Loading…
Loading…
6,712 results • Latest
TUBEWELL
CONSTRUCTION OF PUCCA DRAIN WITH COVER AND FILTER CHEMBER FROM THE HOUSE OF BINOY GHOSH TO GARDEN OF GOPAL CHATTERJEE AT BIGHATI VIII
Monthly Basis Cab & Taxi Hiring Services - SUV; 1200 km x 208 hours; Local 24*7
INSTALLATION OF SUMMERSIBLE PUMP WITH WATER TANK
INSTALLATION OF SUMMERSIBLE PUMP WITH WATER TANK
INSTALLATION OF SUMMERSIBLE PUMP WITH WATER TANK
CONSTRUCTION OF JALASATRA (STAND ALONE)
CONSTRUCTION OF JALASATRA (STAND ALONE)
INSTALLATION OF SUMMERSIBLE PUMP WITH WATER TANK
INSTALLATION OF SUMMERSIBLE PUMP WITH WATER TANK
Construction of Cycle Stand
Construction of Cycle Stand
SUPPLY OF HEIFER
CC PUCCA DRAIN WITH COVER FROM PRASANTA PAKHIRA HOUSE TO AMAL DUTTA GARDEN AT SANSAD NO V UNDER ANANDANAGAR GRAM PANCHAYET
CC pucca drain with cover from nemai majhi gardento end of Pijus manna at sansed X under Anandanagar Gram Panchayat under Singur Dev. Block, Singur, Hooghly.
Construction of concrete road from Kalipada Pramanick house to Sanjoy Ojha house at San XIII under Anandanagar gram panchayet
Construction of concrete road from Habaspota Monsatola to Kalipodo Mondal house San xII under Anandanagar gram panchayet
Construction of concrete road from Sukdeb Bhowmick house to Tarun Bhowmik house at San II under Anandanagar gram panchayet
Construction of concrete road from Surojit Sanki to kabita sanki at San x under Anandanagar Gram Panchayet
C C PUCCA DRAIN WITH COVER FROM SHANKAR PAL HOUSE TO END OF KUNDI NADI AT SANSAD NO VIII UNDER ANANDANAGAR GRAM PANCHAYET
C C PUCCA DRAIN WITH COVER FROM MANSATALA TO KHALDHAR AT SANSAD NO VII UNDER ANANDANAGAR GRAM PANCHAYET
Construction of concrete road from Prafulla samanta house to Biswanath samanta at San Ix under Anandanagar Gram Panchayet
Supply delivery Erection Commission of 2 No 9 Mtr..octagonal High Mast Tower 6x150 Watt LED Light System with Dyal Channel 24 hrTwilight Time Operation near Atpala Manasatala Primary School under Jayer Dwarbasini Gram Panchayat
Jagatpur-Dharampota Road within Ch. 1.00 Km to 2.00 Km, 3.10 Km to 7.30 Km to 7.30 Km, 7.45 Km to 10.15 Km, and 10.30 Km---- Surfacing work under Hooghly Construction Sub-Division-II, P.W.Dte under Hooghly Construction Division, P.W.Dte during the ye
Construction of community centers and Community Halls
Repair/Renovation of Anganwadi centres damaged by Amphan Super Cyclone at Malipukur Awc under Arambagh Dev Block Awc Code 19338010111
Instllation Of 40NosStreet Light With Post at Booth no 203 Under BHANJIPUR GP
FRP Louver Shutter for MEMU Assembly for 3 feet windows to ICF Drg. No. ICF/SK-5-4-197, Item no 1 to 17, alt. 'b'.
Road repair from Shyam mannas house to bagh pukur at Pandugram under Madhabpur GP
Construction of submersible pipeline at Dolui Para, Pandugram (1200) under Madhabpur GP
Construction of PCC road from Palash Ray house to Ashok hazra house at Pandugram under Madhabpur GP
REPAIR OF HIGH MAST LED LIGHT (5 PIECE) AT BOOTH NO. 187 UNDER MADHABPUR GP
Construction of Gurd Wall in front of and Back side of Bridge under Madhabpur GP
INSTALLATION OF HIGH MAST LIGHT AT TALSAR UNDER MADHABPUR GP
REPAIR OF ROAD FROM CHANCHAK KAROL PARA TO SONAGACHI UNDER MADHABPUR GP
REPAIR OF DRAIN AT CHANDCHAK UNDER MADHABPUR GP
Replacement of all window with Aluminium windows at Old SDH building , Project ID HF252643866S000
Emergent temporary Flood Damage Restoration works at shoulder and flank portion at Ch. 21.47 km to 21.50 km (Left side) and Ch. 17.20 km to 17.225 km (Left side) on Jagatpur-Dharampota Road by 150 mm dia Eucalyptus Bullah pilling with gunny bag filli
Emergent temporary Flood Damage Restoration works at shoulder and flank portion at Ch. 16.20 km to 16.278 km (Left side) on Jagatpur-Dharampota Road by 150 mm dia Eucalyptus Bullah pilling with gunny bag filling including barricading under Hooghly Co
Cross Regulator cum Bridge over South Saraswati at Ch. 222.80 at Ugardaha Ashramtala G.P. Baruipara Block Singur Dist. Hooghly.
Construction of pond side Fencing in front of the H O Arnab Banerjee at Barasat Banerjeepara at Booth no 154 in ward no 21 under CMCAPAS
Patch repairing work on Singur Trauma Care Centre road from Ch. 0.00 km to 0.90 km (In stretches) by providing WBM, Premix Surfacing an Seal Coat (Type-B) under Hooghly Construction Sub Division No.-III, P.W.D under Hooghly Construction Division, P.W
Shifting of existing 11 KV HTOH line (Bholanath, Tarakeswar Feeder emanating from Tarakeswar 132/33/11 KV Sub Station) by micro tunneling method with 11 KV 3cx300 sq mm XLPE UG Cable at Tarakeswar Station area under Tarakeswar Division.
Renovation of drain beside the house of Paritosh Sarkar in Dulepara Main Road Ward No. 19 Booth No127 under CMC APAS
Construction of pucca drain from the house of Samaresh Mondal to the house of Samar Malakar at 1No Niranjannagar at Booth No126 in Ward No19
CONSTRUCTION OF C C ROAD FROM MUNSHI PARA SADAR TO NEW MASJID UNDER NATIBPUR-II G.P BOOTH NO.249
Renovation of roof of Jugipukur Primary School at Debnathpally at Booth No134Ward No19 under CMC APAS
Emergent Repairing work at Bikrampur to Pandugram Road From Ch. 8.15 kmp to Ch. 8.80 Kmp under Hooghly Construction Sub-Division No-I,P.W.D. under Hooghly Construction Division P.W.D for the year 2025-2026.
INSTALLATION OF HIGH MAST LIGHT NEAR DAKSHIN PARA MANSHA MANDIR UNDER NATIBPUR-II G.P BOOTH NO.252
Construction of concrete road and drain from the ho Sheikh Bhulu to the ho Sk Rezzak at Bilkuli Kathuriyapara booth no 68 in ward no 30 under CMC APAS