Loading…
Loading…
153 live61 closing this weekmost from Directorate of Local Bodies UP and U P Irrigation Department (Civil)
153 results • Latest
Partial drain repair cover and interlocking road work form kaju halwai to ram khelavan house on city cart road in pokhari ward of bhatwa.
interlocking road work from ramji kesharwani to vasliganj chowk on the north track of sankatmochan ward.
work of retaining wall soil filing drain and interlocking from radheshyam kasera house to vishnu kasera house in the street in front of mata prasad school in imamganj ward.
construction of c.c road from ashok house to jai singh house and from seema yadav house to pawan kumar gupta house via vikas yadav house in vinay colony in bashi ward.
work of retaining wall soil filling new drain cover and interlocking from om shankar house to near bharat kesherwani house in gokuldham colony in bathua ward.
Repair and construction of cover of both track of drain from basant lal house to rammohan in machhlipul gali in ghantaghar ward.
construction work of retaining wall soil filling new drain cover and interlocking road from om nagar colony munna patel to ram kishore mourya and rekha devi in bathua ward.
new drain cover and c.c work from chunnu saav house in rani bagh in bajirav katra ward to parvati devi house via ashok jaiswal.
constrcution work of soil filling retaning wall new drain and cover from kanhaiya gupta house to shivam maurya house next to the hut in the street front of the tahsil in shuklaha ward.
Drain repair and c.c work from water tank to shri gulzar house in bagkunjal giri ward.
partial drain repair work new drain cover and interlocking work on the northen side of the road from tiwarani tola near shankar ji temple to olierghat turn in basnahi bazar ward.
interlocking work from parasnath jaiswal house to ashwani gupta house on the west side track on the main road in ganeshganj.
in purani dashmi ward no 17, from bihari pehalwan house via rajaram house to ramchandra prajapati house work of drain cover and c.c on both side.
construction work of retaining wall, drain repair cover and c.c road from the house of amresh chandra gupta via upadhyay ji house mahendra mishra house via ashukant chunahe house suredra kumar sing house gupta ji kesharwani house in krishnapuram .
In station ward in pt gupt ram gali from sanjay prajapati house via gupt ram school mode to rajnath house work of drain repair cover and construction of c.c road.
in Gosail talab ward in mrityunjaypuram colony from maurya ji house to shailendra tiwari house and from shankar ji temple to aditya keshari work of earth filling partial retaining wall and construction of c.c road.
Steel Tubes used for Water Wells (V2) as per IS 4270 (Q2) ( ( 3 3 ))
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Supply of aluminium self supporting ladder at various substation under ETD-IV, Varanasi; Substation; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Transformer oil collection and testing of DGA/BDV/PPM of various 220/132 KV power transformers installed at 220/132 KV substation under ETC, Mirzapur; Substation; Servic..
Partial drain repair cover and c.c work from suresh pandey house via ashok pandey to ankaj mishra house via sudhir tiwari to baraundha main road in panditan basti baraundha ward.
construction of c.c road from the main road to tolan house to k.n pandey house in the lane next to motiyajheel in vindhyachal ward.
cross pipe chamber repair from formar councilor bambam house to rinku yadav house in bhaisahiya tola in south sabri ward and new drain and cover work on both sides of the road in jaiswal colony.
In daghar ward in surekhapurma colony from sanjay dubey house via pandey house via amresh add from kunal singh house to shankar ji temple work of earth filling retaining wall new drian cover and c.c
construction of partial retaing wall earth filling new drain covered c.c road from rajkumar house to rajje house in sudarshan colony in sangmohal ward.
In chandradeepa ward, from sangeeta singh house to golu baba house via munna prajapati house earth filling retaining wall and c.c work.
In Danghar ward work of laying new drain on one side partial soil filling interlocking and steel bench installastion iron gate open gym partial kota stone in danghar park.
construction of partial retainling wall and c.c road from munna saroj to nanhak pandey house on neebi bhadauha road in fataha ward.
construction work of drain repair cover and c.c road from mohan mali house to shri govind bind house at rehra chungi in shivpur ward.
1. -W90310764068-ADANI-SHAFT SEAL COMPENSATOR IN FINISH MACHINED CONDITION AS PER BOM NO. 0107645800
MOH. DARGAHSHARIF PURVI WARD NO. 17 ME MAIN ROAD SE ACHARYA JI SE DINESH KUSHWAHA KE MAKAN TAK INTERLOCKING MARG AVAM RCC NALI KA NIRMAN KARYA
MOH. SARAYTEKOUR WARD NO. 9 ME MAHMOOD ALAM KE GHAR SE SHANKARJI SE DINESH KUSHWAHA KE MAKAN TAK INTERLOCKING MARG AVAM RCC NALI KA NIRMAN KARYA
MOH. CHAKAIPUR WARD NO. 11 ME THANE KE PAS PUMP HOUSE SE PRAVIN SINGH KE MAKAN TAK INTERLOCKING MARG AVAM EDGING KA NIRMAN KARYA
MOH. GANGESHWARNATH WARD NO. 23 ME PRATHMIK VIDALAY THANA CHAUK SE RAJKIYA VIDDYALAY HOTE HUE VIDYARTHI PUSTAK KENDRA KE AGE TAK INTERLOCKING MARG KA NIRMAN KARYA
MOH. SETELMENTAREA WARD NO. 7 COMPOSIT VIDYALAY KE CAMPUS ME INTERLOCKING MARG AVAM EDGING KA KARYA
MOH. SETTELMENT AREA WARD NO. 7 ME RAMGHAT SE KARTAR SABHASAD KE GHAR KE AGE TAK INTERLOCKING MARG KA NIRMAN KARYA
zonal accesseries
PADDY 2026-27 AND WHEAT 2027-28 HANDLING WORK CENTER IN PCF MIRZAPUR
Strengthening of dilapidated road sections of NH-135C from km. 84.600 to km. 85.290, km. 85.750 to km. 86.950, km. 87.210 to km. 87.360 and km. 105.000 to km. 105.170 for providing safe connectivity under Special Repair.
Annual Repair and Maintenance of ESIS Hospital Naini, Prayagraj and its attached staff quarters along with attached dispensaries, Branch Office, Staff Quarter and other Buildings at Mirzapur (Annexe), Shahjanwa (Gorakhpur), Gorakhpur (Annexe) (Civil
MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 15 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 18 M HEAD SUBMERSIBLE PUMPSET, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 21 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 24 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 27 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 30 M HEAD SUBMERSIBLE PUMPSET, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 33 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 36 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 42 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 48 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.0 Cusec (102 M³/HOUR) DISCHARGE CAPACITY 54 M HEAD SUBMERSIBLE PUMPSETS
MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³/HOUR) DISCHARGE CAPACITY & 15 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 18 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 21 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 24 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 27 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 30 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 33 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 36 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 42 M HEAD SUBMERSIBLE PUMPSETS, MANUFACTURE & SUPPLY OF 1.5 Cusec (153 M³ HOUR) DISCHARGE CAPACITY & 48 M HEAD SUBMERSIBLE PUMPSETS
Goods Transport Service – Per KM Based Service - Mail Bag; Closed Body LCV Truck; 14 FT LCV
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Painting of equipment in 132 KV & 33 KV switchyard installed at 132 KV substation Bhadohi under ETD-IV, Varanasi; Substation; Service Provider
Dismantling erection and maintenance work of pontoon bridge
Dismantling erection and maintenance work of pontoon bridge
Dismantling, erection, and maintenance work of pontoon bridge
Dismantling erection and maintenance work of the pontoon bridge
CSR Project Monitoring, Evaluation and Impact Assessment Service - Others; Cost Estimate for Providing Installation testing and commissioning of Control Panel Cum Battery Charger for Kirloskar Oil Engines Ltd Make Diesel Engine installed in Emulsifi..
CSR Project Monitoring, Evaluation and Impact Assessment Service - Others; Cost estimate for Installation of oil detector kit in Nitrogen Injection Fire Protection System for 220/132 KV, 160 MVA T/F-I (EMCO Make) at 220 KV S/S Mirzapur Under ETD Mirz..