Loading…
Loading…
441 results • Latest
RETINAL IMAGING DEVICE
CALIBRATED BLOOD COLLECTION DRAPE
Construction of road from Sindhikaguda to Badani under MMSY-Connecting Missing Road Links (MMSY-CMRL) in the Districts of Nabarangpur for the year 2025-26
Construction of road from NH-26 to Sandaibhata under MMSY-Connecting Missing Road Links (MMSY-CMRL) in the Districts of Nabarangpur for the year 2025-26
Construction of Banipadar Chowk to Siunguda Via Dhundubeda Road in the District of Nabarangpur under MMSY Transferred Road Improvement Programme (MMSY-TRIP) for the year 2024-25.
Construction Of Hundadhadgi PR road to Mohinapodar and Kamosahi in the dist of Nabarangpur under Mukhya Mantri Sadak Yojana for the year 26-27
Improvement to L091-Kaudola to Belpara Road in the District of Nabarangpur under MMSY-Improvement of Existing RD Road for the year 2025-26.
Taragam SH Jn to Kukudakonadi SH Jn. _Road_1000mm dia single row HPC,Toe wall-16 mtr- and Bush cutting,other road safetyAt 1.800 km 0.000 to 2.000
Construction of Jharigam PWD road near Karmari to Ghalghaliaguda in the dist of Nabarangpur under Mukhya mantri Sadak Yojana (MMSY) for the year 26-27
Merai to Jhadiaguda__SDBC, Fixing of Road furniture 0.000 to 2.600
Mudinayakguda to Pakhnadongriguda Road__SDBC and CC overlaying0.000 to 1.400 1.550 to 2.000and 1.400 to 1.550
Repair to Bridge over Local Nallah on SH39 Jn. to Buchiaguda Road _Road_WMM, SDBC to Bridge approach10.000 to 11.480
Borigam RD road to Godamaguda via Mendriguda road__SDBC, Berm Filling0.000 to 1.000
Maidalpur to Gadabakotra-Road-A-__ SDBC, Fixing of Road furniture 0.000 to 0.400
Entry and Mid Level Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) ( ( 3 3 ))
Entry and Mid Level Desktop Computer (Q2), A4 and Legal Size Multifunction Printer (MFP) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Repair of Boundary Wall at Kerandimal Ashram School under Kosagumuda Block
Repair of Boundary Wall at Govt. SSD High School, Kodinga under Kosagumuda Block
Repair of Class Rooms at Govt. SSD Girls High School, Kodinga under Kosagumuda Block
Repair of Boundary Wall at Govt. SSD High School, Kotraguda under Nandahandi Block
Repair of General Girls Hostel Builiding at Govt. SSD Girls High School, Kotraguda under Nandahandi Block
Repair of 100 sated Girls Hostel Building at Govt. SSD Girls High School, Kotraguda under Nandahandi Block
Repair of Class Room at Ashram School, Betal under Nabarangpur Block
Repair of Boundary Wall at Govt. SSD High School, Bhatrasiuni under Nabarangpur Block
Construction of Additional Class Room at Palia Ashram School under Jharigam Block
INSULATED FOOD CONTAINERS
Landuguda Jn to Landuguda Road
RD Road to Kartiaguda1 Road
NH 26 Jn to Jharbandha Road
Improvement to the damaged Bituminous approach Road on left Flank of Muran Dam under UIDC, Khatiguda.
Annual Maintenance to whole garden at Downstream of Muran Dam (Right Flank) for one year under UIDC, Khatiguda.
Annual Maintenance of Muran Masonry and Concrete Dam by cleaning of dam top, removal of calcination debris, silt and muck from galleries, painting of iron grills and sign boards, and cleaning of the periphery of Muran Dam under UIDC, Khatiguda.
R.D.Road to Ravanaguda Road__SDBC, Berm Filling, Fixing of Road furniture 0.000 to 2.700
Project road to Bhinjiguda road -B-__ SDBC, Toe wall -40 m- 0.000 to 0.900 0.200 to 0.240
Attigam Hatapada to Bankuli Chhaka Road__SDBC, Fixing of Road furniture 3.000 to 4.620
CIVIL WORKS
Civil works
CIVIL WORKS
Construction of New 100 Seated Hostel Building at Pendrani Maha Vidyalaya, Umerkote under Umerkote Block
Construction of New Branch Office Building of TDCCOL at Umerkote under Umerkote Block
Construction of 100 seated Boys Hostel Building at Panchayat High School, Parchipara under Raighar Block
Construction of 100 seated Hostel Building at Kundei High School under Raighar Block
Construction of 100 seated Hostel Building at Rabishing High School, Anchala under Umerkote Block
SUB-HEAD - Civil Work including Electrical work, Sanitary and Plumbing, External Water Supply System, Fire Protection System, Street Light, DG Set, CCTV, Landscaping and other Allied Works etc
Construction of Goadabarisha Mishra Adarsh Prathamik Vidyalaya GMAPV- 2No. at Bhursundi DNK GP-Guna, Block - Raighar, and at Kadribeda Govt. UPS GP-Kumuli, Block -Raighar, District-Nabarangpur, Odisha PKG-I
Line Interactive UPS with AVR (V2) (Q2) ( ( 3 3 ))
Construction of two nos. of Ferry Ghat near Benakhamar for the villages Kanasukuli and Maligaon, UIDC, Khatiguda.
Improvement to the road connecting Indravati Dam with PWD road at Khatiguda to Rest shed.
Construction of concrete drain and causeway in between RD 1210.00 m to RD 1365.00 m near Nuamajhiguda along the road from Paraja Deopali village to Indravati Dam, UIDC, Khatiguda.
Renovation to rest Shed/lower IB with painting, flooring and replacing of all damaged window/door with new window/door along with sanitary fittings of UIDC, Khatiguda.