Loading…
Loading…
718 results • Latest
Supply Installation and Commissioning of LED Display
Jeypore-Malkangiri New BG Railway Line: Design & Construction of New BG Railway line from Km 69.60 to Km 125.18 involving Earthwork in Formation , Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Under Bridge (RUBs), Road Over Bridge (ROB's), Protection Works, P.Way Track Works with Contractor's own materials(except New/SH Rails) construction of Platforms, Station Buildings, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor electrification, Provision of 1x25 KV Conventional type OHE, Provision of 2 Nos. TSS, 1 No SP, Construction of new Sub-stations, Electrification of station building, Circulating areas, FOBs, PFs, Quarters, Goomties, Modification/Conversion to Underground for overhaed electrical HT/LT power line crossings etc. on EPC Basis in Rayagada Division of East Coast Railway.
Construction of Bypass Road to Aska Town on NH-157 in the state of Odisha on EPC mode
Selection of Service Provider for Biomedical Equipment Maintenance Service in the State of Odisha
Hiring of Agency for IT Projects- Milestone basis
Construction of New Major HL Bridge across River ONG at Km. 43.500 on NH-26 in the State of Odisha on EPC mode
Gunupur-Theruvali New BG line project : Design and Construction of New BG Railway line from Km 122.750 to Km 141.940 (Excluding RCC BOX, ROB Br. No 388 from km 137.725 to 137.925 but including P Way & OHE works) involving 08 Nos of Tunnels (T-2 to T-9) & from Km 110.02 to Km 113.12 involving 1 No Tunnel(T-1), BLT Works & its approaches and Earthwork in Formation in Embankment/Cutting, Blanketing, Side Drains, Catch Water Drains, Minor Bridges, Major Bridge, Road Over Bridge (ROBs), Road Under Bridge (RUBs), Protection Works, P.Way Track Works with Contractor's own material supplies including supply of Track Ballast, new wide based PSC Sleeper, Special PSC Sleepers (For Turnouts, Improvised SEJs, Guard Rails Etc), Point (Thick Web Switches & WCMS Crossing, Glued Joints, H- Beam/ Composite Sleepers over Girder Bridges, Improvised SEJs, all P-Way fittings, OHE foundations, Supply and Erection of OHE Masts, Provision of 1X25 kV Conventional Type OHE (OHE-22.660TKM) including 2.86 Km ROCS in Tunnel, Provision of one feeding post (TSS) Modifications/Conversion to Underground for overhead electrical HT/LT Power Line Crossings, construction of Platforms, Station Buildings, FOB, Service Buildings, SP/SSP buildings and Residential Buildings, Water Supply, indoor and outdoor Electrification works etc in Waltair Division of East Coast Railway.
Construction of new Major H.L. bridge utei at km. 87.900 on NH 59 in the state of Odisha on EPC mode
Construction of Proposed HL Bridge over Local Nallah at Ch 96.400 Km over Gadgadi River at Ch. 105.550 Km and Widening and Strengthening from Ch 91.720 to 91.920 Km on NH-153 (B) in the State of Odisha on EPC Mode
Construction of H.L. Major Bridge across River Songarh at Km. 97.958 and Minor Bridge at Singkhaman Km. 87.790 on Balangir-Bhawanipatana Road (NH-26) in the State of Odisha on EPC mode