Loading…
Loading…
6,712 results • Latest
INSTALLATION OF HIGH MAST LIGHT NEAR BARKHANTALA MASJID UNDER NATIBPUR-II G.P BOOTH NO.251
Construction of concrete road and drain from the ho Ambiya to the ho Nazir Gaji at Bilkuli Kathuriyapara booth no 68 in ward no 30 under CMC APAS
CONSTRUCTION OF CONCRETE ROAD FROM MADHABPUR BUS STOP TO HOOGHLY DISTRICT CENTRAL CO OPERATIVE BANK
Construction of road and drain from the ho Haradhan Mal to the bridge of Saraswati river at Bilkuli Dakshinpara booth no 68 in ward no 30 under CMC APAS
33KV UG Cable Laying Work (1.777 KM) For New 33KV Feeder From JANGIPARA 132/33/11 KV Sub Station to SEAKHALA 33/11 KV Sub Station Under Tarakeswar Division
Const of concrete road from Hariharbati Pry school bridge to jagabandhu danh house
CONSTRUCTION OF C C ROAD FROM ARABINDA SAMANTA S HOUSE TO RUPCHAND SAMANTA S HOUSE UNDER NATIBPUR II G.P BOOTH NO.253
Portable battery-operated CIRCUIT BREAKER TIME INTERVAL meter suitable for 3 pole, 220 KV circuit breaker
Supply, delivery, Erection Commission of 2 No 9 Mtr..octagonal High Mast Tower 6x150 Watt LED Light System with Dyal Channel 24 hrTwilight Time Operation at Alasin Kankarpara 23 no bus Root Near Allahabad bank under Jayer Dwarbasini Gram Panchayat
CONSTRUCTION OF CC ROAD FROM HOUSE OF BHUTAN ROY TOWARDS HIMU ROY HOUSE SANSAD VII
onstruction of drain from the ho Md Jabbar to the ho Kalu Rajmistry at Bilkuli Natunpara booth no 69 in ward no 30 under CMC APAS
Construction of drain from the ho Md Samad to the ho Nashim Khatun at Bilkuli Natunpara Majarer Road booth no 69 in ward no 30 under CMC APAS
Construction of concrete road and drain near the ho Dedar Box to Sk. Sofik at Bilkuli Suknagar area booth no 68 in ward no 30 under CMC APAS
Emergent Repairing work at Bikrampur to Pandugram Road From Ch. 2.60 kmp to Ch. 3.11 Kmp under Hooghly Construction Sub-Division No-I, P.W.D. under Hooghly Construction Division P.W.D for the year 2025-2026.
Construction of pucca drain from the back side of the ho Samir Santra upto the ho Joydeb Mondal at Nandalal Bhor Bye Lane booth no 93 in ward no 13 CMC APAS
Installation of High Mast Light near Dwari shop Barobaba Mandir at Radhakrishnapur under Rajhati I G.P within Khanakul-II P.S Code.116431857
Construction of road protection wall in front of the ho Joyna Sur at Kalitala Booth No 71 in ward no 29 under CMC APAS
Installation of High Mast Light at Jayrampur Market area under Natibpur I G.P within Khanakul-II P.S Code. 116432770
Installation of High Mast Light at Senhat Kali Mandir beside BDO under Rajhati-I G.P within Khanakul II P.S Code. 116430705
Lowering the base and renovation of a pucca drain from 59 no pole to the ho Jyotish Chandra Das for proper drainage, construction of another drain by the side below the pole and construction of cross drain over them Booth No 71 in ward no 29 under CM
Supply of soil ameliorant- Dolomite, CaCo3.MgCo3 for reclamation of acid soil through dolomite application. Each Packet size should be 25kg. Scheme Soil Health and Fertility under RKVY 2026-2027
Construction of road protection wall near the ho Prasanta Dhara at Nabagram Paschimpara Main Road Booth No 72 in ward no 29 under CMC APAS
Supply of Micronutrients- Zn-EDTA, Zn-12 Percent Foliar Spray at different blocks of Hooghly District. Each Packet size should be 100gm. Scheme Aromatic Rice under RKVY 2026-2027 and SDS 2026-27 and Soil Health and Fertility under RKVY 2026-2027
Supply of IPM including mechanical control- Azadirachtin 10,000 ppm at different blocks of Hooghly District. Each Packet size should be 100ml. Scheme Aromatic Rice under RKVY 2026-2027
Construction of drain and road from J C Khan Road to the ho Shyam Sundor at Bazra booth no 73 in ward no 29 under CMC APAS
Emergent Repairing work at Bikrampur to Pandugram Road From Ch. 0.00 kmp to Ch. 1.17 Kmp under Hooghly Construction Sub-Division No-I, P.W.D. under Hooghly Construction Division P.W.D for the year 2025-2026.
Renovation of drain increase the height of drain level from the Kali Mandir to the house of Tila Saha at Debnathpally, Ward No. 19 Booth No 134 under CMC APAS
Construction of road and drain from the house of Raja Kuri to the house of Pulak Pal at Shantinagar Ward No 19 Booth No128 under CMC APAS
CONSTRUCTION OF CONCRETE ROAD FROM NURU LAND TO GAFFAR HOUSE WITHIN BHANDERHATI-I GP AREA UNDER DHANIAKHALI BLOCK
Installation of High Mast Light at Bundhpara Mansatala Nandanpur under Jagatpur G.P within Khanakul II P.S Code. 116422806
Dressing and Chilchalling along with kutcha drain cutting at road flank at ch. from 12.00 km to 24.60 km of Jgatpur-Dharampota Road under Hooghly Construction Sub-Division-II, PWD, Arambagh under Hooghly Construction Division, PWD during the year 202
Construction of pucca drain from the house of Arati Mondal upto the house of Anima Rakshit at Sabinara Ward No 19 Booth No 134 under CMC APAS
Construction of drain from the house of Sailen Pramanick to the house of Prabir Dey at Sabinara Bye Lane Ward No 19 Booth No 134 under CMC APAS
Construction of railing or guard wall beside the pond of Congressnagar area booth no 128 in ward no 19 under CMC APAS
Repairing and Rewinding of 3 nos non-clog submersible pump-motor set, SF of 32A, 415V TPN SFU, HRC Fuse, SF of 36-watt street light and Servicing of NRV, Sluice Valve and Other Allied Works of Sewage Water Pumping Station at MPS-II, LS-I, LS-II
Installation of High Mast Light at Jagatpur Bakultala Shitala Mandir under Jagatpur G.P within Khanakul II P.S Code.116406794
Construction of paved road beside Tapan Da Chop Shop at K. B. C. Bye Lane, Ward No.- 17, Booth No. 117
Renovation of pucca drain from the house of Shyamal Seal upto the house of Barun Chatterjee at K.B.C. Road, Ward No. 17, Booth No. 117
Renovation of drain starting from the house of Saras Sadhukhan via house of Dr Arindam Seth to the HO Arun Nandi at Hatkhola, Muktarpara at Booth No. 119 Ward No.17
Renovation of drain with slab at Daerdhar Saheb Ghat Goli at vBooth No. 119 in Ward No.17
Renovation of drain from Boser Ghat Chalkepara to the house of Tilak Kumar Dutta at Booth No. 119 in Ward No. 17
Construction of drain from the old age home HO Ashis Kumarto the HO Basudeb Sadhukhan at Muktarpara at Booth No.119 in Ward No. 17
Energy Audit Service - Lumpsum Based - Detailed; Industry, Industrial unit
Renovation of drain in front of the house of Asit Pal at Rabindranath Road Besohata, Ward No. 17, Booth No. 118
Renovation of drain with slabsstarting from the house of Lt. Nilmoni Bannerjee via house of Rajib Dey upto the house of Pradip Dey and Santanu Mondal(upto Sanat Chakraborty) at Manasatala Bye-lane
SINKING OF SUBMERSIBLE PUMP NEAR KUNDU PARA UNDER NATIBPUR II GP Booth No 255
Construction of new drain from the house of Rabindranath Ghosal upto the house of Shyam Sundar Dutta at Manasatala Bye Lane, Ward No. 17, Booth No. 117
Construction of (Type-A) Building less SHC-HWC (AAM) at Bishnupur, Sagar Block under DHHD.
Repair and renovation of boundary wall at Bhadur Beat, Rangamati Outpost and Chandur Beat of Arambagh Range under Howrah Division
Construction of road protection wall from the house of Kesto Oraon to the house of Nemai Koley at Munsipukur area Booth no 35 in Ward no 02 under CMC APAS