Loading…
Loading…
95 results • Latest
Bandai Dam Ke Upstreem Mai Matasya Akhet Ki Nilami
CONSTRUCTION OF RWH AT AGANWADI CENTER, BLOCK- MADAWARA (53 NOS.), LALITPUR
CONSTRUCTION OF RWH AT AGANWADI CENTER, BLOCK- MEHRAUNI (57 NOS.), LALITPUR
Labour engaged for removal of existing soil from flower pots and refilling with fresh fertile soil on the right side of the earth dam Top Flower Pot right flank, RD 370 m to 1300 m at Rajghat
Labour engage for removale of grass, small trees vegetation and cleaning of V - Notch right site earth dam right flank, Rajghat
Labour engage for removale of grass, small trees vegetation and cleaning of Toe Drain RD 400 m to 650 m right site earth dam right flank, Rajghat
Labour engage for removale of grass, smalltrees vegetation and cleaning of right site Second berm shuite drain D/s slope of earth dam right flank, RD 370 m to1300 m at Rajghat
Estimate for purchasing of empty cement bag, filling soil with stitching, loading unloading and stacking at right site earthen dam, view point varrier, Rajght
Labour engage for Cleaning of outfall drain RD 2.445 km D/s site of earth dam right flank at Rajghat Dam Rajghat
Ward No. 5 Construction of Chabutara at public place near Sonu Maharaj house