Loading…
Loading…
1,971 results • Latest
"Construction of Proposed Type II Staff Quarters- Two High Rise Towers of (G+3P+21 Floors) (240 Flats)"at Jogeshwari (East) in connection with Extension of Harbour Line between Goregaon to Borivali station (MUTP 3A).
Heavy Duty Solvent Based Rubber Adhesive
MS/ST Polymer Metal to Metal Bonding Sealant and Sealing Sealant
Comprehensive Annual Maintenance Contract (CAMC) of Emergency talk back system of AAL make on single tender basis for 3 years with M/s Autometer Alliance Limited. Qty- 1773 Rake months.
Comprehensive Annual Maintenance of CCTV system in EMU/MEMU coaches of Mumbai Division, Central Railway for a period of 02 years (24 Months).
6 yearly Overhauling of complete 3 phase AC Traction motors of HHP locomotives (All makes) of Diesel loco shed, KYN as per scope of work including replacement of must change items
Providing communication and security system for DIAS facility, Anushaktinagar, Mumbai, 4000094