Loading…
Loading…
4,113 results • Latest
Synthetic Enamel, Interior, Finishing, Smoke Grey for the system of interior painting of coaches. Specification:- IS 133:2023(Sixth Revision) including optional requirements mentioned in Table 2 & 3 of IS 133:2023(Sixth Revision), ISC:692 with RDSO Amendment No.1A(Rev.1.0) as an additional requirement. Special terms & conditions:- (i) Material shall be packed in 20 Ltrs. metal containers conforming to IS:2552/1989 amend.1 (Third Revision) (Reaffirmed2018) Grade B-1. (ii) The goods should be dispatched within 02 months from the date of manufacturing and firm will give an undertaking that the material supplied is not more than 60 days old. (iii) Suppliers have to write on the container Batch No., Date, Month, Year of Manufacturing and also write the paint can be used before 12 months from the date of manufacturing. (iv) Keeping Properties - Not less than One Year from the date of manufacturing. [ Warranty Period: 30 Months after the date of delivery ]
AS PER NIT
AS PER NIT
As per NIT
Computer Printer (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Please Refer to tender document
Steel Wheelbarrows (Q3)
Mobile Containers For Solid Waste Conforming to IS 12402 (Q3)
Planned Visit RMDS, Breakdown and Emer Visit RMDS, Addl Manday RMDS and BhRS, Planned Visit BRDS, Breakdown AND Emer Visit BRDS, Addl Manday BRDS AND TKRS, Planned Visit TKRS, Breakdown AND Emer Visit TKRS, Planned Visit BhRS, Breakdown AND Emer Visit BhRS, Planned Visit RRPS, Breakdown AND Emer Visit RRPS, Addl Manday RRPS, Planned Visit BRS, Breakdowm AND Emer Visit BRS, Addl Manday BRS AND MRS, Planned Visit MRS, Breakdown AND Emer Visit MRS, Planned Visit KRS, Addl Manday KRS
Computer Printer (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) (3 (3 ))
Multifunction Printer (Print, Scan, Copy) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Multifunction Machine MFM (V2) (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Supply of Drier adsorbent and Ceramic balls for Mathura Refinery
Tea CTC (V2) (Defence) (Q2)
Hex head bolt for phonic wheel of CTRB M8x35 ( LHB shell with fiat bogies) as per RDSO drg. no. CG-15071 Alt. 1. Make of Hex Head bolt shall be as per ICF drg. no. T-0-2-619 Alt. y/12. Make:-TVS or DFL or Unbrako or Tuff only.
High pressure lockable gas spring for seat reclining mechanism (LOCKABLE GAS SPRING 550N LGS 50) Note:Details of manufacturer name, month &year of manufacturing , force and model no shall be legibly e
SRB Dip slide Test Kit, (Yeast & Fungi+ TBC) Dip slide Test Kit, (Pseudomonas+ TBC) Dip slide Test Kit, (E. coli+ TBC) Dip slide Test Kit
All in One PC (V2) (Q2), Multimedia Projector (MMP) (Q2), Multifunction Printer (Print, Scan, Copy) (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2), Multifunction Printer (Print, Scan, Copy) (Q2), Scanner (V3) (Q2), Line Interactive UPS with AVR (V2) (Q2) (3 (3 ))
Multifunction Printer (Print, Scan, Copy) (Q2) (3 (3 ))
Multifunction Printer (Print, Scan, Copy) (Q2), Computer Printer (V2) (Q2), Line Interactive UPS with AVR (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
SPECIAL REPAIR TO BLDG NO 30 VEER LINES UNDER AGE B/R-I OF GE (WEST) MATHURA
A SET OF HINGES FOR LOCO CORRIDOR TO CLW DRG. NO. CLW/AC/114 ALT-5 REF. HINGES NO. 6. A SET COMPRISES ONE NO. EACH OF LEFT HAND SIDE & RIGHT HAND SIDE HINGES. EACH SET SHALL BE TIED WITH A PIECE OF WIRE.
As per NIT
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
Reverse Osmosis based Water Treatment System above 50 LPH Capacity (V2) (Q2) (3 (3 ))
Entry and Mid Level Desktop Computer (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Multifunction Printer (Print, Scan, Copy) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
MS square tube 20x20x2 mm To Specification IS: 4923-97 WITH LATEST AMENDMENT NO.1 HFSHSGR YST- 210 in specific length of 6meter Accepted. The tube shall be oiled externally with rust preventive oil. Note: Material Test certificate from NABL certified Lab confirms to the above specification should be submitted along with supply.
SPECIAL REPAIR TO COOLING APPLIANCES AT MATHURA CANTT AND PROVN OF 12 X 2 TON AC IN BLDG NO P-199 UNDER GE (WEST) MATHURA
REPAIR AND MAINTENANCE OF FILTERATION PLANT AND ACCESSORIES UNDER GE (WEST) MATHURA
Entry and Mid Level Desktop Computer (Q2) (3 (3 ))
PROVN OF INTERLOCKING FOOTPATH AND HARDSTANDING WITH COVER AROUND BLDG NO P-199, P-260, P-264 AND P-250 AND OTHER SANCTIONED WORKS UNDER AGE BR-I OF GE (WEST) MATHURA
SPECIAL REPAIR TO HEATING APPLIANCES AT MATHURA CANTT UNDER GE (WEST) MATHURA
SPECIAL REPAIRS / REPLACEMENT OF OLD DISTRIBUTION PIPE LINE AT OD COMPLEX UNDER GE (WEST) MATHURA
RUBBER BASED ADHESIVE.SPECIFICATION NO. ICF/M/D/SPEC-028 (REV-4) AMENDMENT1 NB: MATERIAL SHALL BE PACKED IN 5 LITERS SUITABLE CONTAINER. [ Warranty Period: 6 Months after the date of delivery ]
Entry and Mid Level Desktop Computer (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Computer Printer (V2) (Q2)
Multifunction Printer (Print, Scan, Copy) (Q2) (3 (3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transmission Line; Comprehensive Preventive and Break Down Maintenance Patrolling etc of Various 400 KV 220 KV and 132 KV Line; Service Provider