Loading…
Loading…
14,383 results • Latest
DIRT COLLECTOR COMPLETE FOR BLCS WAGON TO DRAWING NO. WD-92051-S-03, ALT.No. 5 OR LATEST AND CONFORMING TO RDSO SPECIFICATION WD-02-ABR-02, APPENDIX - E WITH AMENDMENT NO.4 OF SEP 2016 OR LATEST. Firm
Supply,installation & commissioning of EOT Crane Capacity 10 Ton
Pin Cotter for Secondary Brake Beam (BMBS). as per Drg.No. Sketch no. PPBIA/BMBS/18/01 specn: Material & Specification as per Sketch. Accepted Make: SKI
SUPPLY OF ILLUMINATED PUSH BUTTON
Tip Up Seats, Part No: VB/TS/59,
PWC HORIZONTAL LINK ASSLY FOR EXECUTIVE [PWC HORIZONTAL LINK ASSLY FOR EXECUTIVE SEAT OF VANDE BHARAT TRAIN, MAKE-PINNACLE INDUSTRIES (PartNo- R001030740082)]
Deselting of Drain1)200 Netaji Subhas Road (Gourio Math Petrol Pump) to 110/1/B Netaji Subhas Road(Kali kundu Lane Petrol Pump) 2)126/1 Narasingha Dutta Road(Power House) to 126/1 Netaji Subhas Road (Samashree More),3)201 Netaji Subhash Road( The Rem
Restoration of wooden bridge over maja Damodar at Hariharpur for a length of 22.30 m in G.P.-Kurchi Shibpur, Block-Udaynarayanpur, Howrah
Restoration of Baichi Jalapara Wooden Bridge over Patkelghata khal for a length of 16.5 M in G.P.-Kharuberia, Block-Shyampur-II, P.S.-Shyampur, District-Howrah
Emergent Repair and Restoration damaged Protection work on Right Bank of Mahisdhara Khal near the outfall into River Hooghly, adjacent to Radha Krishna Mandir, G.P. Jorhat, Block and P.S. Sankrail, Howrah
Emergent Repair to the bank protection work on the right bank of river Hooghly adjacent to Shree Bauria Gaudiya Ashram within ward no 10 of Uluberia Municipality PS Bauria Dist-Howrah
Conforming To IS10322 (Part5/Section2) (V4) (Under BISScheme-II) (Q2)
Dismantling of OHR (Capacity 125000 Gallons or 473125 Ltr.) at Head work Site of Udaynarayanpur Zone-1, 2 Water Supply Scheme within Udaynarayanpur Block under Howrah Division, P.H.E. Dte.
Alternative laying of distribution pipe line for Proper water supply at village Rangmahal Kha Para within the commond area of Amritsal Pipe water supply scheme of Uluberia-I Block under uluberia Sub-Division Under Howrah Division. PHE Dte.
Electrical (general) work in connection with "Replacement of Old & overage Panel Interlocking station to EI at Belur Station."
INSTALLATION OF SUBMERSIBLE PUMP AT MIRGRAM DARSHA KORANIYA MADRASA ACTIVITY ID -109664463- 25-26 SL NO -15 THEME-4
Overhauling ,testing of Fire fighting system at Commercial Taxes Building G 7 storied building at 7 1 Mackenzie Lane, Howrah, during the year 2026 27.
117734936_Construction of Panchayat Samity Bhavan Phase II
Clearing and removing of water hyacinth of Rajapur Branch Khal - I and II for a total length of 7.0 km for the period of 365 days during the year 2026 - 2027 in Block and P.S. - Jagatballavpur and Domjur, Dist- Howrah
REPAIR OF DOORS WINDOWS GATE FIXTURE OF 15 NOS ICDS CENTRE AND 5 NOS PRIMARY SCHOOL UNDER ORPHULI GRAM PANCHAYET (Activity Code 109309162 )
Clearing and removing of water hyacinth of Saraswati River from Jelepara to Khutir Pole for a length of 6.50 km for the period of 365 days during the year 2026 - 2027 in Block and P.S. - Domjur, Dist-Howrah
Custom Bid for Services - E Tender for miscellaneous work of duct chamber cleaning repairing raising duct continuity checking etc and OFC cable pulling with associated works in Kolkata Telephones District Similar Category Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network
Clearing and removing of water hyacinth from Gurer Khal of length 4.50 Km and Sutir Khal -I of length 1.00 Km for the period of 365 Days, during the year 2026-27 in Block- Panchla, Dist. - Howrah
Clearing and removing of Water hyacinth of Rajapur Main Khal from 10.00 km to 28.00 km and Kamarnala Khal for a length of 2.8 km for the period 365 days during the year 2026-27 in Block and P.S.-Panchla and Jagatballavpur ,District-Howrah
CONSTRUCTION OF CONCRETE DRAIN FROM NH6 TO HAFIJUL HOUSE AT UTTAR CHAKKAMALA VILLAGE. (Activity Code 109352024 )
Clearing and removing of water hyacinth in between Telihati R.C.C. Bridge to Budul RCC bridge of Kana Damodar River for a length of 27.50 km for the period of 365 days during the year 2026-27 in Block and P.S. - Jagatballavpur and Panchla
Clearing and removing of water hyacinth including clearing of Jungles along the slope of bank for the period of 365 days from out fall point of Sluice (0.00 m) to 800.00 m of Sarnamoyee Khal under Howrah Drainage Sub-Division
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank for the period of 365 days from Satyen Bose Road bridge(Ch-0.00 Km) to Khatir Pole(Ch-6.00 Km) of River South Saraswati
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank for the period of 365 days from Ch. 0.00 m to 5130.00 m of Mahishdhara Khal under Howrah Drainage Sub-Division
Construction of ABR for 1500 HHs at Pairatungi Khanpara Belelpara, under Makardah II GP under Domjur Panchayat Samity Domjur Howrah
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank for the period of 365 days from 0.00 Km to 2.20 Km of Branch -VI of Howrah Drainage Channel
Clearing and removing of water hyacinth for the period 365 Days for the length 10.350 Km of Borjola Khal under Howrah Drainage Sub-Division of Lower Damodar construction Division during the year 2026-27
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 1885 m of Nayabaz R.C.C. U trough Drain for the period of 365 days under Bankra II and III G.P
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 2390.0 m of Branch Channel III for the period of 365 days under Chawakpara-Anandanagar G.P.
Desiltation of Howrah Drainage Channel from 4.0Km to 12.5 KM within Bally Jagacha and Domjur Block, P.S. Nischinda, Domjur and Jagacha , District Howrah.
CONSTRUCTION OF CONCRETE ROAD FROM SUILISH GATE TO MOBARAK ALI HOUSE AT DILALPUR VILLAGE. ( Activity Code 109353445 )
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 1600.0 m of Branch channel -I for the period of 365 days under Jagadishpur G.P , Block - Bally-Jagach
Clearing and removing of water hyacinth and solid / semi solid compact mass ,plastic , thermocol , garbage etc. from ch.0.00 m to 890 m of Bultigri Khal-II and ch.0.00 m to 1454 m of Bultigri Khal-I for the period of 365 days , Bankra -II G.P
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 1600.0 m of Branch Channel-II for the period of 365 days ,under Chawakpara-Anandanagar G.P
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.7200.0 m to 12500.0 m of Howrah Drainage Channel for the period of 365 days , Bankra-II G.P , Chamrail
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.3000.0 m to 7200.0 m of Howrah Drainage Channel for the period of 365 days, Bankra -II G.P
Set of Control Arm assembly left etc.
Tab/Cap Eltrombopag Olamine 50 mg [Product should be available in the Manufacturing firm's approved product list of Railway Board] - (Sl. No.: 1065). AI 2026-2027
Inj. Brolucizumab 120 mg/ml ( Vial+ Filter Needle)
Comprehensive Maintenance Contract of GM Passenger Lift ( Make - Thyssenkrupp ) located in GM Block at Head Quarter,Fairlie Place Kolkata for 60 Months.
Electrical (General) work in connection with "Construction of New Store Depot at TKPR Coaching Yard".
Electrical (General) work in connection with Repairing of LHS by provision of cross drain, hump, de-silting of drain & reservoir, grouting, construction of pump house & other ancillary work of LHS No. 6/2, 7/3, 7/4, 8/2, 13, 15A, 17/1 etc. in the jurisdiction of SSE/W/NDAE under AEN/NDAE.
Provision of passenger lifts at HWH, DKAE, TAK & SNT over Howrah Division.
Electrical (General) work in connection with "Provision of new sump, pump house, pump cover shed & drainage arrangement at LHS no. 279/A & 286A in the jurisdiction of AEN/AZ and at LHS no. 7C/E in the jurisdiction of AEN/KWAE".
Annual Maintenance Contract of 04 Nos. EOT Crane at Diesel Shed, Eastern Railway, Howrah For 02 (Two) Years.