Hyhama Nallah-Construction of Erosion control/FP work on left side of Batpora nallah at Balkoot Batpora RD 500 mtrs.
Hyhama Nallah-Construction of flood protection works by way of toe crates on R/S of at Dudwan from RD 2800 to 2824 m and L/S of Hyhama Nallah D/S Regipora bridge RD 3000 to 3325 m.
Mancher Nallah-Construction of Erosion control/FP work on at spots from RD 0 to 10000 mtrs
PDDSS2627100246-Augmentation of sub-stations for critically overloaded DTs for winter preparedness under UT Capex Budget 2026-27 for ED HAndwara
PDDSS2627100245-Creation of feasible substations of 63kva for ED Handwara (at Maidan Mohalla Yaroo, Kaw Mohalla Nagri, Machi Mohalla Ahgam) under UT Capex Budget of 2026-27
PDDSS2627100388-Creation of 100kva sucb station along with HT/LT network at Shah Mohalla Renan for ED Handwara under UT Capex Budget 2026-27
PDDSS2627100247 -Improvement of HT/Network for ED Handwara (at Kasloo, Mawer, Batgund, Kralgund, Hanga, Keegam, Sopernaghm, Makal)under UT Capex Budget of 2026-27
Const of foot path with R/wall nho mohd Salim Khan and others at batpora b
CONSTRUCTION OF P BUND AT KHAH KUL NEARLO IRSHAD AHMAD PIR AT GEERIPORA
C/o sanitary Complex Jamia Masjid Gushi At Gushi-A