction of CC road and drain from Mahesh Yadav s house to Mohd. Anwar via Majid s house in Ward No. 01 Pavahari Baba.
Construction of covered drain and CC road from the gate of Government Poultry Farm in Mohanpurwa of Ward No. 02 via Madhav Pal s boundary to Ramchandra Kashyap s house.
Construction of covered drain and CC road from Mayank Srivastava s house to Nisha Singh s house via Satish Singh s house in Chandra Colony, Ward No. 10.
work of making the 33 KV Peernagar line from 132 KV Andhau to Minnapur, 33 KV underground cable into double circuit and overhead line Under EDD-Ghazipur nagar_and repair of 33 KV Muadha and installation of long span poles under EDD-Saidpur, Ghazipur
Construction of covered drain and CC road on both sides from the house of Rajnikant Pandey to the house of Shailesh Rai via the house of Shri Bhim Singh in Ashtabhujai Colony of Ward No. 25.
Construction work of a big drain and CC road on one side from Masjid Hadi Ali Joodan Shaheed to Ali Raza s house in Ward No. 22.
Construction work of covered drain and CC road from the wooden stall of ward no. 20 to Sheetla Mata temple via the houses of Kanhaiya Bind and councilor Kusum Bind.
Construction of covered drain and CC road from Sanjay Singh s house to Shashi Prakash Kannaujiya in Mughalani Chak of Ward No. 25.
Construction of RCC drain and CC road from Sunita Tripathi s house to the house of Advocate Narendra Pratap Singh via Kunwar Visheshwar Singh s house in Viveki Rai ward of ward no. 07.
Construction work of covered drain and CC road on both sides from Manish Rai s house to Manish Srivastava s house via Maruti Rai s house behind Galaxy Marriage Hall in Tulsi Sagar of Ward No. 03.
Waste Container (V3) (Q4)
Facility Management Services - LumpSum Based - Residential; Supply and fixing of yatri nivas at different place of K P barachavar size 10 Ft x10 Ft x12 Ft hight floor is coted by tiles and bench size 8 Ft x 2 50 Ft in all respect complete work; Consu..
Patch repair in vikashkhand Kasimabad ODR and VR Group-2
Patch repair in vikashkhand Mardah ODR and VR Group-1
Patch repair in vikashkhand Mardah ODR and VR Group-2
SILT CLEARANCE OF GARAR DRAIN FROM KM. 0.000 TO 5.600.
SILT CLEARANCE OF KHARA DRAIN FROM KM. 0.000 TO 6.400.
Octagonal Pole (V2) (Q3)
Octagonal Pole (V2) (Q3)
CONSTRUCTION OF 33 KV LINE FOR 33/11 KV SUBSTATION MARDAH, BIRNO AND PANSERVA FROM NEW PROPOSED 132/33KV GAZIPUR -II (MARDAH ) ON SEMI TURNKEY BASIS.
Pothole and Patch Repair Work on Rural Roads Falling Under Bhadaura Block Part 2
Pothole and Patch Repair Work on Rural Roads Falling Under Zamania Block Part 2
Pothole and Patch Repair Work on Rural Roads Falling Under Mardah Block Part 1
Pothole and Patch Repair Work on Other District Roads Falling Under Birno Block
Pothole and Patch Repair Work on Other District Roads Falling Under Mardah Block
General Rapair and Renewalof the link road from Devkali Musahar Basti to Bakaniya
Urgent Day to day maintenance of T.E.buildings, Staff Qtrs. in BSNL Compounds in OA Ghazipur under Varanasi BA for (Six Months).
CONSTRUCTION OF NEW 33 KV LINE FOR 33/11 KV SUBSTATION DHADHANI FROM 132 KV SUBSTATION ZAMANIA, DISTT. GHAZIPUR ON SEMI TURNKEY BASIS.
MAUDHIYA MUKHYA MARG SE RAJBHAR KE GHAR TAK ENTERLOCKING KARY
BHUDKUDA ME PICH ROAD SE ANUSUCHIT BASTI TAK ENTERLOCKING KARY
MEERPUR ME PICH ROAD SE ANU BASTI TAK ENTERLOCKING KARY
BIJHARI PICH ROAD SE ANUSUCHIT BASTI TAK ENTERLOCKING KARY
KAMARDEYPUR ME PICH ROAD SE RAJBHAR BASTI TAK MARG KA NIRMAN KARY AND LEPAN KARY
BARODIH ME PICH ROAD SE ANUSUCHIT BASTI MARG KA NAVNIRMAN LEPAN KARY
GAURA KHAS ME VINOD KE GHAR SE NALA TAK DAKKANDAR NALI NIRMAN KARY
VIKASH KHAND MANIHARI KE GRAM PANCHAYAT MADHUBAN ME GULAB SHARMA KE GHAR KE SAMANE SU JUNIOR HIGH SCHOOL TAK ENTERLOCKING ROAD KA NIRMAN KARY
VIKASH KHAND SAIDPUR KE GRAM PANCHAYAT SINGARPUR ME PMGSY ROAD SE RAJKUMAR SINGH KE GHAR TAK DONO TARAF 9 INCH KA DIWAL SAHIT C.C. ROAD KA NIRMAN KARY
HATHIYARAM ME PICH ROAD SE RAJBHAR BASTI TAK ENTERLOCKING KARY
Renewal of Yusufpur Balapur road to Balapur link road
GRAM SABHA SINGERA ME MAIN ROAD SE VIJAYSHANKAR SINGH KE DARWAJE TAK CC ROAD NIRMAN KARYA
GRAM SABHA ARAKHPUR ME PAHWARI BABA KE STHAN PAR VYAMSHALA KA NIRMAN KARYA
GRAM SABHA INDAUR ME PICH ROAD SE BECHU KE GHAR HOTE HUE OMPRAKASH RAM KE GHAR TAK INTERLOCKING NIRMAN KARYA
GRAM SABHA ARAKHPUR ME GATE MARMMAT KARYA
GRAM SABHA ARAKHPUR ME BHIMASHANAKR PATEL KE GHAR SE ANIL KE GHAR TAK MITTI KHANDJA NIRMAN KARYA