Loading…
Loading…
10,656 results • Latest
Engagement of Architectural- Engineering consultancy firms for Preparation of DPR (including Vetting) including Architectural, Structural and Electrical Design and Preparation of BOQ and Estimate of Amusement Park of Kalyani Lake Park at Kalyani, N
Repairing of ICDS Centre at Sabdalpur Math Para.SABDALPUR JUGALKISHORE GP (APAS/01/089/223/0002)
Repairing of Jhama Bats Road from Sabdalpur Deep Tubewell to the Manasha Mandir,SABDALPUR JUGALKISHORE GP (APAS/01/089/223/0001)
Repairing of Cement Concrete Road from H/O- Balai Ghosh to the H/O- Kalu Palchoudhury,SABDALPUR JUGALKISHORE GP (APAS/01/089/220/0002)
Construction of Cement Concrete Road from H/O- Kanchan Biswas to the H/O- Dilip Biswas,BIRA JUGALKISHORE GP (APAS/01/089/218/0002)
Construction of Cement Concrete Road from H/O- Ali Hossain to the H/O- Asadul Sardar,BIRA JUGALKISHORE GP (APAS/01/089/218/0001)
Construction of CC road from H_O Abhijit Das to H_O Mahadeb Das at Tentia Sansad III under Chakdingar GP under Krishnagar I Block under APAS 2025 26. ID APAS_01_085_197_0002. Sl. No. 5
Construction of Bituminous Road from H/O- Tanmay Roy to the H/O- Shekher Sarkar,BASTA JUGALKISHORE GP (APAS/01/089/217/0001)
Repairing of Rikshow Stand at Basta Bajar,BASTA JUGALKISHORE GP (APAS/01/089/216/0001)
Construction of Bituminous Road from Basta Graveyerd to the H/O- Mansur Ali Mondol,BASTA JUGALKISHORE GP (APAS/01/089/215/0001)
Construction of CC road from H_O Parikshit Goldar to H_O Suman Golder at Tentia I under Chakdingar GP under Krishnagar I Block under APAS 2025 26. ID APAS_01_085_195_0002. Sl. No. 2
Construction of modified community leach pit (5HH, 19 nos) Phase-XII,at Jagadanandapur Under Bethuadahari-I GP
Construction of CC Road from h/o Ramesh Barui to h/o Ananda Das at Ektarpur J.L. no. 114 Under Rautari
Mobilization and Supply of men and machineries including operation of the same i.c.w. removal of encroachments and cutting and removal of broken trees or branches within the jurisdiction of Kgr. SD and KC- I SD, P.W.Dte. for the period of one year
Mobilization and Supply of men and machineries including operation of the same i.c.w. removal of encroachments and cutting and removal of broken trees within the jurisdiction of Plassey SD, P.W.Dte. for the period of one year
Installation of solar street light (10 nos) at various places of Kharer math Paschim para (80/42) under Barachandghar GP
CONSTRUCTION OF SHADE INFRONT MAJHER MAJDIA BAROYARY (ANNAPURNA CLUB) AT MAJDIA(PART-32) (Booth - 90/32 , Habibpur GP, Source of fund - APAS)
CONSTRUCTION OF CC ROAD FROM H/O ABU SK TO H/O ALTAB SK UNDER MIRA 1 GP
Instalation of water tretment plant with solar system at 48 No pry school at Chandpur Sansad-XV
REPAIRING OF AWC AND INSTALLATION OF TUBEWELL AND ARRENGMENT OF FAN, CENTRE NO 163. UNDER MIRA 1 GP.
AIR HOSE PIPE(H/DUTY), Make-JK, Alpha, Parker, Diamond. GI wire embeded between the reinforcement. OD-45mm
Heavy Duty Pedestal Fan
CONSTRUCTION OF (6 NOS) VAT AT VARIOUS PLACE UNDER 80/23 AREA UNDER MIRA 1 GP
CONSTRUCTION OF CC ROAD FROM H/O H/O SUVENDU SWARNAKAR TO H/O GOUTAM MISTRI (80/22)
INSTALLATION OF(10 NOS) SOLAR LIGHT AT VARIOUS PLACES(80/22)
Repairing, Renovation and maintenance of Tubewell of various sites under Santipur Panchayat Samity. (Fund-15th FC)
Repair and extension of Tin Shed at Santipur Panchayat Samity Office Premises under 15th FC fund 2025-26 (Activity Code-116495557)
REPAING ROAD FROM H/O REJAUL SK TO OJDAHAR SK HOUSE AT HAZRAPOTA
LABOUR CHARGE FOR BLACKSMITH OF IMPELLER BACK SHEET, AS PER ANNEXURE-III ATTACHED, LABOUR CHARGE FOR BLACKSMITH OF IMPELLER CONE SHEET
CONSTRUCTION OF DRAIN FROM HOUSE OF MUKBUL SK TO HOUSE OF JAHIR SK AT MOLANDI UNDER BARACHANDGHAR GRAMPANCHAYAT.
CONSTRUCTION OF DRAIN FROM HOUSE OF ASAN SK TO HOUSE OF BADAR SK AT BCG UNDER BARACHANDGHAR GRAMPANCHAYAT
CONSTRUCTION OF DRAIN FROM BATTALA MASJIT TO HOUSE OF KALAM SK AT CCG UNDER BARACHANDGHA GRAMPANCHAYAT
CONSTRUCTION OF SHADE AT DAKSHIN MAJDIA BAROYARY TALA AT MAJDIA (PART- 31) (Booth - 90/31 , Habibpur GP, Source of fund - APAS)
INSTALLATION OF 10-NOS SOLAR LIGHT (PHASE-II) AT VARIOUS PLACE UNDER PART-26(DUTTAPARA). (Booth - 90/26 , HABIBPUR GP, Source of fund - APAS Fund)
Construction for Cement Concrete Road Near Vivekananda Club to Samir Sikder (L100m), Samir Sikder to Sibu Dey (L92m 25m) at ward no 12 under the scheme of PMAY HFA(U) (ID Works)
INSTALLATION OF HIGHMAST SOLAR LIGHT(9.00 MTR.)INFRONT H/O NIDHIR SARKAR AT BELDANGA UNDER PART-30 (Booth - 90/30 , HABIBPUR GP, Source of fund - APAS Fund)
Construction for Cement Concrete Road Near Pinki Bapari to Mithun Biswas (L106m), Gautam Kharati to Chandan Biswas (L106m), Dayamay Das to Culvert and Jyotsna Mondal to Rajib Saha (L10m) at ward no 11 under the scheme of PMAY HFA(U) (ID Works)
CONSTRUCTION OF CC ROAD FROM H/O SAHADEB DAS TO H/O NITAI DAS AT HARITALACOLONY PART-28 (Booth - 90/27 , HABIBPUR GP, Source of fund - APAS Fund)
Construction for Cement Concrete Road Near Rajkumar Nayek to Kali Mandir (L153.3m) at ward no 10 under the scheme of PMAY HFA(U) (ID Works)
REPAIRING OF BLACK TOP ROAD FROM SHOP OF ASHOKE SAHA TO H/O MITHUN MANDAL AT HARITALACOLONY PART-27 (Booth - 90/27 , HABIBPUR GP, Source of fund - APAS Fund)
CONSTRUCTION OF PCC ROAD FROM SHOP OF PRADIP KUMAR GHOSH TO H/O AKHIL SARKAR AT KALABAGAN DASPARA UNDER PART-29 (Booth - 90/29 , HABIBPUR GP, Source of fund - APAS Fund)
CONSTRUCTION OF PCC ROAD FROM NH-12 TO H/O SANJIT MODOK AT BINPARA UNDER PART NO-29 (Booth - 90/28 , HABIBPUR GP, Source of fund - APAS Fund)
CONSTRUCTION OF PCC ROAD FROM H/O PARERSH GHOSH TO H/O LAXMAN GHOSH AT BINPARA UNDER PART NO-28 (Booth - 90/28 , HABIBPUR GP, Source of fund - APAS Fund)
CONSTRUCTION OF TIN SHADE INFRONT OF BELDANGA RADHAGOBINDA MANDIR UNDER PART-30 (Booth - 90/30 , HABIBPUR GP, Source of fund - APAS Fund)
LABOUR CHARGES FOR MANUFACTURING TRANSPORT CRADLE
ELECTRIC COLLECTION AWC (161) NO AND ARRENGE FAN (SOLAR SYSTEM) AND WALL PAINTING
Construction for Cement Concrete Road Near Bipul Halder to Ujjal Gharami (L124m), Bholanath Dey to Shankar Mitra (L80m) at ward no 9 under the scheme of PMAY HFA(U) (ID Works)
Construction for Cement Concrete Road Near Shikha Adhikary to Biren Dhali (L56m), Khitish Gharami to Shambhu Das (L54m), Swapan Mondal to Subhash Halder (L81m) at ward no 8 under the scheme of PMAY HFA(U) (ID Works)
CONSTRUCTION OF CC ROAD FROM THE H/O MOMIN SK SHOP TO ALAN SK HOUSE AT HAZRAPOTA
Construction for Cement Concrete Road Near Ashoke Biswas to Jharna Dutta (L55m), Basudeb Shil to Pintu Mukherjee (L38m), Shyamal Mistry to Khokan Poddar (L18m 21m39m), Buro Das to Panchanan Adhikary (Three sides of Park) L55m, Susanta Adhikary