Loading…
Loading…
58 results • Latest
Construction of Protection wall on Right bank B/W Km 68.000 to 68.350 ,Km 68.450 to 68.650 and Guard wall between Km 64.900 to 70.700 on L/S bank of Meja Jirgo Link Canal.
Construction of Fall and VRB on Escape Channel at Right Bank of Km 67.850 of Meja Jirgo Link Canal
Construction of Linning of Virohiya Escape in between km 0.00 to km 0.150 situated at km 51.080 of Meja Jirgo Link Canal.
Channelization and Pucca Work between km. 0.000 to km. 0.190 of the channel joining Lower Khajuri from the Left Bank of M.J.L.C at km. 46.305
Construction of C.R. stone masonry wall for prevention of seepage between Km 63.835 to Km 64.395 of Meja Jirgo Link Canal and construction of side drain for safe drainage of mountaineous water to drainage crossing.
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7