Loading…
Loading…
1,020 results • Latest
Improvement to Mangarajpur Sahabajpur Drainage Cut and Link Drain of Itakhandia Drainage Cut under Mahakalapara Block
Improvement to Bhagawanpur Drainage Cut with its link drain under Rajnagar Block.
Renovation of Chhunchhunia Drainage Cut and its slope protection work under Doab No II
Improvement to Badajore DC Podagayaspur DC Niamatpur DC of Gobari Drainage System under DOAB-II
Renovation of Gandakul to Katarmal Drainage Cut outfalling to Gobari Drainage system (Doab-II)
Renovation of Link of Chandibaunsamula to Gupti Drainage cum Creek in Rajnagar Block
Improvement to Kajala Drainage Cut and its Slope Protection work under Doab-II
Renovation of Link of Mahulia to Harishpur Drainage cum Creek in Rajnagar Block of Kendrapara
RENOVATION OF NARANPUR D.C AND ITS LINK DRAIN UNDER PATTAMUNDAI BLOCK.
Improvement to Kansar DC, Radia Kusipal DC, Badabaincha DC, Pankapal DC, Maladhia DC of Gobari Drainage system under Doab No.-II.
IMPROVEMENT TO EKALAPUR DRAIN,RANKI LINK DRAIN,TARAPADA LINK DRAIN,ARADA LINK DRAIN-1,ARADA LINK DRAIN-II OF GOBARI DRAINAGE SYSTEM UNDER DOAB-II
Renovation of Link drain of Peta nala, Bisi Nala, Mahara Nala and Chadheikhia Nala outfalling to river Baitarani Doab-XIV.
Improvement to Kentia Bahakuda Drainage Cut by Construction of Sluice Cum Farm Land Bridge Near Village Kentia.
Construction of 50MT Godown PACs at Kasananta for the year 2026-27
Construction of Office Building in PACs / LAMPCs at Kasananta for the year 2026-27
Improvement to Basudeipur Dahalpur DC near village Mahala (Chandiajore)
Renovation of Adhajore Sankrupa DC and its link drain outfalling to Gobari Drainage System
Construction of 06 Nos. Of Recharge Shaft cum Monitoring Station in Pattamundai Block of Kendrapada District during FY 2026-27
RandD Road to Silapokhari__Pot hole,WBM GR-II,PMC, Seal Coat2.000 to 2.800
Kurunti Basulei Road__Pot hole,WBM GR-II,PMC, Seal Coat3.100 to 3.700
Hansina to Chakamanipur Road__Pot hole,WBM GR-II,PMC, Seal Coat3.000 to 3.800
Industrial Painting works in DCU unit during MandI Shutdown-2026 at Paradip Refinery
Dera to Pentha Road__Scarifing the BT Surface ,Potholes fillup with WMM and PMC and SC0.800 to 1.400
Repair to H.L Bridge over River on Angadaghat Nagadaghat Road_Road_Bridge approach -Pothole repair ,PMC,SC- and Colouring3.090 to 3.290
Hariharapur banabiharipur_Road_CC Overlaying, Earth Work,Berm repair4.200 to 4.700
Ajagarpatia to Sailendranarayanpur Road__Pot hole,WBM GR-II,PMC, Seal Coat5.400 to 6.000 7.200 to 8.000
Guptira to Banto-Vedisahi Road__ Potholes repair by WBM GR-III, PMC and Sealcoat.0.300 to 0.700
Jaysinghapur Niginpur Road__ Potholes repair by WBM GR-III, PMC and Sealcoat.0.950 to 1.650
Gobindpur Bridge Juania Switchgate Road__WMM, PMC,Seal Coat 0.000 to 1.600
Repair to H.L Bridge over Luna nallah at Sanjharia to Dihudipur Road_Road_Bridge Approach-CC-1.360 to 1.560
Malipur to Udayapur road_Road_CC Overlaying, Earth Work,Berm repair1.370 to 1.700
Nuapada Railo Road__WMM, PMC,Seal Coat,CC Overlaying 1.000 to 1.600 0.200 to 0.500
PWD road to Balarampur_Road_CC Overlaying0.100 to 0.480
PWD Road to Balikira__ Potholes repair by WBM GR-III, PMC and Sealcoat.1.000 to 1.600, 3.400 to 3.800
RD road Juania_Road_CC Overlaying, Earth Work,Berm repair1.000 to 1.650
Irrigation Embankment to Sidhabali_Road_Boxcell Culvert -1x3x6- At 1.100 km
Siopada to Hatasahi_Road_CC Overlaying0.1500 to 2.160
Gandakhia Road Canal - Kakharuni__CC Overlaying, Earth Work,Berm repair1.300 to 1.700
Hariabanka to Baranumber Road__BUSG,PMC and Seal Coat0.900 to 1.797 2.117 to 3.176 3.291 to 3.559
Protection to scoured bank on Chitrotpala right embankment near village Mahamadpur from RD 29.725 Km to 29.795 Km.
Construction of VRB on Disty.no.8 at RD 8.400 Km with with foot bridge on Haladiapatna Minor and Pallipatna with Kumbhara Sahi Gada of Pattamundai Canal.
Construction of Guard wall on Disty.no.15 of Kendrapara Canal left side from RD 3.400 Km to 3.435 Km. and 3.51 Km to 3.548 Km.
Construction of Guard wall on Disty.no.15 of Kendrapara Canal left side from RD 4.300 Km to 4.340 Km. and 5.100 to 5.130 Km.
Construction of Guard wall on Disty.no.15 of Kendrapara Canal left side from RD 2.500 Km to 2.572Km.
Construction of Guard wall on Disty.no.15 of Kendrapara Canal left side from RD 5.210 Km to 5.250 Km and 5.380 Km. to 5.414 Km.
Improvement to Disty.no.13 of Kendrapara Canal between RD 2.830 Km to 3.500 Km.
Protection to scoured bank on Gobari right embankment near village Endor.
Protection to scoured bank on C.E.No.44 A Nuna left from RD 48.420 Km. to 48.500 Km. near village Basupur.
Protection to scoured bank on C.E.No.44 A Nuna left from RD 52.895 Km to 52.975 Km near Sakhibata.