Loading…
Loading…
4,113 results • Latest
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
A3 Size Multifunction Printer (MFP) (Q2) ( ( 3 3 ))
A4 and Legal Size Multifunction Printer (MFP) (Q2) ( ( 3 3 ))
Request for proposal (RFP) for Hiring a Social Media Management Agency
New Construction work of Bijolito Garhi Balkishan Road in District Mathura
New Construction work of Ole (Nagla Tangar) to Nagla Dev Kishan road in District Mathura
CONSTRUCTION OF SUMP CUM PUMP HOUSE NEAR HOTEL GOVARDHAN PALACE FOR DRAINAGE OF RAIN WATER ON INDRAPRASTHA COLONY AND DHAULI PYAU ROAD IN MATHURA DISTRICT (U.P.)
Multifunction Machine MFM (V2) (Q2), High End Desktop Computer (Q2), External Hard Disk 1 TB, 1 iOS Mobile Phone, Scanner, HDMI Cable, Web Camera HD
High End Desktop Computer (Q2) ( PAC Only ) (3 (3 ))
Repair work of Aproch Slab and road of minor bridge at Agra Canal Radhakund to Konhai road and road safety work in District Mathura
AS PER NIT
Design, supply, and installation of modular composite surface system comprising interlocking louver panels of standard thickness of 12 mm Solid panel & width of 300 mm, with dual-tone finish. Panels shall be CNC machined, wood-textured, epoxy-coated, and fixed in a horizontal modular matrix over aligned support grids using concealed clamping arrangement, including integrated concealed pathways for lighting and electrical services. Coverage: approx. 180 sqm up to 10 ft height.
As per NIT
Construction of Drain at Vrindavan Parikarma Road to NH-2 vai Devi Atas road in Distt. Mathura.
Construction of Drain on Sakrava Abadi Portion at Goverdhan Palso Road in Distt. Mathura
Supply, installation and commissioning of Modular Kitchen in C and D type Quarters and Maintenance job of already installed modular kitchen at Mathura Refinery Township.
High End Desktop Computer (Q2) (3 (3 ))
Annual Rate Contract for Repair and Maintenance of Roads at IOCL, Mathura Refinery
Entry and Mid Level Desktop Computer (Q2), High End Laptop - Notebook (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2), Line Interactive UPS with AVR (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
High End Desktop Computer (Q2) (3 (3 ))
Set of modular switch plate and switch c [Set of modular switch plate and switch consisting of the following modules (A) Three Modules switch plate -1 No. (B) Single switch 6 Amps - 3 Nos. the switch shall be of SPST, 6 Amps, 230 V AC rating. The switch assembly shall meet the following requirement. (1) The switch unit shall be generally confirming to IS: 3854, (2) The modular switch shall be suitable for accommodating in respective cut away and mounting dimension indicated of ICF Drawing No. ICF/SK3 7-4-001. (3) Makes CRABTREE, ALEMAC, RECORD, SSK, CPL, OSWIN only acceptable. OEMs or Authorized dealers only to quote with documentary evidence and 24 months warranty.]
Entry and Mid Level Desktop Computer (Q2), Multifunction Printer (Print, Scan, Copy) (Q2), Line Interactive UPS with AVR (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Flatbed Truck; 40 to 80 FT Double Excel
Mixed Item
Computer Printer (V2) (Q2)
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
data wall display (Q2), Networking/Server Rack (Q2), Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Current Transducer Assly for AGAI/BATI
Multifunction Machine MFM (V2) (Q2), Computer Printer (V2) (Q2), Entry and Mid Level Desktop Computer (Q2), High End Desktop Computer (Q2), Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
High End Desktop Computer (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2), Entry and Mid Level Laptop - Notebook (Q2), Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
25 SQ.MM, YELLOW COLOUR, ELECTRON BEAM IRRADIATION CURING PROCESS OR CHEMICAL CURING PROCESS THIN WALLED FLEXIBLE ELASTOMERIC CABLE WITH COPPER CONDUCTOR SUITABLE FOR ROLLING STOCK APPLICATION CONFORMING TO RDSO SPEC.NO.ELRS/SPEC/ELC/0019, REV.4, FEB-2018, 1.8 KV GRADE. NOTE: (1) ITEM/TYPE/MODEL/MAKE/BRAND FROM THE MANUFACTURER/SUPPLIERS AS APPROVED BY RDSOSHALL ONLY BE CONSIDERED. (2) CABLES SHALL BE SUPPLIED IN COILS OF 500 METRES LENGTH AND LEFTOVERQUANTITYIN MULTIPLES OF 100 METRES WITH A TOLERANCE OF +/-5% ON THE LENGTH. (3) FIRM SHALL INDICATE THE CURING PROCESS(E- BEAM IRRADIATION OR CHEMICAL CURING)IN THEIR OFFER.
Refined Sunflower Oil (V4) (Defence) (Q3), Refined Mustard Oil (V4) (Defence) (Q3), Refined Groundnut Oil (V4) (Defence) (Q3) (3 (3 ))
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
AS PER NIT
SET OF DOOR FRAME PANELS FOR LHB COACHES as per Drawing: MPLDFPLCBACX1 VERSION 0., FOLLOW COLOUR SHADE RAL-DS-200 60 10 (PU PAINT SYSTEM TO MDTS-118) FOR PANELS
AS PER NIT
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
AS PER NIT
Construction of 400 KL 16 mtr staging over head tank Supply and laying jointing of feeder main Rising main and distribution system including supply of all material labour T P etc including defect liability period of one year