Loading…
Loading…
2,984 results • Latest
Const. of New Pump Chamber , Pumping machinery and balance distribution system
AUGMENTATION OF WATER SUPPLY SCHEME AND LAYING OF DISTRIBUTION SYSTEM IN VILLAGE DHARAM KHERI
Renovation of water water supply scheme village Bhatla Distt. Hisar Under NABARAD
Kirtan DNIT for Laying of DI pipeline in place of old AC PVC Pipeline in village Kirtan Distt Hisar
SPL REPAIR LOW TENSION PANEL IN OTM AND MD ACCN IN EASTERN AREA OF HISAR MILITARY STATION UNDER GE HISAR
SPL REPAIR TO BLDG NO TL-70, 07 X OTHER SINGLE TOILET AND URINAL BLOCKS AND VEH RAMP OF 433 FD HOSP UNDER GE (EAST) AT MIL STN HISAR
REPAIRS AND RE-CANNING WORK OF WOODEN/STEEL CHAIRS AND REPAIRS OF VARIOUS TYPE OF SOFA SETS AND ITS UPHOLSTERY WORK IN THE AOR OF GE HISAR AT HISAR MIL STN
Unbranded 100cm X 60cm Decorative Coir Mats Brand: NA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687784348620 dt.09/07/2026)
PROVN OF CHAIN LINK FENCE OF MANEKSHAW AND TARAPORE ENCLAVE AT HISAR MIL STN
REPAIR/MAINTENANCE TO HARD BEDS AND CHARPOYS IN THE AOR OF GE HISAR AT HISAR MIL STN
Const. of headworks structures, Pipe lines and Pumping machinery
Construction of Lift Well in New 6 No. Court Building in Judicial Court Complex at Sirsa . (Pdg. 1 No. 13 passengers lift only ) RECALL
Construction of new road from Satrod Khurd Dabra road to Southern Bye Pass along Dead Dabra Minor in Hisar District (Km 1.320) (Pdg. Shifting of HT/LT Lines only)
Insurance of movable combustible and non combustible stock inventory on behalf of DHBVN from general insurance companies registered with IRDA for fire insurance including STFI Coverage
Requirement of Electrical Items in Central Store (E) at CCSHAU, Hisar
Operation Mtc/ repair pipe line network, Consumable and Pumping machinery etc.
Laying of Sewer line
Construction of 1 No. RCC S.S. tank, Distribution system, FHT Connection 460 Nos. and Restoration of water connection,Boundary wall 82mtr.,Earth filling RCC Tank and Exist Pond.
Requirement of Electrical Items in Central Store (E) at CCSHAU, Hisar (re-invited)
Barwala Town DPR for Laying of 560 mm OD HDPE Rising main from existing Pond to flowing near village Ghirai for disposal of treated effluent from 2 No. Sewage Treatment Plants of Barwala, Hisar
Interactive Panels with CPU (Q2)
PROVN OF SWITCH GEAR SPL REPAIR TO VCB HT CABLE AND CONNECTED WORKS UNDER GE HISAR
ASSY HVAC UNIT Manual Control, Assy AC Compressor SP 17 Single, Winding Starter Generator Field, Armature Motor, Part Kit Steering Gear, Input Shaft Cover
High Mast Lighting Octagonal Tower With Solar Based LED
Rough Cost Estimate for Rejuvenation of Internal Water Supply lines in Sector-13P, Hisar
central pivot system
Arc Flash Suit Kit (Q2)
Estimate for lining of W/C At Outlet RD 24780/L Kapro Minor (Extension)
Estimate for Remodeling/Rehabilitation of lining of watercourse at outlet RD 22950/R Modakhera Minor (UGPL)
Feeder Cable (RG cable)
FIST Microphone suitable for Motorola make 25Watt VHF
GP Antenna 6db for 25watt VHF sets
UAV Bottom Arm, Power Board, Top Case, Propeller
consturction of toilet
Forestry works
Forestry works
Forestry works
Forestry work
onstruction of 50 bedded to 100 Bedded Hospital at Narnaund in Distt. Hisar (Pdg. Extension of Existing feeder of CHC Narnaund for newly constructed Hospital Building at Narnaund in Distt. Hansi)
Operation Mtc/ repair pipe line network, Consumable and Pumping machinery etc.
CONSTRUCTION OF SHED, ROOM AND PARKING WITH CC and IPB AT MRF SITE NEAR MG CLUB MC HISAR
DETAILED ESTIMATE FOR ROUGH COST ESTIMATE FOR DEVELOPMENT OF LANDSCAPE WORK IN THE PARK ADJOINING RAVI DASS DHARMARTH SABHA/ RELIGIOUS BUILDING IN SECTOR - 33 P-I, HISAR
RE-CONSTRUCTION OF BOUNDARY WALL OF FIROJ GANDHI MEMORIAL GOVT. COLLEGE AT MANDI ADAMPUR IN DISTT. HISAR.
Linear Low Density Polyethylene (LLDPE) Film (V3) Conforming to IS 14500 (Q3)
SPECIAL REPAIR HOSTEL OF HARYANA TRAINERS TRAINING INSTITUTE AT HISAR
CA NO GE (W)/HSR-31/2026-27 ADDN/ALTN TO BLDG NO P-570 AND T-388 AT HISAR MIL STN UNDER GE (W) HISAR
Linear Low Density Polyethylene (LLDPE) Film (V3) Conforming to IS 14500 (Q3)
Circuit Breaker, Hydraulic Aggregate, Hydraulic Cyl Ram Assy, Gear Pump Wiper Motor Sprinkle, Spider Bearing, Slave Cyl Clutch