Loading…
Loading…
8,829 results • Latest
Installation of LED solar street light as per ANNEXTURE-XX Under Beldanga-I Dev. Block
At Booth No- 120 1) Renovation of Bagdanga Primary School under Madhurkul GP under Domkal Development Block, Murshidabad under APAS fund
Construction of Community Toilet infront of Ahela Hadis Masjid at Nawdapara
At Booth No- 245 i) Repairing of 253 nos ICDS Centre building and toilet at Srikrishnapur ii) Repairing of door and window of Srikrishnapur Pry. School at Srikrishnapur iii) Repairing road from Arjun tola to Jiyarul house at Srikrishnapur
Construction of Community Toilet infront of Rashid sk house at Srirampur
Construction of Community Toilet near Saha para Durga Mandir at Gopinathpur
Construction of Community Toilet near Subhani More at Keshabpur
Construction of CC roads from Sajjad sk house towards Asadul house at Durgapur
CONSTRUCTION OF C C ROAD FROM SOLEMAN SK SHOP TO BAKUL SHOP AT MUNSURPUR
Construction of CC road from the Dinamuddin house toward Gopinathpur Gorosthan at Gopinathpur
Construction of CC roads from Saidul sk house towards Gorosthan at Hasanpur
Construction of CC Road from Monikanda Bus Stand to Eid Gah at Kharguna G.P. under Burwan Block (Length of the Road 1.5 Km). in Murshidabad District.
Construction of CC drain with cover from Sahi Masjid to Fani Miya house at Sahapur.
Construction of CC Road from Fatepur Abupara Moijuddins house towards Godhanchak. at Maiya G.P. under Lalgola Block (Length of the Road 1.650 Km) in Murshidabad District.
Construction of Car bike parking shed at NTPC Farakka
Construction of PCC Road from Sahajadpur Dokkhin Faijuddin Sks House to Shisa Masjid via Poliya Mukundopur at Amarkundu G.P. under Nabagram Block (Length of the Road 0.7 Km). in Murshidabad District.
Construction of New bathing Ghat at uttarpara BURO pukur at Munsurpur.
Construction of Concrete road from Firoj sk house to Rubina Bibi house at syedkulut.
Construction of Community Toilet infront of Durgapur Purbapara Jumma Masjid at Durgapur
Interactive Panels with CPU (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6956786 Dated : 27-01-2026 Bid Document 1/16 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 5084491 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI EMD Amount 100000 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : NTPC Limited AGM (C&M-Purchase) NTPC Limited, 9th Floor, Tower-C, Commercial Complex Plot No:C-03, Central Business District (CBD), Sector-21, Atal Nagar Nava Raipur, Chhattisgarh, Pin Code-492018 2/16 (Ntpc Limited)
Construction of Community Toilet in front of Muklesh sk land at Durgapur,Sansad -V, under Lochanpur GP
Construction of Drain for Diversion channel from existing drain to ABR at Munsurpur village.
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero; Ex-showroom; As per Tender; A/C; As per Tender
Construction of concrete road from Das para PWD road to Haradhan sardar house at bholta.
Construction of CC roads from the house of Sajjad sk toward the house of Rejaul Sk at SK Para Lochanpur
Construction of 08 Bedded Mahila Barrak at BOP Bamnabad of 117 (Now 73 ) BN BSF under SHQ BSF BHP (SH Providing EI,Fans,service connection, off grid solar plant and solar water heater)
Construction of CC roads from Marjem sk house towards Rabi sk house at Melanpur
Construction of concrete road from Sagar Mondal House to Anartha Mondal house at Bholta village
REPAIR AND MAINTENANCE OF GANGA BUILIDNG H/O BY CPWD ALONG WITH PERIODICALS AND DAY TO DAY REPAIRS INCLUDING VARIOUS MISC SERVICES AND OTHER B/R RELATED WORKS AT 25 ACRE LAND AND OTHER ALLIED AREAS AT CG HALDIA UNDER GE (I) (CGN) KOLKATA
Comforters & Sets-Handicraft (Q3) (3 (3 ))
PROVISION OF ROAD ALONG PERIPHERY OF BOUNDARY WALL AT CG LAND RAJARHAT UNDER GE (I) (CGN) KOLKATA
Feeler Gauge
Construction of Water Treatment Plant (Sajaldhara) Infront of Skpara Lochanpur Jumma Masjid for supply of safe drinking water to the Community of Skpara Lochanpur , Sansad No-12
Sweeping, collecting and dumping at fixed places in evening shift at New Duffrin Road, CBT Dharmatola, Rani Rashmoni road including all footpath and tram line of this zone and removing garbages from different garbage point to nearest Vat within Kolk
Daily maintenance of greenery hedge/ garden including cleaning, watering, nursing of the plants at northern side of Queens Way and Bagha Jatin Island under City Division, PWD for the period of 1 (One) year.
Short term Maintenance Work for 4.354 KM of NH-133A from Ch. 0.000 KM to Ch. 4.354 KM of NH-133A under N.H. Division No. VII, P. W. (Roads) Directorate in The District of Murshidabad during the year 2025-2026 _Job No. NH-133A-WB-2025-26-STMC-16
Handling, Transport and Other Mining Services - Percentage quote based - Handling Service
Executive Engineer, Feeder Canal Division, Farakka
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6300 m Ch 6600 300 mtrs (Reach 04) near Nayansukh Brhamngram under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti-erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 6000 m Ch 6300 300 mtrs (Reach 03) near Nayansukh under Feeder Canal Division, Farakka Barrage Project
Interim measures for anti erosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5700 m Ch 6000 300 mtrs (Reach 02) near Nayansukh under Feeder Canal Division, Farakka Barrage Project.
Interim measures for antierosion work on the right bank of river ganga downstream of Farakka barrage between Ch 5400 m Ch 5700 300 mtrs. (Reach 01) near Nayansukh under Feeder Canal Division, Farakka Barrage Project.
Supply, Installation and Commissioning of IOT based Hydrostatic Pressure Water level Sensor for underslung water tank etc.
SUPPLY, INSTALLATION AND COMMISIONING OF IOT BASED WATER LEVEL INDICATOR SYSTEM FOR LHB NON AC ETC.
Supply, installation and commissioning of Eddy Current Array (ECA) Testing Equipment for testing of LHB wheel
Platform Step Ladder (V2) (Q3)
Wall mounted strength board for communication complex, Index Cabinet for mechanic console, Executive Table for Exchange Operator
Country Jute Twine (V2) asper IS1912 (Q3)
DEVELOPMENT OF STREET LIGHTING SYSTEM AT 3A/B,9,9/5,11, MUNSIGAUNGE ROAD,2/6/5, NRITYA GHOSH STREET AND ITS SURROUNDING AREAS IN WARD NO-75.
Aluminium Phosphide Formulation (V2) Conforming to IS 6438 (Q2) ( ( 3 3 ))