Loading…
Loading…
11,854 results • Latest
Antivirus Software (Q2)
Constt of Platform at Chowk Sikander Wno6 Pyt Bandwal Block Bhalwal Brahmana, Distt. Jammu Under PRIs component district capex for the year of 2026-27. (Panchayat Level)
Constt. Of tile work at Bua Datti Mandir Brigade w.no-1 Pyt Pallanwala Lower Block Khour and Constt. Of P/form at w.no.4 near ram mandir Pyt Pallanwala Lower Block Khour UNDER SCHEME CAPEX BUDGET (PRI PLAN) FOR THE YEAR 2026-27 (Pyt Level)
Construction of crate revetment/ earthen embankment with studs for protection of army defence posts/ structure from manwar Tawi near view point (Crate revetment with earthen bund) Length 252m
PERIODICAL SERVICE FOR OTM BUILDING AT TECH AREA OF 23 WING AND KALUCHAK AT AF STN JAMMU UNDER GE AF JAMMU
Constt of Irrigation Channel NLO of Vijay Kumar at Wno2 Pyt Bandwal Block Bhalwal Brahmana, Distt. - Jammu Under PRIs component district capex for the year of 2026-27. (Panchayat Level)
SPL REPAIR TO BLDG NO T-131, 150, 173 AND 217 AT SILA GRN UNDER GE NAGROTA
SPL REPAIR TO ROAD AND PATHWAYS (INCLUDING SHIFTING OF ELEC INFRA) AT SUNJUWAN UNDER GE JAMMU
Const. Of l/drain at upper nandwal moh pawan kr w no 5 Pyt Naryana Lower Block Khour Under The Scheme Pri Plan Capex Budget For The Year 2026-27 (Pyt Level)
Constt of Lane Main road to house of Parshotam lal w.no 3 and Construction of tile work vrinder sudan to kuldeep raj Pyt. Naryana lower Block Khour Under the PRI plan for the year 2026-27 (Pyt Level)
SPL REPAIR TO SINGLE OFFRS ACCN BLDG NO T-393 AND 438 AT SILA GRN UNDER GE NAGROTA
Constt of lane near Mohalla jaggatar lal and mohalla Naranjan w.no 4. nai Basti w.no 4 amt 1 lakh, protection wall kalu ram 1 lac and const of lane from main road to h/o veenet kumar w no 4 Pyt. Naryana Lower Block Khour PRI 2026-27
Tile work near Radha Krishan Temple at Wno10 Pyt Bandwal Block Bhalwal Brahmana, Distt. Jammu Under PRIs component district capex for the year of 2026-27. . (Panchayat Level)
ultraviolet sheet
Const.of l/d at moh. chnaderban w.no.7 pyt. Naryana lower and const of lane from moh.rattan lal at nandwal w.no.6 Pyt Naryana Lower Block Khour Distt Jammu under the head capex budget (PRI plan) for the year of 2026-27 (Pyt Level)
Const of lane main road to h/o ashok singh manhas w.no.1 pyt naryana lower block khour and constt of Lane near house of karneal singh w.no 2 Pyt Narayana Lower Block Khour Under the PRI plan for the year 2026-27 (Pyt Level)
Day to day maintenance/ general upkeeping of road from Galwaday to Lalyal, links of sui Simbli, Chatha Gujran and allied links for the year 2026-27
REPAIR TO ROOF TREATMENT, ATT AND OTHER MISC WORKS AT MD ACCN AT AF STATION JAMMU UNDER GE (AF) JAMMU
Constt of Tile work and Drain at Chowk near Transformer at Sireywala Colony Wno9 Pyt Bandwal Block Bhalwal Brahmana, Distt. Jammu Under PRIs component district capex for the year of 2026-27. (Panchayat Level)
Repair and renovation of Panchayat Ghar Hamirpur Pyt Hamirpur Block Khour - 02 lacs and Constt. Of lane near h/o Rinku Manhas Pyt Hamirpur Block Khour- 01 lacs under PRI CAPEX BUDGET for the Year 2026-27 (Pyt Level)
Constt. Of Lane/drain near h/o waryam to dhanater singh Pyt Hamirpur Block Khour- 02 lacs and Constt. Of Lane near h/o Jagatter Singh Pyt Hamirpur Block Khour- 01 lacs under PRI CAPEX BUDGET for the Year 2026-27 (Pyt Level)
Constt. Of lane/drain near h/o prem singh to neel kumar w.no.1 Pyt Hamirpur Block Khour-02 lacs and Constt. Of tile and allied works of ground of MS Hamirpur Pyt Hamirpur Block Khour- 01 lacs under PRI CAPEX BUDGET for the Year 2026-27 (Pyt Level)
Constt. Of lane from h/o Ajay Singh to kali dass Pyt Hamirpur Block Khour- 03 lacs under PRI CAPEX BUDGET for the Year 2026-27 (Pyt Level)
Constt of Lane from main road to H/o Madan Lal Verma at Wno1 Pyt Bandwal Block Bhalwal Brahmana, Distt. Jammu Under PRIs component district capex for the year of 2026-27. (Panchayat Level)
PERIODICAL SERVICE AND CAMOUFLAGE PAINTING TO CERTAIN BUILDINGS AND BOUNDARY WALL IN KALUCHAK AREA AND 23 WING UNDER GE AF JAMMU
Day to Day Maintenance/ General Upkeeping of Road from Jhiri to Mishriwala Road, Hari Singh Gharat to Heera Chak and Allied Links for The Year 2026-27
Constt of Lane/Drain NHO Omparkash S/o Chattru Ram Wno 10 Pyt Bandwal Block Bhalwal Brahmana, Distt. - Jammu Under PRIs component district capex for the year of 2026-27. (Panchayat Level)
Day To Day Maintenance/ General Upkeeping of Road from Marh to Marh Bagh, Chak Jaffer, Links of Khalassey Chak, Halqa to Heera Chak Kulein Road and Allied Links For The Year 2026-27
MAINTENANCE OF TENGIBLE ASSETS
Constt of Lane/Drain from Main Road to H/o Ajay Kumar S/o Gopal Dass at Wno 05 Pyt Bandwal Block Bhalwal Brahmana, Distt. Jammu Under PRIs component district capex for the year of 2026-27. (Panchayat Level)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; REPAIR REWINDING AND REPLACEMENT OF IMPELLER AND CAPICITOR OF 01 HP MONOBLOCK PUMPSET; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Office Space; REPAIR REWINDING AND REPLACEMENT OF BEARING AND CAPICITOR OF HALF HP MONOBLOCK PUMPSET; Service Provider, and Installation of Plant Systems/Equipments (Version 2) - Office Space; REPAIRING OF WATER SUPPLY 100 MM AND 80 MM CONTROL VALVE; Service Provider
Filter Assy Fuel, Lub Oil filter, AVR Assy, AC Gas, Spark Plug, Filter Assy Lub Oil
Security Manpower Service (Version 2.0) - Healthcare; Unarmed Security Guard, Security Manpower Service (Version 2.0) - Healthcare; Security Supervisor
Modular Car/Vehicle Parking Shed (Q3)
Externaldvdwriter, Dlink8portswitch, Dellkeyboardandmousekitwireless, Hdmicable
Repair of power supply for rice steam boiler and standby
Non Ionic Iso osmolar iodinated contrast 320 mg/ml of 100 ml vial
REPAIR/REPLACEMENT OF INTERNAL WIRING INCLUDING FITTING AND FIXTURES AT OTM ACCN UNDER AGE E/M OF GE NAGROTA
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2)
Catering service (Event Based) - AS PER MENU; AS PER MENU; AS PER MENU
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; WHITEWASH IN MI ROOM WITH COMPLTE CLEANING AND FINISHING; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; REAPRING AND FABRICATION OF TANDOOR COVER WITH IRON FRAME AND JALLI; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; REPAIRING OF CHAPATI MAKING MACHINE; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; CLEANING OF 20 SMALL 1000 LTRS WATER TANKS WITH 1 BIG MAIN CEMENTED WATER TANK 3000 LTRS; Service Provider
ASSY OF POWER TAKE OFF, AIR CLY PNEUMATIC DOOR, ASSY BRAKE ACTUATOR, ASSY GRADUATED HAND BRAKE, WHEEL CLY 44 45, HUB OIL SEAL REAR