Constt of Approach Path and Sitting Steps at Vill Rkh Jar at Pyt Fatehpur Brahmana Block R.S.Pura under SSY Capex Year - 2026-27
Constt of L/D From H/O Shamsher Singh to Onwards at Vill Abdullian Pyt Chandu Chak Block R.S.Pura under PRI Capex Year - 2026-27 (BLOCK LEVEL)
Constt of L/D From H/O Surinder Singh to H/O Capt. Bhutta Singh Wno6 at Vill Pyt Chandu Chak Block R.S.Pura under PRI Capex Year - 2026-27 (BLOCK LEVEL)
RBM filling of Tractor Road at Camp Rathana at Pyt Rathana Block R.S.Pura under APDP Capex Year - 2026-27 (BLOCK LEVEL)
Sofa (V3) (Q2), Modular Table/Meeting Table/Centre Table (V2) (Q2) (3 (3 ))
Constt. Of L/D with interlocking tile from H/O ramesh Kumar to onwards Sant Colony Gagian at pyt gagian R.S Pura Jammu BDC 2026-27 (BLOCK LEVEL)
Contt of L/D From Main road to H/O Suram Singh At Vill Abdullian and Pyt Chandu Chak Block R.S.Pura under PRI Capex Year - 2026-27 (BLOCK LEVEL)
Contt of L/D From H/O Hans Rajh To H/O Jasbir Singh WNO4 At Vill and Pyt Chandu Chak Block R.S.Pura under PRI Capex Year - 2026-27 (BLOCK LEVEL)
Contt of L/D From H/O Ram Singh To H/O Channa Singh WNO4 At Vill and Pyt Chandu Chak Block R.S.Pura under PRI Capex Year - 2026-27 (BLOCK LEVEL)
Constt of Boundary Wall and Allied Works of Higher Secondary Chakroi Lower Pyt Chakroi Lower Block Suchetgarh Under SSY Component for FY 2026-27(BLOCK LEVEL)
Construction of lane drain from house of Ravi Kumar to onwards ward no. 2 Kotla Block Arnia under PRI Capex for the year 2026-27(BLOCK LEVEL)
Construction of drain from Chpri to Dich Panchayat Kathar ward no. 4 Block Arnia under PRI Capex for the year 2026-27(BLOCK LEVEL)
Construction of lane drain from the house of Tirath to onward panchayat Jabowal Block Arnia under PRI Capex for the year 2026-27(BLOCK LEVEL)
Construction of drain from house of Rajan Singh to onward ward no. 5 Kothey Kathar Block Arnia under PRI Capex for the year 2026-27(BLOCK LEVEL)
Construction of Community hall/ boundary wall near Radha Krishan Temple at Nandpur (Ranjitpur) of Pyt. Bahadurpur Block Arnia under SSY for the year 2026-27(BLOCK LEVEL)
Construction of culvert near House of Balbir Singh onwards at Allah Ward No. 9 Block Arnia under PRI capex for the year 2026-27(BLOCK LEVEL)
Improvevement of infrastructure and building upgradation in panchayat ghar Samka, Pyt Samka , R.S Pura Jammu PRI 26-27 (BLOCK LEVEL)
PHOTOSTATE PAPER A4 SIZE, PHOTOSTATE PAPER A3 SIZE, PHOTOSTATE PAPER FS SIZE, PHOTOSTATE PAPER FS GREEN, REGISTER 100 PAGES, REGISTER 200 PAGES, REGISTER 300 PAGES, ENVELOPE YELLOW 9X4, ENVELOPE YELLOW 11X5, ENVELOPE YELLOW 12X10
Multi step indoor water fountain for Hospital
X ray baggage inspection system as per MHA QR (V3) (Q2) (3 (3 ))
Shifting Re-erection of 250KVA substation along with HT LT line at Shama Chak main bazar on BJ2 feeder to new proposed site of Sh. Ashok Sharma s o Sita Ram 9906353621under UT Capex budget in Janipur on turnkey basis SCodePDDSS2627100503.
Replacement of damaged CT/PT unit at FTR HQ BSF Camp Paloura, Jammu on 11KV MU-06 feeder I the jurisdiction of sub division Janipur on turnkey basis
Creation of 630KVA substation along with HT line for technological intervention for Fish seed and Trout production in UT of JK DrMangla Rai Committee Project (Installation of Large Carp Feed Mill at RAFDA GhoManhasa Jammu Scheme Code FSHSS2324100013
please refer BOQ
please refer BOQ
SETC of 4x250KVA sub-stations along with HT line at Boria Filter Plant Left bank of river Tawi Inside Jammu University and JDA Land Transport Nagar under SASCI on Turnkey Basis within the jurisdiction of XEN ED II, JPDCL
Laying of Tiles from Moh Girdhari Lal to onwards Ward no 7 Pyt. Sarote Block Mathwar. Under Scheme DDC District Capex Budget for the Year 2026-27(Block Level)
Installation of Railing around Plateform near High School Sarote Panchayat Sarote Block Mathwar Under Annual Action Plan under Component PRIs Grant-District Capex Budget 2026-27 (Block Level)
Const. of Water near Dev Sthan near Mohan Lal W.No. 4 Panchayat Sarote Block Mathwar under UT Capex budget(PRIS) for the Year 2026-27. (Block Level)
MISC EM
FD WATERSUPPLY RO PLANT
FOL STORAGE TANK
Construction/Strengthening of damaged Flood Protection Work on right bank of river Tawi at Chak Rakhwala in Nagrota
REPAIR / REPLACEMENT OF DAY TO DAY COMPLAINTS, FAN, GEYSER, SOLAR WATER HEATER AND OTHER CONNECTED ITEMS UNDER AGE E/M OF GE NAGROTA
MCB Assy, Contactor Relay, Armature Assy, Fuel Pipe, Rectifier Metallic, AVR, Lub oil Filter, Fuel Filter
Bty Charger Motorola, Adopter Motorola, On off Switch Cock, BC Kit, Connector, Bty 12V 7AH
Fuel Filter Assy, Connecting Rod Assy, Piston Assy with Ring STD, Fuel Pipe with Benjo, Exhaust Fan, Eng Mtg Pad, Big End Brg Cell, Pump Element, Fuel Filter, Oil Filter, Air Filter
Ignition Cum Steering Lock, Assy Ball joint, Field Coil Assy, Sealing Compound Anabond 673, Spider Universal Joint, Cable Assy Control
Assy Universal Joint, Assy Ball Joint RH Thread, Pump Water, Solenoid Valve 24V, Oil Seal, Joint Rubber, Handle Lock, Motor Assy Wiper, Air Filter, AC Filter, Oil Filter Assy
Round the Clock operation of the HVAC system Installed at AIIMS Vijaypur, Jammu Jammu for one year.
Auditor for NHM Jammu and Kashmir for F.Y. 2025-26 (01 of 2026)
Construction of Lane drain from Bodh Raj house to onwards near Dental college Pyt. Sehora A Block Bishnah under PRI Capex for the Financial year 2026-2027.
Ignition Switch, High Pressure Pipe, Exhaust Manifold, Switch Toggle, Carbon Bush