Loading
Loading…
Loading…
58 results • Latest
Construction of Brick Channel in Feeder Canal (Reach 0.00 Km to 0.250 Km) At Deegh Pump Canal.
Construction of Brick Channel in Feeder Canal (Reach 0.300 Km to 0.560 Km) At Deegh Pump Canal.
Contruction of Boundary Wall At Deegh Pump Canal
FOOD GRAINS HANDLING AND TRANSPORT WORK
Flood Relief Kit
Chanelisation and lining works from Km. 0.000 to Km. 0.100 of Scape at Km. 40.055 of Meja Jirgo Link Channel.