Loading…
Loading…
21,188 results • Latest
Thorough Repair and Renovation of Electrical Installation work without provision of New Air Conditioner at Administrative Building of Calcutta Pavlov Hospital. Kolkata - 46. (Electrical work)
CHOKAGE REMOVAL FROM U/G SEWER DRAINAGE AT DIFFERENT ROADS AND ITS BYE LANES IN W/N-115
Repair and painting works of quarter number 18 and 19 at 6/1, Red Cross Place under S.G.E./W.B. during the year 2026 - 2027.
MAINTENANCE OF UFW AND FW SUPPLY MAIN AND LEAK REPAIRING AT SIKDAR PARA STREET AND ADJACENT AREAS IN WARD NO. 23.
SPL REPAIR TO DRAIN, PATHWAY, HARD STANDING, DRAIN COVERS, FENCING IN II LINE AREAS UNDER GE(A) KOLKATA
Repairing and painting works of quarter number 2, 3, 4, 34 and 49 at 6/1, Red Cross Place under S.G.E. W.B. during the year 2026-2027
Necessary repairing, servicing and replacement of damaged spare parts of Pump Unit No. A having Capacity 3.5 cusec and Head 10 m at Jameslong Sarani (LS-2) under PBPS(Drg.)/S and D.
Supply, Installation, Testing and Commissioning (SITC) of CO2 Glass Tube Laser Cutting and Engraving Machine at Birla Industrial and Technological Museum, 19A, Gurusaday Road, Kolkata - 700019 (West Bengal)
Comprehensive Preventive and Breakdown Maintenance cum round the clock monitoring of Fire Detection and Alarm Systems at different building within the campus of Calcutta Pavlov Hospital, Kolkata, for one year
Emergent construction of Inspection pit and Gully Pit for the periphery of B Block at RHE St Georges Gate Road during the year 2026 2027
Annual Maintenance,operation and repair of Electrical Installations, Air - conditioning system, Lift Installation etc. for Calcutta Homoeopathic Medical College and Hospita.-------Day to day E.I maintenance.
Through repair and renovation work of electrical installations of medical officers (MO) quarters at Calcutta Pavlov Hospital and Centre of Excellence on Mental Health, Kolkata.(Electrical Work)
Manpower Outsourcing Services - Minimum wage - Semi- skilled; Not Required; Others, Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Day to day Maintenance of entire Electrical installations for both non-residential residential buildings, compound light including Sub-Stations, Compound Light including operation of Diesel Generator set an UPS system in the premises of IPGMEandR-S
Repairing and servicing including replacement of damaged and burnt out spare parts of motor stater panel of pump unit no-4, 5 and 7 with other allied works at Ultadanga Drainage Pumping Station.
Supply (hire), installation, operation, guarding during monsoon period of 06 nos. 10 HP electrical power driven centrifugal pump..at Kalagachia-II, Hanspukur, Ward No-144, P.S-Thakurpukur, Kolkata Municipal Corporation, Dist.- 24 PGS (S)
Supply (hire ), installation, operation, guarding during monsoon period of 05 nos. 20 HP diesel pump..at Kalagachia-I, Hanspukur, Ward No-144, P.S-Thakurpukur, Kolkata Municipal Corporation, Dist.-24 PGS (S) during 2026-27. (w.e.f. 08.08.26-31.10.26)
Annual Maintenance of Electrical Installation of PAO-I,PAO-II AND PD Cell,at the 2nd AND 3rd floor of Old Khadya Bhawan Building, 11 A Mirza Ghalib Street,Kolkata-87 for the year 2025-26---Supply and Delivery of maintenance materials
Annual Comprehensive Maintenance of Online Module type UPSs installed at Vidyasagar SGH, Behala, South 24 Parganas for the period of three years.
Annual Maintenance of Electrical Installation of WBECSC Dept. at Block-B, 11 A Mirza Ghalib Street for the year 2025-26-Supply and delivery of maintenance materials
Supply (hire), installation, operation, guarding during monsoon period of 05 nos. 20 HP diesel pump..in and around of Garfa, Ward No-104, P.S-Garfa, Kolkata Municipal Corporation, Dist.- 24 PGS (S), during 2026-27. (w.e.f. 08.08.2026 to 31.10.2026)
AMC for the entire EI of Heritage Building and G PLUS 3 storied building of Aliah University at Taltala Campus, 21,Haji Md. Mohsin Square , Kolkata16 From 01.04.2025 to 31.03.2026 Supply and Delivery of urgent maintenance materials
Repairing and Renovation work of the ground floor of Woodburn Block in IPGMER -SSKM Hospital,Kolkata-Electrical Work.
Servicing, Repair, and Complete Replacement of Damaged Components/Appliances of Fire Hydrant System
High End Laptop-Notebook (Q2)
SITC of 04 nos. new split type AC machines with allied electrical works at different office room under WRID dept. at block-B 6th floor of Khadya Bhawan,Kolkata-87
Repairing AND Renovation of Electrical Installation work at various places of MLA Hostel, Kolkata 700016
Renovation and Reorientation of the chamber of Honble MIC/NBDD in NBDD office runs at Mitra Buildings, Lyons Range, BBD Bag, Kolkata, under PWD jurisdiction (Civil Works).
Repairing, Renovation of E.I Work at Civil Sub-Division Office at MLA Hostel Kyd Street, Kol - 16
Construction of Video Conference Room at Ground Floor of 2 no Building at Bankshall Court at 2 and 3 Bankshall Street Kolkata700001 during the year 2024 2025 Structural Portion
REPAIRING OF ASPHALTUM ROAD AT SREE BARDHAN PALLY ROAD, SARADA PARK ROAD, ETC IN WARD NO 125
Annual maintenance estimate for the entire E.I s of Maulana Azad College, Baker Govt. Hostel, Annexe Building of Baker Govt. Hostel and Womens Hostel of Maulana Azad College, Kolkata for the year 25-26.S and D of urgent maintenance materials
ARMO EI & fans i/c compound light, pump sets, Sub-Station, DG set for Institute Building & Hostel Building at MAKAIS, IB Block, Salt lake, Kolkata during 2026-27. (SH: Servicing of 125KVA DG set & Dry type transformer).
Maintenance operation of electrical installations like internal & external electrical installations, Fire Fighting system & Lifts in GSI office complex at 27, 29 J.L. Nehru road & 15 kyd Street, kolkata-16. (SH:- AMC of 6 passenger Lift at GSI Kyd Street, Kolkata)
Upgradation/Renovation of extended area of Language Division at 17th Floor, 2nd MSO Building, Nizam Palace, Kolkata. SH: Balance work.
MOEI and Fans, RMO pump set, DG Set, VRF AC Unit and Lift at IBM, Pokhariput, Bhubaneswar during 2026-27.
M/o Horticulture work at Aayakar Bhawan Poorva NADT-RC Building, Kolkata during 2026-27.
Provision for construction of sump with drain at LHS total 18 and provision for hump total 6 nos over the section of Sr.DEN/III/Sealdah.
Improvement of track drainage work in Sealdah-Park Circus, Brace Bridge Yard, Brace Bridge-Santoshpur and other locations to prevent waterlogging under Assistant Engineer/Ballygunge.
Fitting fixing of 12mm dia steel wire rope for 3 nos.power bucket achines (Set No.10 10A,11 11A and 12 12A) under SCD (N).
Rehabilitation and repair of the West Bengal Law Clerks Association room located entry gate no. 1 at premises 2 no. Bankshall Court Building, located 2 and 3 Bankshall Street, Kolkata 700001 during the year 2024 25.
SUPPLY OF FURNITURE
Repairing of entire Electrical installations at the ground floor of eastern wing of Ballygunje Science College ..Emergent temporary electrical installation for changing old main LT panel in connection with the work
Repairing and replacement of damaged spare parts of 2 nos. Jetting cum Suction machine (Standard size), having vehicle no. WB 05A 0676 and WB 05A 0663 of SCD (North).
SITC of 1 No. Split type and1 No. Cassette AC Machine in the Chamber of Deputy Director and SMU Cell on 7th floor of MSMET at Shilpa Sadan, Camac Stree
REPAIRING OF ROOF OF GATHA 1ST FLOOR LEVEL WITH OTHER ANCILLARY WORKS AT TOWN HALL ANNEX BUILDING
Triennial Comprehensive Maintenance of all window type air conditioning machines installed at PSC building under Electrical Construction Sub-Division,P.W.Dte.
Urgent replacement of G plus 11 Storied, 10 Passenger Lift applicable Collapsible Gates, Electro-Mechanical Door Locks at M.S. Building Body Guard Lines, Kolkata LIFT No. 1 and 3
Proposed Construction of lift shaft G PLUS 3 for the New Male Ward Building of Calcutta Pavlov Hospital 18 no Gobra Road Kolkata 46