Loading…
Loading…
2,493 results • Latest
Erattayar GP Ezhukumvayal PHC Subcentre Maintanance Ward 05 2025 Proj No 220 26
Purchase of Fibre Optic Laryngoscope
ERATTAYAR GP 2025 26 KURISHUMALAPADY DWSS WARD 10 PROJECT NO 74 RE TENDER
Maintenance of Govt U P School
Annual Plan-Mdkm 2025-26 Proj No. 150/26 Benchaminpadi Plantation road Re concreting in ward 7-Mundakayam GP-General Civil Work
VAZHAVARA CHEMBAKAPPARA DWSS Completion Proj 77/25 26 ERATTAYAR GP 2025-2026 WARD 11 RE TENDER
THIMMAL ANGANWADI ROAD CONCRETING PHASE 2
NAALUMUKK NELLIPPARA MANIYAMBRAPADY DWSS
Construction of road to Kiliyara Venappara flat
IDINJAMALA MANIKKADA DWSS
Purchase of Digital Spirometer
Annual Plan TAKE A BREAK COMPLETION WORKS 2025 26project no 054 26
CLEARING TOUCHING AND OVERHANGING OF TREES, LIGHT JUNGLES, REMOVING VEGETATION GROWTH ETC OF THE 220 KV PALLIVASAL - UDUMALPET (2PVUD) FEEDER
HEAVY DUTY HIGH VOLUME LINE MOUNT TYPE OXYGEN REGULATOR
HEAVY DUTY HIGH VOLUME LINE MOUNT TYPE A [HEAVY DUTY HIGH VOLUME LINE MOUNT TYPE ACETYLENE REGULATOR FOR MACHINE CUTTING TORCH WITH DELIVERY 2 TO 15 PSIG OR 1.5 BAR MAX AND INLET/ OUTLET PORTS TO SIZE 1/2" NPT OR 1/4" NPT FEMALE THREADS TO MODEL NO L710A-500 OF M/S.VICTOR OR 847-1.5-AC OF M/S.HARRIS.]
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) (3 (3 ))
Annual Plan Kattappana Municipality -765/26-Balance work-Completion of Roofing Work at New Bus Stand-General Civil Work
GENERAL-kattappana municipality 2024-25 kurisumala dws anubandha soukryam orukkal ward 3 (113/25)-General Civil Work
Kattappana municipality 2024-25 kavumkalpadi dws maintanance sneha sadan padi kulathinu vala idal ward 22 (289/25)
Annual Plan IDP 2025 26 VELLIYAMATTOM GP CONSTRUCTION OF SJ NATIONAL LIBRARARY HALL VELLIYAMATTOM GP 260 26 General Civil Work
RETENDER -KATTAPPANA MUNICIPPALITY ANUAL PLAN 2024-25 Kalyanathandu DWS Tank Cover Installation(724/25)
The proposed road is in ward 06 in Kanchiyar GP. Total length of road from Johny Kada Palam to end of road is 1.300 km. In this estimate proposed Re tarring only 350.0 mete length and width 3.0 meter.
this estimate is the provision of a 50 mm 10 kg/cm2 HDPE Pipe for conveyance of water from the borewell to tank
120/ 25 Maintenance of kanakapuram Drinking water project in ward 12 (E-Quotation)
122/25- Renovation of public well in ward 4
Annual Plan-188/25 Renovation of Kokkayar Wembly road(RETEND
189/25 Kodikuthi junction to Mulamkunnu road Maintenance (RETENDER)
88/2024-25Annual Plan-Renovation of Kalleppalam road at Kalleppalam makkochi road in ward 7(RETENDER)
Rethnagiri Anganvady Renovation - Electrification Ward-9
it is proposed to concrete this road for a length of 108.00 m, with a width of 3.00 m and 0.15 m thickness. The items included in this estimate are Earhwork, PCC Nominal Mix and fixing a good quality Granite Name Board.
Annual Plan Kokkayar GP 76 Maintanance of meloram pattikunnu Road kunnumpuram Bhagam Ward 3
Reroofing of Neriamangalam Hydro Electric Power Station using GI profile or Trafford sheets
Annual Plan Kokkayar GP 75 Maintanance of meloram pattikunnu road Anganvadi bhagam Ward 3
IHEP- Supply, replacement, testing and commissioning of Copper Interconnecting bars with insulators and accessories for the Rotor of Unit #3 Generator at Idukki HEP Moolamattom
Re-Insulation of one number rotor pole of 130MW Second stage Generator of Idukki Underground power House Moolamattom.
function generator (Q3) (3 (3 ))
ICDS OFFICE IMPROVEMENT WORK COMPLETION Proj No 228 2526 Erattayar GP
Replacing of Corroded cooling water lines of Unit I and II at VSHEP
Providing fire suppression system for the Generators of Panniar Power Station
Peermade Gramapanchayat2025-26 Ward 13 Maintanance of kallar Ambalamkunu Road PRO NO 54-26-ROAD-General Civil Work
KSWMP- Procurement of LCV for NBDW transport for Thodupuzha Municipality
GENERAL-Kangiyar Gramapanchayath Project Number-SOO56/26-RE-Wiring of Kozhimala Govt. LPS Building-General Electrical Work
Peermade GP - Ward 17 Pothupara Kavala To MBC Collage Road Maintanance (Prp no 80/26) road-General Civil Work
O and M - Water Supply Schemes - Well cleaning of Narakampuzha pump house
O and M Water Supply Schemes - RWSS to Vandiperiyar - Supply and installation of gravity type gas chlorinator of 1kg/hr
Retender 194/26-AUXILUM KUNNU DWSSCOMPLETION WARD 28
GENERAL-Kangiyar Gramapanchayath-SO297/26 Electrification of Various Anganavadies
Drinking Water Supply to wards of mariyapuram grama panchayat
Renovation and repairing of valve house building and connected structures of Panniar HEP-Repair of damaged wall plastering, reclaiming of doors and windows,painting ,repairing damaged drainage systems and providing GI profile sheet roofing over roof
Annual Plan- PROJECT NO - 387/2025-26 MULLOORKANAM THEKKEMALA ADIVARAM BHAGAM DWS COMPLETION IN PERUVANATHANAM GP, AZHUTHA BLOCK