Loading…
Loading…
2,406 results • Latest
WATER PROOFING OVER FLAT AND CURVED ROOF AND EXPANSION JOINTS TREATMENT AS PER SECTION VII
Rate Contract for Supply of Gases
Terminal Endsfor Aluminium Conductorsof Insulated Cables (Compression Cable Lugs) Conforming To IS8309 (Q3)
Electrolyte Analyser Consumables
A4and Legal Size Multifunction Printer (MFP) (Q2)
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3), Ready Mixed Paint, Air Drying, Red Oxide - Zinc Phosphate, Priming as per IS 12744 (Q3) (3 (3 ))
CIRCULAR CONNECTORS
Electro Magnetic Leakage Shielder with Accessories
Band Saw Machine (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2026/B/7119422 Dated : 27-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : . FOR EMD DD/PSD DD BENEFICIARY: "PAY AND ACCOUNTS OFFICER, NFC " FOR EMD BG/PSD BG BENEFICIARY: "THE REGIONAL DIRECTOR P&S ON BEHALF OF THE PRESIDENT OF INDIA Directorate of Purchase & Stores, Department of Atomic Energy, Nuclear Fuel Complex, HRPU, ECIL POST, HYDERABAD-500062" (A2/2039)
PERIODICAL SERVICES AND CERTAIN RELATED WORKS IN OMQ AREA OFFICER MESS GUEST ROOMS AND OTHER OTM BUILDING IN DOMESTIC AREA AT AFA HYDERABAD
Manufacturing of copper gaskets
Financial Audit Services - AS PER THE ATTACHED DOCUMENT; CA Firm
D Sub Connector, D Sub Connector M24308/24-1F, D Sub Connector M24308/24-35F, D Sub Connector M24308/23- 35F
TPKN 2204 PDR P30
CNC Turn-Mill Centre with Sub-spindle & Y-axis as per specification
IMU/AHRS sensor along with breakout board and thermal calibration
Non-percolating firefighting hose, confirming burst pressure 38 Kg/cm2 and Proof Pressure 23Kg/cm2 a
Facility Management Service - Outcome Based
Online Infrared non-contact pyrometer, detailed specifications as per the Annexure-I enclosed
Insert TPKN 2204 PDR K20
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
Light Weight Sleeping Bag (Improved) - CAPF (V2) (Q2) (3 (3 ))
High End Desktop Computer (Q2)
High End Desktop Computer (Q2)
LIGHTS AND STREETLIGHT POLES
Custom Bid for Services - IRC FOR PLANT ELECTRICAL MAINTENANCE WORK FOR PART-A1 and B1 AT GAIL RT CHERLAPALLY INCL GST FOR 2 YEARS, Custom Bid for Services - IRC FOR PLANT ELECTRICAL MAINTENANCE WORK FOR PART-A2 and B2 AT GAIL RT CHERLAPALLY INCL GST FOR 2 YEARS Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Operation and Maintenance Of Electrical Systems/Electrical Installations
Annual Maintenance service - EPABX System
High End Laptop - Notebook (Q2) ( PAC Only )
Supply of Corrosion Inhibitor for Ethanol Doping at HPCL POL
truermsclampmeter (Q3)
Helmet Mounted LED Lightor Helmet Partsor Accessories (Q3)
Operation And Maintenance Of Other Machines And Plants - Compaction of Zirconium fines at Zirconium Sponge Plant, Nuclear Fuel Complex, Hyderabad
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
IPA, ACETONE ANALYSIS, KOH, KFR, HPLC WATER, WATER DISTILLED, HPLC HEXANES, Nitric acid, Hexane, Heptane, Chloroform, HPLC METHNOL, METHNOL GR
Camera Based instant measurement system as per specification
Furnace oil conforming to specifications as per IS 1593: 2018 as per annexure attached
DC LINE FILTER CAPACITORS, 2000UF/450V. MAKE. KENDELL INDFARAD. PART NO KI01450202SHQ0J143 ( 20 the number pi ), DC LINK DAMPING CAPACITORS, 10000UF/450V. MAKE. KENDELL INDFARAD. PART NO KI01450103SHQ0J143 ( 20 the number pi ), OUTPUT DAMPING CAPACITOR, 50UF/900VDC, MAKE. WIMA PNO. DCP4N055009FD4KSSD ( 25 the number pi )
Custom Bid for Services - Manning Operation & Maintenance Contract of HT/LT Electrical DG Sets and IIIumination Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Automation tube loading and unloading system for tube straightening machines as per specification
Supply and installation of FLOAT TYPE LEVEL SWITCHES AT
XLPE Cable for Working Voltage up to and Including 1.1 KV Marked To IS 7098 (Part 1) (Q2) ( PAC Only ) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Facility Management Service - Outcome Based
Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
Facility Management Services - LumpSum Based - Hostel and Guest House Indoor and Outdoor Area; Housekeeping, Horticulture Services, Pest Control Service, Cleaning Sanitation and Disinfection Services Sweeping and Mopping; Consumables to be provide..
Advance Polarization Microscope (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Design, fabrication, supply, I & C of automated twin tube de- burring machine as per specification
Annual Maintenance service-AIR CONDITIONER
EN 8