Loading…
Loading…
4,187 results • Latest
SUPPLY OF DOOR LEAF ASSEMBLY (DOOR LEAF, BOTTOM T SECTION, SIDE U SECTION, RUBBER V SECTION, FASTENERS) TO PART NO: IMSP0159-300 FOR IC DOOR OF M/S.PERFECT TECHNO FOR VANDE BHARAT TRAIN SET COACHES TH
Isolator package ISO 04 associated with Bulk procurement LOT 3 for Substation Equipment for implementation of Bay Extension work.
F, S, I OF 6.0M SMART PYLON UP, CONST OF FOUNDATION UP, F, S, I OF 6.0M SMART PYLON MP, CONST OF FOUNDATION MP, F, S, I OF 6.0M SMART PYLON CH, CONST OF FOUNDATION CH, F, S, I OF 6.0M SMART PYLON BR, CONST OF FOUNDATION BR, F, S, I OF 6.0M SMART PYLON OD, CONST OF FOUNDATION OD, F, S, I OF 6.0M SMART PYLON WB, CONST OF FOUNDATION WB, F, S, I OF 6.0M SMART PYLON JH, CONST OF FOUNDATION JH, F, S, I OF 6.0M SMART PYLON HP, CONST OF FOUNDATION HP, F, S, I OF 6.0M SMART PYLON UK, CONST OF FOUNDATION UK, F, S, I OF 6.0M SMART PYLON JK, CONST OF FOUNDATION JK, F, S, I OF 6.0M SMART PYLON 7040, CONST OF FOUNDATION 7040, F, S, I OF 6.0M SMART PYLON CG, CONST OF FOUNDATION CG, F, S, I OF 6.0M SMART PYLON PB, CONST OF FOUNDATION PB, F, S, I OF 6.0M SMART PYLON HR, CONST OF FOUNDATION HR, F, S, I OF 6.0M SMART PYLON DL, CONST OF FOUNDATION DL, F, S, I OF 6.0M SMART PYLON RJ, CONST OF FOUNDATION RJ, F, S, I OF 6.0M SMART PYLON AP, CONST OF FOUNDATION AP, F, S, I OF 6.0M SMART PYLON KL, CONST OF FOUNDATION KL, F, S, I OF 6.0M SMART PYLON TS, CONST OF FOUNDATION TS, F, S, I OF 6.0M SMART PYLON KA, CONST OF FOUNDATION KA, F, S, I OF 6.0M SMART PYLON TN, CONST OF FOUNDATION TN, F, S, I OF 6.0M SMART PYLON GA, CONST OF FOUNDATION GA, F, S, I OF 6.0M SMART PYLON MH, CONST OF FOUNDATION MH, F, S, I OF 6.0M SMART PYLON GJ, CONST OF FOUNDATION GJ
Liability Insurance Service - Indemnity insurance
Drilling, boring and installation of 02 nos tubewell by reverse rotary method In Block B2 and E in Sheetla colony ward 36 Div 3B ZONE 3 Under MCG. Re-call
Estimate for Upgrading water supply line to 250mm dia from Govt school booster UGT to Diversion point near school Gate and UGT repair in Village sarhaul. Re-call
Hiring of Tractor Mounted Pumps for dewatering Purpose during Monsoon Season for Year 2026 in areas of New Ward No. 01 under Division 3A MCG. Re-call
hp A4 and Legal Monochrome (Black) Laser Computer Printer Brand: hp (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687703884982 dt.18/05/2026)
Operation and maintenance of water booster as well as repair of water supply leakage for the month of April to Sept. in ward 5, under MCG.
construction of Revenue rasta in village Kherki Majra ward 6 under MCG.
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6957023 Dated : 04-12-2025 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 55000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 76 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/10 Beneficiary : ENGINEERS INDIA LIMITED Engineers India Limited, ENGINEERS INDIA Limited, ENGINEERS INDIA Limited, Ministry of Petroleum and Natural Gas (Engineers India Limited) UIN Number NCTGC2415P
Rejuvenation of Pond Near Shani Dev Mandir in Ullawas Ward No. 20 under MCG.Recall
EXCAVATION /B/WORK/STEEL //CCONCT//CPLASTER FLOORING/ DOOR /WINDOW FRAME/ WHITE WASH ETC (1st time for L and C Society only)
building (1st time for L and C Society only)
Building Work, Boundary wall and electric work
PROVIDING AND LAYING STP TREATED WATER SUPPLY DISTRIBUTION PIPE LINE,FOR VARIOUS PARKS IN C-Block Sushant Lok-I WARD NO. UNDER MCG.Recall
COOLING TOWER PACKAGE FOR TRINITROTOLUENE (TNT) PLANT AT HIGH EXPLOSIVES FACTORY (HEF) KHADKI OF M/S MUNITIONS INDIA LIMITED (MIL) AT KHADKI, PUNE, MAHARASHTRA
MISC. CIVIL AND STRUCTURAL WORKS FOR POLYPROPYLENE PROJECT-KOCHI REFINERY OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
Development of New Pocket-E in Sector-47, Gurugram complete in all respect. Hiring of suction jetting machine for cleaning of sewer and SWD line including man holes in District Shopping Centre, Sec-47, Gurugram and all other works contingent thereto
SPN/B933-011-JU-MR-6502/148 - SILENCER FOR Bina Petchem and Refinery Expansion Project (BPREP)
Providing and Laying of Pipe line (PHE Services) from ICAT to 66 KVA Sub Station, Sector-03, IMT Manesar
special repair of Ashiana Scheme flats 560 D/Us (Phase-I) in Sector-47, Gurugram. Cleaning of Site by Removing Wild Growth and Surface Levelling Clearance of Grass, Shrubs and Surface dressing of the ground including removing vegetation and inequali
Estimate for Storm Water Drain by Providing and Laying NP-3 Pipeline from Main Entry (GR Chowk) to Main Stand, Village Behrampur, Samrat Naagbhatt Gurjar Road, Ward No. 20, Division-4A, Zone-4 under MCG.
Hiring of Machinery for rainy season for ward no. 8 in division 2B under MCG.
PROVIDING AND LAYING STP TREATED WATER SUPPLY DISTRIBUTION PIPE LINE, FOR VARIOUS PARKS IN Ardee City WARD NO 21 UNDER MCG AREA.Recall
Punched Tape Concertina Coils - PTCC (V2) (Q3)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Service Charges for removal handling and shifting of existing LT 1/1 kVA grade PVC insulated aluminum Armoured single core 630 Sqmm power cables from the ..
SITC of CAN Based Data Logger Along with All Associated Accessories
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; HVAC, Repairing and modification of Supply Air grill ducting and gypsum ceiling in Ditya Auditorium; Service Provider
Laying of STP line for providing treated water in sector 57 parks under Ward 14 Horticulture wing, Municipal Corporation Gurugram.Recall
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable water purification system with inbuilt water cooler.; 1 Year; PACKAGE-4 : Water purifier and conditioning system maintenance involving basic servicing, f..
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Secondary School; Admin, Manpower Outsourcing Services - Minimum wage - Semi-skilled; High School; Others
Voltage Transformer - Dual purpose - Indoor (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7126883 Dated : 19-01-2026 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category Voltage Transformer - Dual purpose - Indoor Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 55460 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Flameproof LED Emergency Light (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7116434 Dated : 15-01-2026 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 119180 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) (3 (3 ))
Contactor Make- SCHNEIDER ELECTRIC, Puls Power Supply CP20.241 10A Make- PULS, Puls Power Supply CP20.240 20A Make- PULS, Multifunctional Safety Timer Make-Dold
Screw Compressor (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6944324 Dated : 28-11-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 441600 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Canon Inkjet Colour A4 and Legal Size Multifunction Printer (MFP) Brand: Canon (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687756627079 dt.20/05/2026)
hp OEM Toner Cartridge Manufactured by HP India Sales Private Limited Brand: hp (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687730002188 dt.21/05/2026)
hp OEM Toner Cartridge Manufactured by HP India Sales Private Limited Brand: hp (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687729126973 dt.21/05/2026)
Estimate for supply of Cast Iron Benches in Zone-III, Gurugram.
Estimate for renovation and beautification of Green Belt near CP Camp office, DC Residence, Divisional Commissioner Camp office including one year maintenance of plants in Civil Line under Zone-III, Gurugram.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Automotive Testing Centre; Electrical System or Installation; Service Provider
Plug and Socket Distribution Board (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7130347 Dated : 20-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Primary product category Plug and Socket Distribution Board Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 80877 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Customized AMC/CMC for Pre-owned Products - AMC Service for Air Compressors (Make Atlas Copco) Model ZT75 Serial Numbers PNA532070 and PNA532071(PAC); AMC Service for Air Compressors (Make Atlas Copco) Model ZT75 Serial Numbers PNA532070 and PNA53207..
Direct Evaporative Air Cooler (V2) ISI Marked To IS 3315 (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7160756 Dated : 28-01-2026 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 131170 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Monoblock Centrifugal Pump Make-Wilo Model-Wrox-406, Monoblock Centrifugal Pump Make-Wilo Model-MPM-0716, Monoblock Centrifugal Pump Make-Willow Model-MPM-1019
KIT FUEL FILTER AND RING, SEAL O RING, ELEMENT LUB OIL FILTER, INHIBITOR, CORROSION 205 LTRS, VALVOLINE PREMIUM BLUE 7800 PLUS, KIT SUPER BYP FILTER ELEM, ELEMENT CRN RESISTOR, COOLANT EG 5050 PREMIXED 50 LT DRUM
Providing and fixing of speed breaker in Ward No. 4, Division 3A under MCG.
Providing and laying of RCC NP-3 900mm dia Storm water drain from Rezangla road to Vyapar Kendra Market (Dividing road BLOCK- AB and EF) and further up to Bajghera Railway Flyover (Dividing Road block- C and D) in Ward no. 4, Division 3A under MCG.