885 results • Latest
Construction of Closed Store Building at 132/33 KV Grid S/S at Khurda
Construction of positive suction pump house with PLC room and construction of operator rest room with washroom arrangement at Govt. Polytechnic, Bhubaneswar
Supply, installation, testing and commissioning of 3.3KV, 4 Pole,250 KW HT Motor at 6MGD pump house of WTP, Palasuni, BBSR
Supply and installation of 415 Volt 500 KVA LT DG set including change over pannel, cabling arrangement and D.G set shed for 1Nos. L.T Motor for C.S Pur WTP and Other L.T load at Kuakhai Head works, BBSR
Supply, installation, testing and commissioning of 3.3 KV HT Motor pump set and HFSR Soft starter and laying of 11KV Cable at Positive suction pump house at 9MGD, Palasuni, Bhubaneswar
Supply and installation of 415 Volt 625 KVA LT DG set including change over pannel, cabling arrangement and D.G set shed for 350HP L.T Motor and Other L.T load for 3MGD, WTP Palasuni, BBSR
Godown painting, repair of floor, verandah, shutter, ventilator, office grading, electrification, plastering, compound wall paining, heightening work, costn of labour shed and costn of toilet complex SWC A-katapali(PEG-godown)
Constn of fire hydrant sump, security room, barbed wire fencing and electrification work, repair of w.b. room, compound wall painting, repair of floor, verandah, shutter, ventilator, office grading, plastering, godown painting work at SWC A-Katapali
Compound wall color, main gate repair, verandah repair, w.b.room repair,gate Repair, office grading, constn.of fire hydrant sump, security room and barbed wire fencing, QC room, godown color, plaster, electrification work, at SWC Kendupali
Godown painting, floor repair, shutter repair, construction of labour shed and construction of fire hydrant sump, security room and construction of toilet at SWC Kesinga