Loading…
Loading…
1,396 results • Latest
Renewal of Kachhauna Hathauda Road to Suthena Link Road
Renewal of Kachhauna Gausganj to Madhiya Link Road
Renewal of Govindpur Link Road
Renewal of Gaju Link Road
Patch repair work on rural roads under block Tadiyawan in Hardoi district for the financial year 2026-27
Ward 10 Mohalla kasupet me munnulal kushwaha ke makan se Puliya tak CC road v Nali Nirman karya
Ward 23 me kadri masjid se Bablu ke makan tak CC road v Nali Nirman karya
Ward 12 Chotalle ke makan se Sarik ke makan tak CC road v Nali Nirman karya
Silt clearance of Kuwarpur drain from Km. 0.000 to Km 6.630 in District Hardoi (Lot-08)
Silt clearance of Randena drain from Km. 0.000 to Km 5.230 in District Hardoi (Lot-06)
Janpad hardoi me ramganga nadi ke baye kinare pr sthit sanvedanshil gram baran avam tapuapur me katav nirodhak karya
Silt clearance of Devpur Veersinghpur drain from Km. 0.000 to Km 6.500 in District Hardoi (Lot-05)
Silt clearance of Pindari drain from Km. 0.000 to Km 5.630 in District Hardoi (Lot-04)
Silt clearance of Rawal Daiversion drain from Km. 0.000 to Km 4.320 in District Hardoi (Lot-03)
Silt clearance of Brijlalpurwa drain from Km. 0.000 to Km 4.820 in District Hardoi (Lot-02)
Silt clearance of Abdullanagar drain from Km. 0.000 to Km 4.100 in District Hardoi (Lot-01)
Renewal with General Repair in Km-1, 2(300) of Mattipur road Km-01 to Jagatpur link road
Renewal with General Repair of Sawayajpur to Madnapur link road in Km-1 to 4(210)
Fireclay Bricks (RINL) (Q3)
River Bed Sand (Q3), Ordinary Portland Cement (V3) Confirming to IS 269 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
River Bed Sand (Q3), Ordinary Portland Cement (V3) Confirming to IS 269 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Ordinary Portland Cement (V3) Confirming to IS 269 (Q3), River Bed Sand (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
River Bed Sand (Q3), Ordinary Portland Cement (V3) Confirming to IS 269 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Patch repair work on rural roads under block Pihani in Hardoi district for the financial year 2026-27
Patch repair work on rural roads under Hariyawan block in Hardoi district for the financial year 2026-27
Renewal with BC of Hardoi Bawan Sawayajpur road (SH-29A) in Km-22 to 32
Hay Grass (Loose and Bundle) (Q3) (3 (3 ))
LED Luminaire For Road And Street Lights Conforming To IS
Fireclay Bricks (RINL) (Q3)
Fireclay Bricks (RINL) (Q3)
Fireclay Bricks (RINL) (Q3)
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin, Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Semi- skilled; Secondary School; Others, Manpower Outsourcing Services - Minimum wage - Semi-skilled; Secondary School; Admin, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Truck Mounted Boom Lift Platform (Q2)
Ration Kit (Q4)
Ration Kit (Q4)
Facility Management Services - LumpSum Based - Supply of Stationery, Cleaning and Electrical Consumable Items; Cleaning and Electrical Consumable Items; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - Supply of Whitewashing and Cleaning Materials for District Jail Hardoi; Cleaning Materials; Consumables to be provided by service provider (inclusive in contract cost)
Engine Monoset Pumps for Clear, Cold, Water (Dewatering Pump) Conforming To IS 11501 (Q3), Power sprayer (Q3) (3 (3 ))
Television (V3) (Q2)
Single Use Sterile Rubber Surgical Gloves Conforming to IS 13422 (Q2), Single Use Medical Examination Gloves Conforming to IS 15354 (Part 1) (Q2) (3 (3 ))
Construction work of 7x5 M Span RCC Box Culvert on Sukhta Nala in Km-4 of Chimna Nasauli Damar road in District Hardoi in F.Y. 2025-26
Patch repair work on rural roads under Kothawan block in Hardoi district for the financial year 2026-27
Sandila to Masit Link Road
Other Works including Internal Electrification in the Swami Vivekananda Auditorium located in the Collectorate Campus of Hardoi
Pihani Gopamau Road to Daulatpur Link Road
Renewal of GMM Road to Mushtafabad Link Road
Renewal of Beriya Puranmau to Lonar Durgapurwa Link Road
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Furniture; Service Provider