Loading…
Loading…
589 live316 closing this weekmost from East Coast Railway and Municipal Bodies
589 results • Latest
Survey, Design, Supply, foundation, fabrication, erection, Testing & Commissioning of Towers in connection with installation of Kavach over Sambalpur division of East Coast Railway.
Hiring of Consultants - Milestone/Deliverable Based - Proposal for Engagement of Consultant for Feasibility Report and Detailed Project Report for SGA and Other Alumina Based Value Added Products; As Per RFP; No; Hybrid(As specified in scope of work)
Request for Proposal (RFP) for providing Project General Management Services for New line, Doubling, Multitracking and other Projects in Construction Organization under CAO/Con of East Coast Railway for different field offices/ HQ office and ongoing projects under CAO/Con/BBS
Supply, Installation and Maintenance of IP Based CCTV Surveillance System for PMSHRI Schools of OSEPA
Security Operations Centre - Manpower with AMC
Valuation and Monetization of Obsolete Plant, Machinery and Other Assets of IDCOL Kalinga Iron Works Ltd. (IKIWL) of OMC
Non-Aadhaar Based Biometric Attendance System (Q2)
RFP for Selection of Agency for Supply, Installation, Commissioning and Maintenance of Extended Detection and Response Solution for Lok Seva Bhavan, Kharavela Bhavan, Rajib Bhavan and other Govt. Offices functioning under Secretariat LAN
SELECTION OF AGENCY FOR PROVIDING COMPREHENSIVE FACILITY MANAGEMENT SERVICES (CFMS) AT Post Graduate Institute of Medical Education and Research and Capital Hospital, Bhubaneswar, ODISHA.
RFP for Selection of Lead Industry Partner (LIP) for NSTI - Bhubaneswar under PM-SETU (Component II)
Re-tender for Supply, Installation and Commissioning of MULTIPARA PATIENT MONITOR (5-Para) Equipment on Rate Contract Basis
Expression of Interest for selection of a bidder for development of an integrated silk spinning unit on PPP mode under DBFOT basis
Request for Proposal (RFP) for Design, Development, Implementation, Integration, Operation and Maintenance of SAP - Financial Accounting and Controlling (FICO) Module in OSRTC
Request for Proposal (RFP) for Selection of Master Concessionaire for Advertisements inside Buses under OSRTC
Hydraulic Spreader, Cutter, Telescopic Ram with Power Pack and Accessories
Hiring of Consultants - Milestone/Deliverable Based - ENGAGEMENT OF CONSULTANT FOR PREPARATION OF ROADMAP AND IMPLEMENTATION OF DIGITAL TRANSFORMATION; AS PER NIT; No; Hybrid(As specified in scope of work)
Re-tender for Supply, Installation and Commissioning of Laboratory Analyzer with their Reagents for confirmation of Hemoglobinopathies
Re-tender for Supply, Installation and Commissioning of Hemoglobinopathy Analyzer with their Reagents (Capillary Zone Electrophoresis)
Reconstruction of Bridges Major Bridge at Takera at Ch 184.200 and four Minor Bridge at Ch189.400, 190.600,191.400 and 193.200 on NH-57 in the state of Odisha on EPC mode
Augmentation of 220/132/33KV Atri Substation capacity from 320 MVA to 480MVA at 220 kV level through construction of 220 kV and 132 kV 3rd 160MVA Auto Transformer Bay and 60 MVA to 110 MVA at 132 kV level through construction of 132 kV and 33kV 3rd 50 MVA Power Transformer Bay in Khurda district on Turnkey contract basis
Design and Construction of Multi storied, Type-II, Type-III, Type-IV and Type-V Staff Quarters, Divisional store depot, Training institute including electrical general works and allied works at Rayagada and Area office at Koraput in connection with setting up of Rayagada Division in East Coast Railway On Engineering, Procurement & Construction (EPC) Mode
Supply Installation and Commissioning of LED Display
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Road Over Bridge (ROB's), Protection Works, P.Way Track Works with Contractor's own materials(except New/SH Rails) construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor electrification, Provision of 1x25 KV Conventional type OHE, Provision of 2 Nos. TSS, 1 No SP, Construction of new Sub-stations, Electrification of station building, Circulating areas, FOBs, PFs, Quarters, Goomties, Modification/Conversion to Underground for overhaed electrical HT/LT power line crossings etc. on EPC Basis in Rayagada Division of East Coast Railway.
Construction of Bypass Road to Aska Town on NH-157 in the state of Odisha on EPC mode
Selection of Service Provider for Biomedical Equipment Maintenance Service in the State of Odisha
Hiring of Agency for IT Projects- Milestone basis
Construction of New Major HL Bridge across River ONG at Km. 43.500 on NH-26 in the State of Odisha on EPC mode
Gunupur-Theruvali New BG line project : Design and Construction of New BG Railway line from Km 122.750 to Km 141.940 (Excluding RCC BOX, ROB Br. No 388 from km 137.725 to 137.925 but including P Way & OHE works) involving 08 Nos of Tunnels (T-2 to T-9) & from Km 110.02 to Km 113.12 involving 1 No Tunnel(T-1), BLT Works & its approaches and Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Over Bridge (ROBs), Road Under Bridge (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleeper, Special PSC Sleepers (For Turnouts, Improvised SEJs, Guard Rails Etc), Point (Thick Web Switches & WCMS Crossing, Glued Joints, H- Beam/ Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, OHE foundations, Supply and Erection of OHE Masts, Provision of 1X25 kV Conventional Type OHE (OHE-22.660TKM) including 2.86 Km ROCS in Tunnel, Provision of one feeding post (TSS) Modifications/Conversion to Underground for overhead electrical HT/LT Power Line Crossings, construction of Platforms, Station Buildings, FOB, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification works etc in Waltair Division of East Coast Railway.
Construction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odisha on EPC mode
Construction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from KM 41.50 to Km 69.60 (including Nunkhari Station) involving Earthwork in formation, Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Viaducts, Tunnels, Protection works, BLT works, P.Way Track works with Contractor's own materials (except New/SH Rails), construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification, Provision of 1X25 kV Conventional Type OHE, Tunnel OHE with ROCS, Tunnel lighting, TSS, SP, General Power Supply Arrangements Modifications/Conversion to Underground for Overhead electrical HT/LT Power line Crossings etc on EPC Basis in Waltair Division of East Coast Railway.
CONSTRUCTION OF NEW MAJOR H.L. BRIDGE LANTH-I AT CH 113/960 Km AND LANTH -II AT CH 114/446 Km OF NH 26 IN THE STATE OF ODISHA IN EPC MODE
Construction of Bypass Road to Phulbani town from km. 29.800 (Design ch. 0.0) to km 38.500 (Design ch. 6.750) of NH-157 in the state of Odisha on EPC Mode
Echo Cardiography Scanning Machine (V2) (Q2) (3 (3 ))
Construction of 2 Lane Bridge at Km 21.206 and Km 26.983 at Bargarh District on NH-26 in the State of Odisha under EPC Mode
Widening and strengthening of the existing 2-lane road to 2-lane road with paved shoulder from km 239.280 (Koksara) to km 294.280 (Nabarangpur) on NH-26 in Kalahandi and Nabarangpur districts in the state of Odisha under the EPC mode